Items Less Than $5 Million (6670) is a Navy procurement line funded in the Procurement, Marine Corps account.
What changed
+$9.41M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$47.2MP-1 TOA · PB2026
FY25 Enacted
$26.5MP-1 TOA · PB2026
FY26 Request
$35.9MP-1 TOA · PB2026
FY25→26 Change
+$9.41MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $47.2MFY25: $26.5MFY26: $35.9MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$47.2M
FY25$26.5M
FY26$35.9M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$4.40M$26.4M$47.2M
Enacted–$26.4M$27.7M$26.5M
Request––$27.7M$26.5M$35.9M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $27.7M for FY2024; the PB2026 book reported $47.2M as actual total obligation authority — $19.5M above the request. 47.2 − 27.7 = 19.5 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Items Less Than $5 Million

This budget line item includes various procurements such as engineering efforts, engineering change proposals, modifications, and other related items less than $5 million each. Vital to maintaining readiness of fleet assets, the Corrosion Prevention and Control (CPAC) Program provides a comprehensive approach to extend the useful life of Marine Corps tactical ground and ground support equipment. An enabler to Force Modernization readiness, the CPAC Program Office is responsible for the governance, oversight, and management of both preventive and corrective corrosion control on such systems as the Joint Light Tactical Vehicle (JLTV), Ultra-Light Tactical Vehicle (ULTV), Amphibious Combat Vehicle (ACV), Medium Tactical Vehicle Replacement (MTVR), Logistics Vehicle System Replacement (LVSR), which encompasses Program Management, Acquisition Engineering, Material Development, Corrosion Service Teams, and Corrosion Repair Facility activities. The consolidated CPAC Program provides a total lifecycle solution focused on total ownership cost reduction and improved readiness in saltwater and corrosive environments through the application of corrosion prevention compounds and materials to mitigate the effects of corrosion in order to enhance and enable the Marine Corps' ability to operate in the Indo-Pacific in accordance with Expeditionary Advanced Base Operations (EABO) and Littoral Operations in Contested Environments (LOCE) doctrines. Marine Corps Family of Containers (MCFC) provides Marine Corps Operating Forces with a fully intermodal transport capability emphasizing dimensional standardization and International Organization for Standardization compatibility. This family of containers includes the Palletized Container (PALCON), Quadruple Container (QUADCON), Quadruple Container with Roll-up door (QUADCON RUD), and Joint Modular Intermodal Container (JMIC). PALCONs and JMICs replace prefabricated wooden mount boxes and flat box pallets. With a 3:1 collapsible ratio, the Joint Modular Intermodal Container (JMIC) provides efficient movement of supplies and unit equipment throughout the transportation and distribution systems. All containers support the storage and movement of organizational property and consumable supplies; provide field, garrison, and shipboard warehousing; and facilitate ship-to-shore movement. Family of Shelters and Shelters Equipment (FSSE) provides expeditionary soft wall shelters, rigid wall shelters, and camouflage netting to protect personnel from environmental effects and conceals personnel and equipment from detection. The various expeditionary shelters, heater, and lighting system serve as berthing quarters, command posts, and ground equipment maintenance shops in support of Marines operating in expeditionary environments. The next generation Ultra Lightweight Camouflage Netting System (ULCANS) directly supports Force Design 2030 by providing enhanced spectrum compliance in concealing high value targets through signature management and reducing detection and observation. Family of Expeditionary Water Systems (FEWS) is key in providing for the survival of personnel in forward areas of operations such as austere basing in the EABO, LOCE, and Indo-Pacific in support of Force Modernization, the FEWS is a family of systems line that contains purification, storage, distribution, hygiene, and test systems. This capability is necessary to provide safe and potable water to Marines in expeditionary environments. The family contains individual Table of Allowance Material Control Numbers which supports Fleet Marine Force (FMF) Marine Air-Ground Task Force (MAGTF) operations and Expeditionary Advanced Base Operations (EABO) by providing all aspects of land-based water support to include test analysis, purification, reuse, storage, transfer, dispensing, and field hygiene support. The line contains items such as the Tactical Water Purification System (TWPS), Lightweight Water Purification System (LWPS), Squad Water Purification System, Platoon Water Purification System (PWPS), Individual Water Purification System (IWPS), Block II, Forward Area Water Point Supply System (FAWPSS) Pump Unit Set, Containerized Batch Laundry, Shower Systems, as well as all the various water supply support and analysis components and equipment including Six Container (SIXCON) Tank Modules, Nozzles, Interconnection Sets, Water Packaging Components, 3k/5k/10k/20k Tanks, Hypo chlorination Units, and Water Quality Analysis Sets. Engineer Modification Kits (EMK) and Tool Kits provide critical improvements to various pieces of equipment by enhancing their current capabilities, expanding protection, and enabling our ability to operate in the Expeditionary Advanced Base Operations (EABO) and austere base establishment in the Littoral Operations in Contested Environments (LOCE) and Indo-Pacific. An enabler to operations in forward basing areas such as EABO, LOCE, and Indo-Pacific, EMK and Tool Kits provide protection from direct and indirect fire with specific tool kits, including the specific chest or case to store and transport the tools, to perform specific missions in support of Force Modernization. Supports equipment armor installations, upgrades, and safety concerns to prevent deterioration in Fleet readiness for Engineer Systems inventory consisting of over 47,000 end items associated to 120 TAMCNs (Table of Authorized Material Control Numbers). Supports modifications and upgrades to fielded legacy equipment as well as newly fielded systems and provides quick response capability for meeting Fleet Marine Force sustainment for safety engineering, readiness, Quality Deficiency Report analysis, and legacy system modifications. Ballistic Protection Systems (BPS) provides advanced protection at the lightest weight available. It provides critical ballistic protective systems that save lives, reduce the severity of combat injuries, and increase combat effectiveness by keeping more Marines in the fight. This effort supports the procurement of Non-Destructive Test Equipment - Armor Inspection Systems (AIS) and annual support services. AIS is a turnkey system for the inspection of ceramic ballistic plates which includes detecting cracks and defects as well as delamination.

Justification

Justification — Items Less Than $5 Million

FY 2026 Funding Request: $35.920M Corrosion Prevention and Control (CPAC) $1.006M: The consolidated CPAC program currently monitors the corrosion condition of 95,558 tactical ground and support equipment assets worldwide. FY 2026 funding provides program support and continues to procure the replacement of Personal Property/Collateral Equipment (PP/CE), and Real Property Installed Equipment (RPIE) such as, but not limited to, compressors, blast booths, sanding/painting related equipment, and hazardous waste reduction equipment to support corrosion prevention and repair operations throughout the Fleet Marine Force (FMF) and supporting establishments. Funding increase from FY 2025 to FY 2026 aligns with increased requirements for replacement of CPAC Collateral Equipment requirements throughout the Fleet Marine Force (FMF). Marine Corps Family of Containers (MCFC) $1.453M: FY 2026 funding procures Quadruple Containers (QuadCons) to meet Approved Acquisition Objective (AAO). QuadCons provides global shipping and storage capability for units in the field. Family of Shelters and Shelters Equipment (FSSE) $22.330M: FY 2026 funding procures the next generation Ultra-Lightweight Camouflage Net System (ULCANS Increment 1), which provides a new capability to the battlefield with signature suppression throughout the entire infrared light spectrum in addition to RADAR protection for maximum concealment against adversary sensors. The increase from FY 2025 to FY 2026 reflects the increased procurement of Ultra-Lightweight Camouflage Net System (ULCANS). Family of Expeditionary Water Systems (FEWS) $8.087M: FY 2026 continues the procurement of modification kits for the Lightweight Water Purification System (LWPS). The increase in FY 2026 supports continued procurement of LWPS modification kits. Engineer Modification Kits (EMK) $3.044M: FY 2026 continues to procure equipment armor installations, upgrades, and safety concerns to prevent deterioration in Fleet readiness for Engineer Systems inventory consisting of over 47,000 end items associated to 120 Table of Authorized Material Control Numbers (TAMCNs). Supports modifications and upgrades to fielded legacy equipment as well as newly fielded systems and provides quick response capability for meeting Fleet Marine Force sustainment for safety engineering, readiness, Quality Deficiency Report analysis, and legacy system modifications. The increase in FY 2026 is due to a larger amount of Engineer Change Proposals on various legacy Combat Engineering Equipment.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Procurement, Marine CorpsNFY24 Actuals$47.2M
Procurement, Marine CorpsNFY25 Enacted$26.5M
Procurement, Marine CorpsNFY26 Disc. Request$35.9M
Procurement, Marine CorpsNFY26 Total$35.9M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$105.3M$47.2M$26.5M$35.9M$35.9M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Items Less Than $5 Million. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.