What it is
Carbine (8201G13501) is an Army procurement line funded in the Procurement of Weapons and Tracked Combat Vehicles, Army account.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$8.57MP-1 TOA · PB2026
FY25 Enacted
$8.00MP-1 TOA · PB2026
FY26 Request
Not in the FY2026 J-books we ingested
FY25→26 Change
No comparison: endpoints unavailable or on different bases

No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2025. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 2 summary figures for FY24 to FY25, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 2 summary figures for FY24 to FY25, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $8.57MFY25: $8.00MFY24FY25
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$8.57M
FY25$8.00M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

4 fiscal years of this program as published (FY2022–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span, and 1 year is a break in the line rather than a low value: an edition the program is absent from, never interpolated. The grid below is the same data as text, one cited figure per cell.
4 fiscal years of this program as published (FY2022–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span, and 1 year is a break in the line rather than a low value: an edition the program is absent from, never interpolated. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY22FY23FY24FY25

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25
Actuals$7.23M–$8.57M
Enacted–$0$571.0K$8.00M
Request––$571.0K$3.00K

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $571.0K for FY2024; the PB2026 book reported $8.57M as actual total obligation authority — $8.00M above the request. 8.6 − 0.6 = 8.0 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Carbine

The Carbine program supports the National Defense Strategy (NDS) of "Build a More Lethal Force" through enhancement of Joint Lethality in contested environments by minimizing and eliminating erosion of close combat capability relative to peer competitors in complex terrain. This funding line is used to procure M4A1 Carbines for the Army and 30 round Enhanced Performance Magazine (EPM). The M4A1 Carbines are 5.56mm, gas operated, air-cooled weapons designed for lightness, speed, mobility and firepower. The M4A1 Carbine is a more compact weapon than the M16 rifle series since it uses a shorter barrel and collapsible stock. When compared to the M4 Carbine, the M4A1 Carbine has a (safe/semi-automatic/full automatic) trigger group, with a heavier barrel thickness to support increased sustained rates of fire, and an ambidextrous fire control selector. The M4A1 Carbine also includes a back-up iron sight and the adapter rail system to attach accessories and components.

Justification

Justification — Carbine

There is no FY 2026 budget request for this funding line. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. M4A1's Army Acquisition Objective (AAO): 845,563

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY24 Actuals$8.57M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY25 Enacted$8.00M

Exhibit P-1R

AccountOrgTypeAmount
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY24 Actuals$522.0K

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 Total
Program Element$285.2M$8.57M$8.00M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Carbine. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.