Printed from https://fiscalreceipts.com/program/8190G01506/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Precision Sniper Rifle
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $7.75M
- FY26
- $1.85M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $9.51M | $6.44M | $7.75M | ||
| Enacted | – | $6.44M | $5.25M | $5.91M | |
| Request | – | – | $5.25M | $5.91M | $1.85M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $5.25M for FY2024; the PB2026 book reports $7.75M actually spent — $2.50M above the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Precision Sniper Rifle
The Precision Sniper Rifle (PSR) program supports the Army Modernization priorities (Build a More Lethal Force) through enhancement of Joint Lethality in contested environments by minimizing and eliminating erosion of close combat capability relative to peer competitors in complex terrain as outlined in the National Defense Strategy (NDS). Precision Sniper Rifle (PSR) will become the primary anti-personnel Sniper Weapon System (SWS) in all Army Sniper Teams. On 31 March 2021, the U.S. Army awarded contract W15QKN-21-D-0028 to Barrett Firearms MFG, Inc. The contract is a 5-year Firm Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ) contract for production and delivery of the MK22 Precision Sniper Rifle (Multi-role Adaptive Design (MRAD) commercial variant) to support an Army Acquisition Objective (AAO) of 2,800 systems. It is a Non-Developmental Item (NDI) that is a multi-caliber, bolt-action sniper rifle, which is effective against personnel and materiel targets at extreme ranges. The Precision Sniper Rifle (PSR) provides increased probability of hit over the current M2010 Enhanced Sniper Rifle (ESR) configuration at distances beyond twelve-hundred (1200) meters, which enhances the sniper role in supporting combat operations and improves sniper survivability. The Precision Sniper Rifle (PSR) provides extended effective range by three-hundred (300) meters over M2010 Enhanced Sniper Rifle (ESR) out to fifteen-hundred (1500) meters, which increases stand-off distances ensuring overmatch against enemy counter sniper engagements and increases sniper capabilities. The Precision Sniper Rifle (PSR) also replaces the anti-materiel M107 semi-automatic .50 caliber sniper rifle, offering improved accuracy in a lighter weight package. The Precision Sniper Rifle (PSR) includes a sound suppressor and direct view optic with fire control capabilities. This allows snipers, when supplemented with a clip-on image intensifier or thermal sensor system, to effectively engage enemy snipers, as well as crew served and indirect fire weapons virtually undetected in any light condition.
Justification
Justification — Precision Sniper Rifle
FY 2026 Base procurement dollars in the amount of $1.853 million supports the procurement of 50 Precision Sniper Rifle (PSR) Systems. The level of effort remains consistent FY 2022 - FY 2026 to support fielding and engineering support. Army Acquisition Objective (AAO): 2,800 In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.
Budget Line Items(workbook-cited)
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY24 Actuals | $7.75M |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY25 Enacted | $5.91M |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY26 Disc. Request | $1.85M |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY26 Total | $1.85M |
Exhibit P-1R
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY24 Actuals | $3.12M |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY25 Enacted | $3.48M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $30.3M | $7.75M | $5.91M | $1.85M | $1.85M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →