Printed from https://fiscalreceipts.com/program/8081/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Training Support Equipment
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $2.08M
- FY26
- $3.48M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $3.20M | $1.28M | $2.08M | ||
| Enacted | – | $1.28M | $2.08M | $5.34M | |
| Request | – | – | $2.08M | $5.34M | $3.48M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $2.08M for FY2024; the PB2026 book reports $2.08M actually spent — $1.00K below the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Training Support Equipment
Commander, Naval Education and Training Command stated Battle Stations-21 (BST-21) is a mandatory graduation requirement. Additionally, BST-21 is a Fleet requirement for Accessions Level Training (Block 0) of the Ready Relevant Learning (RRL) initiative. BST-21 is a facility that represents a 210-foot-long Arleigh Burke class destroyer. It is the culminating training event for Recruit Training Command recruits to participate in a 12-hour simulation of four (4) General Quarters (GQ) scenarios and thirteen (13) shipboard scenarios that include engineering, lookout, and mass casualty drills. [P40A / BST-21 AUDIOVISUAL LIGHTING SYSTEMS]: Funding provided for updates to Audiovisual Lighting Systems to train recruits. [P40A / BST-21 SUPPORT SYSTEM]: Funding also provides for upgrades to operating equipment, software modifications, and UPS subsystem; ocean fill valve, pit sump pumps Variable Frequency Drive (VFD) controllers, blocking valve (natural gas) and power panel, pier stores, and tour brief station. [P40A / BST-21 INFORMATION ASSURANCE SOFTWARE MODIFICATION]: Funding provides for BST-21 Information Assurance Software. Software operating system technical refreshes are required every three to five years to maintain DOD Cybersecurity Security Controls Certification. [P40A / BST-21 SCENIC AND PROPS]: The Scenic and Props requirement provides for the life cycle sustainment plan divided into six separate subcategories: pier front, pier stores, ship exterior, 01 level, main deck, and 2nd deck with over 100 hardware items varying in quantities from 1 to 176 to a generic title of "lot". [P40A / BST-21 TRAINING MANAGEMENT SYSYTEM (TMS)]: Funds provided support for BST-21 systems tech refresh for training management systems, as well as software modifications. [P40A / BST-21 SPECIAL EFFECTS]: Funding decreased due to reduced requirements for special effects. [P40A / BST-21 OVERALL SUPERVISORY SYSTEM]: Funding provides refreshes to Overall Supervisory System (OSS) subsystem.
Justification
Justification — Training Support Equipment
FY26 decreased by $1.861M due to reduced funding required to support tech refreshes to scenic and props as well as special effects. Funding also provides for upgrades to operating equipment, software modifications, and UPS subsystem; provides refreshes to Overall Supervisory System (OSS) subsystem, ocean fill valve, pit sump pumps Variable Frequency Drive (VFD) controllers, blocking valve (natural gas) and power panel, pier stores, and tour brief station. Funding also supports tech refresh for training management systems, as well as software modifications.
Budget Line Items(workbook-cited)
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Navy | N | FY24 Actuals | $2.08M |
| Other Procurement, Navy | N | FY25 Enacted | $5.34M |
| Other Procurement, Navy | N | FY26 Disc. Request | $3.48M |
| Other Procurement, Navy | N | FY26 Total | $3.48M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $8.51M | $2.08M | $5.34M | $3.48M | $3.48M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →