Utility Helicopter Mods
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $56.4M |
| FY25 | $39.6M |
| FY26 | $33.7M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $25.3M | $39.3M | $56.4M | ||
| Enacted | – | $39.3M | $35.9M | $39.6M | |
| Request | – | – | $35.9M | $34.6M | $33.7M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $35.9M for FY2024; the PB2026 book reported $56.4M as actual total obligation authority — $20.5M above the request. 56.4 − 35.9 = 20.5 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Utility Helicopter Mods
Utility Helicopter Mods include modifications to the UH-60 Black Hawk and the UH-72 Lakota helicopters. The UH-60 Black Hawk helicopter is the Army's utility helicopter for the near and midterm force. It is a twin engine, single rotor, four bladed utility helicopters used for air assault, general support, command & control, and aero-medical evacuations (MEDEVAC). The UH-60 is joint force capable, providing 24 hour/day support including operations at night and in adverse weather conditions. The UH-60 is designed to carry a crew of four plus eleven combat equipped troops or an external load up to 9,000 pounds. The UH-60 Black Hawk was fielded in 1978 as a replacement for the UH-1. From 1978 to 1988, UH-60As were produced. In 1989 production of UH-60Ls with improved engines and drive train began. In 2007, full rate production of UH-60Ms began which provided a digital cockpit, digital Flight Management System (FMS), improved engine, and wide-cord main rotor blades. The UH-72 Lakota helicopter provides general aviation support for aviation units in the active and reserve components.
Justification
Justification — Utility Helicopter Mods
FY 2026 Base dollars in the amount of $33.659M, will procure and install Survivability Upgrade, Upturned Exhaust Systems (UES), along with installing Mission Equipment, 60kVA Generators, for the UH-60M Fleet. The Upturned Exhaust System (UES) enhancements provide Survivability, Safety, Reliability, Maintainability, and reduced Weight improvement over the legacy UES design. It also provides the following benefits: Substantial reductions in IR signature to counter emerging threats; Common hardware across all H-60 platforms; and 100% organic reparability. The UH-60L/M/V 60kVA Generator provides additional power for future systems such as Common Infrared Countermeasure (CIRCM), Degraded Visual Environment (DVE), and the Future Waveform Radio. FY 2025 to FY 2026 funding decrease of Utility Helicopter Mods is due to the procurement of less kits.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Army | A | FY24 Actuals | $56.4M |
| Aircraft Procurement, Army | A | FY25 Enacted | $39.6M |
| Aircraft Procurement, Army | A | FY26 Disc. Request | $33.7M |
| Aircraft Procurement, Army | A | FY26 Total | $33.7M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $1.81B | $56.4M | $39.6M | $33.7M | $33.7M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
4 mentions from the Senate LDA disclosure database.
Issues related to energy efficiency in commercial and residential buildings, and advanced building controls Issues…
Issues related to energy efficiency in commercial and residential buildings, and advanced building controls Issues…
Issues related to energy efficiency in commercial and residential buildings, and advanced building controls Issues…
Issues related to energy efficiency in commercial and residential buildings, and advanced building controls Issues…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Utility Helicopter Mods. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O29
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O36
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O29
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
Aircraft Procurement Army · www.asafm.army.mil
PDF page 119