Printed from https://fiscalreceipts.com/program/8081/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Training Support Equipment
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $2.08M |
| FY25 | $5.34M |
| FY26 | $3.48M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $3.20M | $1.28M | $2.08M | ||
| Enacted | – | $1.28M | $2.08M | $5.34M | |
| Request | – | – | $2.08M | $5.34M | $3.48M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $2.08M for FY2024; the PB2026 book reported $2.08M as actual total obligation authority — $1.00K below the request. 2.1 − 2.1 = -0.0 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Training Support Equipment
Commander, Naval Education and Training Command stated Battle Stations-21 (BST-21) is a mandatory graduation requirement. Additionally, BST-21 is a Fleet requirement for Accessions Level Training (Block 0) of the Ready Relevant Learning (RRL) initiative. BST-21 is a facility that represents a 210-foot-long Arleigh Burke class destroyer. It is the culminating training event for Recruit Training Command recruits to participate in a 12-hour simulation of four (4) General Quarters (GQ) scenarios and thirteen (13) shipboard scenarios that include engineering, lookout, and mass casualty drills. [P40A / BST-21 AUDIOVISUAL LIGHTING SYSTEMS]: Funding provided for updates to Audiovisual Lighting Systems to train recruits. [P40A / BST-21 SUPPORT SYSTEM]: Funding also provides for upgrades to operating equipment, software modifications, and UPS subsystem; ocean fill valve, pit sump pumps Variable Frequency Drive (VFD) controllers, blocking valve (natural gas) and power panel, pier stores, and tour brief station. [P40A / BST-21 INFORMATION ASSURANCE SOFTWARE MODIFICATION]: Funding provides for BST-21 Information Assurance Software. Software operating system technical refreshes are required every three to five years to maintain DOD Cybersecurity Security Controls Certification. [P40A / BST-21 SCENIC AND PROPS]: The Scenic and Props requirement provides for the life cycle sustainment plan divided into six separate subcategories: pier front, pier stores, ship exterior, 01 level, main deck, and 2nd deck with over 100 hardware items varying in quantities from 1 to 176 to a generic title of "lot". [P40A / BST-21 TRAINING MANAGEMENT SYSYTEM (TMS)]: Funds provided support for BST-21 systems tech refresh for training management systems, as well as software modifications. [P40A / BST-21 SPECIAL EFFECTS]: Funding decreased due to reduced requirements for special effects. [P40A / BST-21 OVERALL SUPERVISORY SYSTEM]: Funding provides refreshes to Overall Supervisory System (OSS) subsystem.
Justification
Justification — Training Support Equipment
FY26 decreased by $1.861M due to reduced funding required to support tech refreshes to scenic and props as well as special effects. Funding also provides for upgrades to operating equipment, software modifications, and UPS subsystem; provides refreshes to Overall Supervisory System (OSS) subsystem, ocean fill valve, pit sump pumps Variable Frequency Drive (VFD) controllers, blocking valve (natural gas) and power panel, pier stores, and tour brief station. Funding also supports tech refresh for training management systems, as well as software modifications.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Navy | N | FY24 Actuals | $2.08M |
| Other Procurement, Navy | N | FY25 Enacted | $5.34M |
| Other Procurement, Navy | N | FY26 Disc. Request | $3.48M |
| Other Procurement, Navy | N | FY26 Total | $3.48M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $8.51M | $2.08M | $5.34M | $3.48M | $3.48M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Training Support Equipment. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O756
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O732
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O770
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
OPN BA1 Book · www.secnav.navy.mil