NavyProcurementReconciledBLI7000
What it is
Spares and Repair Parts (7000) is a Navy procurement line funded in the Procurement, Marine Corps account.
What changed
+$12.1M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$42.7MP-1 TOA · PB2026
FY25 Enacted
$28.7MP-1 TOA · PB2026
FY26 Request
$40.8MP-1 TOA · PB2026
FY25→26 Change
+$12.1MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $42.7MFY25: $28.7MFY26: $40.8MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$42.7M
FY25$28.7M
FY26$40.8M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$39.3M$34.7M$42.7M
Enacted–$34.8M$35.7M$28.7M
Request––$35.7M$28.7M$40.8M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $35.7M for FY2024; the PB2026 book reported $42.7M as actual total obligation authority — $7.00M above the request. 42.7 − 35.7 = 7.0 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Spares and Repair Parts

Spares - Funds are required to reimburse the Navy Working Capital Fund for both repairable and consumable components at the time the initial spare parts package is released with the principal end item (PEI) to the Fleet Marine Force. This concept complies with the Navy Working Capital Fund funding of Initial Spares with reimbursement from the Procurement Account. Funds also provide for direct vendor support of the PEI delivery to the Fleet Marine Force.

Justification

Justification — Spares and Repair Parts

FY 2026 Base Appropriation Request: Amphibious Combat Vehicle Family of Vehicles (ACV FOV) BLI 2025: $21.436M will provide for initial spares for communication suites, outer CV boots, electric starters, inner CV boots, shock absorbers, strut assemblies, wheel end half shafts, limit switches, pressure sensors, half-shaft gaskets, and CTIS manifolds. Initial spares for ACV FOV are procured commensurate with the end items they support based on lead time for procurement. The increase of $0.290M in initial spares of between FY 2025 and FY 2026 is due to normal inflation. AN/TPS-80 Ground Air Task Oriented Radar (G/ATOR) BLI 4655: $19.392M will produce spares necessary to support fifty-four (54) G/ATOR systems via the decentralized distribution of initial spares from LOGCOM to the Repair Inventory Points at each Marine Expeditionary Force. A spares funding increase of $11.789M from FY 2025 to FY 2026 is necessary to ensure adequate sparing to support delivery of nine (9) additional Expeditionary Airfield Surveillance Radar (EASR) systems so that the Fleet Marine Forces will have the necessary repair parts to operate and maintain all fielded G/ATOR Radar Systems and thus avoid placing the program at significant risk of not meeting its important Key Performance Parameter (KPP) 8 of Sustainment.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Procurement, Marine CorpsNFY24 Actuals$42.7M
Procurement, Marine CorpsNFY25 Enacted$28.7M
Procurement, Marine CorpsNFY26 Disc. Request$40.8M
Procurement, Marine CorpsNFY26 Total$40.8M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$42.7M$28.7M$40.8M$40.8M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

2 mentions from the Senate LDA disclosure database.

FEDEX CORPORATIONRepair|Parts2026matched 2+ title words

Legislative monitoring of consumer privacy issues, vehicle data issues, and AI H.R.1566 - REPAIR Act H.R.1664/S.1492…

FEDEX CORPORATIONRepair|Parts2026matched 2+ title words

Legislative monitoring of consumer privacy issues, vehicle data issues, and AI H.R.1566 - REPAIR Act H.R.1664/S.1492…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Spares and Repair Parts. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification