Skip to content
Fiscal Receipts

Mortar Systems

ArmyProcurementPartial ReconciliationBLI6580G02200
What it is
Mortar Systems (6580G02200) is an Army procurement line funded in the Procurement of Weapons and Tracked Combat Vehicles, Army account.
What changed
-$2.55M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$8.01MP-1 TOA · PB2026
FY25 Enacted
$8.35MP-1 TOA · PB2026
FY26 Request
$5.81MP-1 TOA · PB2026
FY25→26 Change
-$2.55MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $8.01MFY25: $8.35MFY26: $5.81MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$8.01M
FY25$8.35M
FY26$5.81M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$33.2M$21.9M$8.01M
Enacted–$8.52M$8.01M$8.35M
Request––$8.01M$8.35M$5.81M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Mortar Systems

Overseas Operations Costs (OOC) funds this requirement in FY 2026. Mortar Systems includes the production of 60mm Lightweight M224A1, 81mm Lightweight M252A1, 120mm M120A1/M121 mortar weapon systems, and future variants/modernized systems; including subsystems components M326 Mortar Stowage Kit (MSK), Mortar Stowage System (MSS), M1101 and M1102 trailers and associated supporting subsystems, Basic Issue Items (BII), Additional Authorized List (AAL) items and tool kits. These mortar weapon systems and associated equipment and subsystem components support the mounted and dismounted vehicle platforms in the Armor Brigade Combat Teams (ABCTs), Stryker Brigade Combat Teams (SBCTs), and Infantry Brigade Combat Teams (IBCTs). The Dismounted 120mm (M120A1) system's Mortar Stowage Kit (MSK) and Mortar Stowage System (MSS) subsystems assembly enables rapid emplacement and displacement of the M120A1 from the M1101 and M1102 Trailers or IBCT vehicle platforms. The 60mm, 81mm and 120mm mortar weapon systems and components fulfill current and future Army Acquisition Objective (AAO) requirements, Operational Need Statement (ONS) requirements, increase of Army reorganization and Army stand up unit requirements, and address mortar system safety and obsolescence concerns. The M120A1 will also be mounted or integrated on the Army's current and future vehicle and trailer systems.

Justification

Justification — Mortar Systems

FY 2026 funding total includes $2.267 million for Base and $3.540 million for Overseas Operations Costs (OOC) for a total of three (3) each full systems. FY 2026 Base procurement dollars in the amount of $2.267 million will support the procurement of one (1) each M121 120mm mortar weapon system, required subsystem components, Modified Work Order (MWO) kits, Basic Issue Item (BII) kits, Engineering Change Proposals (ECPs), and updates required to the applicable Technical Data Packages (TDPs). Funding will also support efforts to address technical issues and obsolescence related to weapon system safety, special force requirements and modernized mounted and dismounted platforms in the Armor Brigade Combat Teams (ABCTs), as well as Armor Multi-Purpose Vehicle (AMPV) requirements. Funding is essential to fill shortages of 120mm mortar weapon systems resulting from Army ABCT reorganization from two Battalions per Brigade to three Battalions per Brigade as well as the increase in the Army Acquisition Objective (AAO) for new stand-up units. FY 2026 Overseas Operations Costs (OOC) in the amount of $3.540 million will support the procurement of two (2) each M121 120mm mortar weapon systems in support of Operation Atlantic Resolve (OAR). This is an increase of $0.031 million from the FY 2025 requested level. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L.110-181) this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY24 Actuals$8.01M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY25 Enacted$8.35M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY26 Disc. Request$5.81M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY26 Total$5.81M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$547.7M$8.01M$8.35M$2.27M$5.81M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Mortar Systems. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.