Printed from https://fiscalreceipts.com/program/6652GM1900/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
VEHICLE PROTECTION SYSTEMS (VPS)
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
Insufficient trajectory data for sparkline (only FY26 available).
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $75.3M | – | – | ||
| Enacted | – | $0 | – | – | |
| Request | – | – | $0 | – | $107.8M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — VEHICLE PROTECTION SYSTEMS (VPS)
BLI 6652GM1900 / VEHICLE PROTECTION SYSTEMS (VPS) is a new start in FY 2026. SSN GM1911 / VPS MODULAR ACTIVE PROTECTION SYSTEMS W/LASER is a new start within the VEHICLE PROTECTION SYSTEMS (VPS) program in FY 2026 SSN GM1912 / VPS SIGNATURE MANAGEMENT is a new start within the VEHICLE PROTECTION SYSTEMS (VPS) program in FY 2026 SSN GM1914 / VPS TOP ATTACK PROTECTION is a new start within the VEHICLE PROTECTION SYSTEMS (VPS) program in FY 2026 The Vehicle Protection Suite (VPS) will evaluate, mature, and integrate onto multiple combat and tactical vehicles, combinations of active, reactive and passive protection capabilities. These capabilities will leverage both Horizontal Technology Integration (HTI) principles and the Modular Open System Architecture with the Army's Vehicle Protection System Base Kit (VBK) to develop tailored vehicle Survivability Sets specific to platforms that will mitigate existing protection gaps, allow for future technology insertion to mitigate and defeat evolving threats, and minimize the impact to the current capabilities hosted on Army ground combat and tactical vehicles. The protection capabilities will leverage technologies across a spectrum of survivability mechanisms including detection avoidance, threat detection, threat intercept and threat mitigation. (GM1911) - VPS Base Kit with Laser Warning Receiver The Laser Warning Receiver (LWR) will detect enemy military laser aided threats and provide rapid warning of threat type and signal direction to the Modular Active Protection Controller (MAC) via the Modular Active Protection Framework (MAF). It will be able to detect the broad array of laser aided threats that ground combat vehicles will face operationally: Laser Range Finders (LRF), Laser Target Designators (LTD), and Laser Beam Rider Air to Ground Munitions (ATGMs). The system will alert the crew to which of the three categories of threats are targeting the system and allow for the crew to respond based on that threat. Threat timelines are critical to the response of the vehicle crew and the ability to counter the threat. The Laser Warning Receiver will provide early warning to laser aided threat elements. The VPS Base Kit with Laser Warning Receiver is currently planned to be implemented as an Engineering Change Proposal to multiple ground combat vehicle platforms. (GM1912) - VPS Signature Management Signature Management reduces the infrared signature of ground combat vehicles. This capability will reduce the probability of enemy detection from classified ranges and wave bands. Signature Management is designed to be integrated with no changes to the combat vehicles' baseline paint. This program is intended to be used on all combat vehicles, with future expansion to other U.S. Army vehicle systems. Signature Management is the Vehicle Protection System baseline layer for the signature management architecture. Future Vehicle Protection technologies may be layered in coordination with this program. Combat vehicles face numerous detection systems that operate in the infrared wavelengths. These detection systems can be vehicle mounted, carried by individuals or satellite mounted. The Signature Management Paint program focuses on vehicle mounted detection systems that operate in specific wavelengths. Future capability may be added to the Signature Management program to address other wavelength gaps or managed through other future camouflage and concealment programs. The Signature Management program is currently planned to be implemented as a production cut-in and/or retrofit to the enduring fleet onto multiple ground combat vehicle platforms. (GM1914) - VPS Top Attack Protection Top Attack Protection (TAP) is a passive add-on armor to the base vehicle configuration. It is strategically placed over crew compartments and hatches working in tandem with the base vehicle armor to mitigate damage from overhead threats. It is most effective against Explosively Formed Projectiles and Shaped Charge Jets. Top Attack Protection (TAP) is intended to be installed on all combat vehicles with future expansion to other US Army vehicle systems. The Top Attack Protection (TAP) quantity per platform varies based on platform base armor and crew compartment locations.
Justification
Justification — VEHICLE PROTECTION SYSTEMS (VPS)
FY 2026 Base Procurement dollars in the amount of $107.833 million supports the following: (GM1911) VPS Base Kits (VBK) with Laser Warning Receiver (LWR). Funding supports Laser Warning Receiver and Vehicle Base Kit receipt, storage, integration, A kit procurement and installation. The Laser Warning Receiver is a platform integrated solution that provides ground combat systems early warning from enemy threats based on laser detection sensors. (GM1912) VPS Signature Management. Funds are required to procure and apply Signature Management Paint onto 389 vehicles across multiple ground combat platforms. Signature Management Paint reduces the probability of thermal detection and is part of the Camouflage, Concealment, Deception, and Obscuration layered survivability approach for ground combat vehicles. (GM1914) VPS Top Attack Protection. Funds are required to procure 4 Armored Brigade Combat Team sets of Top Attack Protection capability. Top Attack Protection is a passive add-on armor that is placed over crew compartments and hatches to mitigate damage from overhead threats. This is a new start in FY 2026. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY26 Disc. Request | $107.8M |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY26 Total | $107.8M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY26 Base | FY26 Request |
|---|---|---|---|
| Program Element | $75.3M | $107.8M | $107.8M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
Showing 25 of 44 from the Senate LDA disclosure database.
National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…
National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…
H.R.2424 - Modern, Clean, and Safe Trucks Act of 2025 H.R.2391 - Strengthening the Supply Chain Through Truck Drivers…
Legislative monitoring of Open Skies Agreements Legislative monitoring of general trade issues including customs…
H.R.9495/S.____ Department of Defense Appropriations Bill, 2027 - Title IV, all provisions related to small aircraft…
H.R.____/S.____ Department of Defense Appropriations Bill, 2027 - Title IV, all provisions related to small aircraft…
Domestic Manufacturing Conversion grants. Autonomous vehicle manufacturing labor standards. Auto tariffs and reshoring…
Domestic Manufacturing Conversion grants. Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Corporate…
National Defense Authorization Act for Fiscal Year 2026 (HR 3838/S 2296); provisions regarding R&D - Navy, Air Force…
Department of Defense Appropriations Act, 2026 (HR 4016/S 2572); provisions regarding R&D - Navy, Air Force, Space…
Department of Defense Appropriations Act, 2026 (HR 4016/ S XXXX); provisions regarding R&D - Army, Navy/USMC, Air…
H.R.2424 - Modern, Clean, and Safe Trucks Act of 2025. H.R.2391 - Strengthening the Supply Chain Through Truck Drivers…
H.R.2424 - Modern, Clean, and Safe Trucks Act of 2025 H.R.2391 - Strengthening the Supply Chain Through Truck Drivers…
H.R.2424 - Modern, Clean, and Safe Trucks Act of 2025. H.R.2391 - Strengthening the Supply Chain Through Truck Drivers…
H.R.2424 - Modern, Clean, and Safe Trucks Act of 2025. H.R.2391 - Strengthening the Supply Chain Through Truck Drivers…
S. 996, Preserving Choice in Vehicle Purchases Act of 2025; H.R. 1346, S. 593, Nationwide Consumer and Fuel Retailer…
S. 996, Preserving Choice in Vehicle Purchases Act of 2025; SA #3397 to S. 2296, the National Defense Authorization FY…
S. 996, Preserving Choice in Vehicle Purchases Act of 2025; H.R. 1346, S. 593, Nationwide Consumer and Fuel Retailer…
Issues related to electric vehicles and fuel efficiency standards. H.J.Res.89 - Providing congressional disapproval…
Electric vehicle consumer and manufacturing tax credits implementation in the Inflation Reduction Act: 45W. Domestic…
Electric vehicle consumer and manufacturing tax credits implementation in the Inflation Reduction Act: 45W. Domestic…
Electric vehicle consumer and manufacturing tax credits implementation in the Inflation Reduction Act: 45W. Domestic…
Inflation Reduction Act (H.R.5376) implementation. Electric vehicle infrastructure investments. Infrastructure…
Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…
Renewable Fuel Standard, H.R.1 - One Big Beautiful Bill Act, issues related to sustainable aviation fuel, H.J.Res. 88…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not VEHICLE PROTECTION SYSTEMS (VPS). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · W101
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O99
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
Procurement of Weapons and Tracked Combat Vehicles · www.asafm.army.mil
PDF page 137