Printed from https://fiscalreceipts.com/program/7066/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
First Destination Transportation
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $6.32M |
| FY25 | $5.86M |
| FY26 | $6.20M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $5.38M | $6.25M | $6.32M | ||
| Enacted | – | $6.25M | $6.98M | $5.86M | |
| Request | – | – | $6.98M | $5.86M | $6.20M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $6.98M for FY2024; the PB2026 book reported $6.32M as actual total obligation authority — $655.0K below the request. 6.3 − 7.0 = -0.7 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — First Destination Transportation
First Destination Transportation (FDT). FDT delivers material from a procurement source to the first point of use or storage which may be in the Continental United States or overseas. The procurement source may be a supplier outside of the Department of Defense (DoD) supply system or a DoD activity which fabricates new material. FDT also includes transportation from point of origin to point of use or storage when Navy-owned material or equipment is provided to a contractor incident to a Research and Development project or a system/equipment acquisition or modification.
Justification
Justification — First Destination Transportation
The FY 2026 request was reduced by $0.003 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative." FY 2026 funding required for transportation costs for shipments of OPN-procured equipment and material to the first point of use or storage, or as Government Furnished Equipment/Government Furnished Material (GFE/GFM) provided to a contractor incidental to an OPN-funded system/equipment acquisition or modification. The funding increase from FY 2025 to FY 2026 is a result of increased transportation costs associated with the trucking industry, as well as a shortage of truck operators.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Navy | N | FY24 Actuals | $6.32M |
| Other Procurement, Navy | N | FY25 Enacted | $5.86M |
| Other Procurement, Navy | N | FY26 Disc. Request | $6.20M |
| Other Procurement, Navy | N | FY26 Total | $6.20M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $76.6M | $6.32M | $5.86M | $6.20M | $6.20M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
4 mentions from the Senate LDA disclosure database.
Support Reinstatement of NLRB Member Gwynne Wilcox (No Bill Number) Support Richard Trumka Protecting the Right to…
S. 2651, the SITE Act; S. 1456, the SPUR Act; S. 1399, the Building American Energy Security Act; S. 1521, Community…
S. 4753 - Energy Permitting Reform Act of 2024; S. 2651, the SITE Act; S. 1456, the SPUR Act; S. 1399, the Building…
S.4753 - Energy Permitting Reform Act of 2024; S. 2651, the SITE Act; S. 1456, the SPUR Act; S. 1399, the Building…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not First Destination Transportation. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O754
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O730
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O768
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
OPN BA1 Book · www.secnav.navy.mil