What it is
MLRS Mods (6552C67500) is an Army procurement line funded in the Missile Procurement, Army account.
What changed
+$57.6M FY25→26 P-1 TOA · PB2026
Who gets it
LOCKHEED MARTIN leads 2 contractor families sharing $2.17B in high-confidence matched awards.

Budget figures

FY24 Actuals
$168.2MP-1 TOA · PB2026
FY25 Enacted
$185.8MP-1 TOA · PB2026
FY26 Request
$243.5MP-1 TOA · PB2026
FY25→26 Change
+$57.6MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $168.2MFY25: $185.8MFY26: $243.5MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$168.2M
FY25$185.8M
FY26$243.5M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$273.9M$218.4M$168.2M
Enacted–$218.4M$168.2M$185.8M
Request––$168.2M$185.8M$243.5M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — MLRS Mods

The M270A2 Multiple Launch Rocket System (MLRS) launcher is a full-spectrum, combat-proven, all-weather, 24/7 lethal and responsive, precision strike weapon system. MLRS launchers support the Army's Long Range Precision Fires modernization effort. MLRS provides critical missile precision strike, operational shaping fires, counterfire, and close support destructive and suppressive fires. MLRS is a tracked, indirect fire, rocket/missile launcher capable of firing two pods of precision rockets/missiles from the current Multiple Launch Rocket System (MLRS) Family of Munitions (MFOM) including the Guided Multiple Launch Rocket System (GMLRS) and the Army Tactical Missile System (ATACMS), the Precision Strike Missile (PrSM), and future MFOM to include the Extended Range GMLRS (ER-GMLRS). MLRS launchers support Integrated Fires and Multi-Domain Operations. MLRS is part of the Army Transformation Initiative. In FY2017, the Army directed the program office to modernize 160 obsolete, unserviceable MLRS M270A0s into M270A2s in an effort called MLRS Fleet Expansion. In addition to MLRS Fleet Expansion, the Army decided to extend the operational life of the existing M270A1 fleet to FY2050 or beyond, which drives the requirement to upgrade 184 of the current fleet of M270A1 launchers to the M270A2 configuration. The end state is 344 MLRS launchers with Improved Armored Cabs (IAC), Bradley commonality improvements (Bradley Engineering Change Proposals (ECPs) 1, 2, and 3), and Common Fire Control System (CFCS). Upon integration of the IAC Modification Kit on a M270A1, the launcher permanently becomes an M270A2. MOD 2 (MLRS Fleet Upgrade). The MLRS selective upgrade effort inducts M270A1s launchers into the modification line at Red River Army Depot, Texas and upgrades them to M270A2s by adding the IAC Cab (Mod3); also procures the Common Fire Control System (CFCS) Launcher Adapter Group (LAG) kit. MOD 3 (Improved Armored Cab). The Improved Armored Cab (IAC) Modification Kit provides crew survivability against Improvised Explosive Devices (IEDs) and small arms fire greater than or equal to the M142 High Mobility Artillery Rocket System (M142 HIMARS) Increased Crew Protection Cab (ICP). Additionally, IAC standardizes crew drill requirements between M142 HIMARS and MLRS operators. Upon integration of the IAC Modification Kit on a M270A1, the launcher permanently becomes a M270A2. Red River Army Depot performs the integration of the IAC under a Public Private Partnership as part of the MLRS Fleet Upgrade (MOD 2) efforts. MOD 4 (MLRS MODS). MOD 4 began funding in FY2025 to provide budget transparency to the recurring obsolescence mitigation activities not related to MOD 2. It realigned three cost elements (Bradley obsolescence, fire control system obsolescence, and Government Test) characterized as non-recurring in MOD 2 to recurring in MOD 4 and added three cost elements. The Bradley chassis obsolescence mitigation cost element maintains commonality with the Bradley carrier. Fire control system cost element addresses parts obsolescence for continued production. This element includes CFCS obsolescence program referred to as Block III. Government testing verifies items such as production quality, APNT functionality, and chassis modification effectiveness. The other three cost elements are Logistics-related mods, Product Integration Support, and Software Integration Support. Logistics-related mods support critical logistics functions to update Interactive Electronic Technical Manuals, procure system-specific training devices required to support the MLRS Vehicle and Maintainer training, and support maintaining and preparation of launchers for fielding, overhaul, reset and test activities. Product integration support includes launcher stakeholder support such as Aviation and Missile Command safety support, Tank-Automotive and Armaments Command support, and field service representative support at Red River Army Depot for engines and transmissions. Software integration support includes engineering activities to sustain software to ensure it remains viable and updates training documentation The Army Acquisition Objective (AAO) is 347 MLRS launchers.

Justification

Justification — MLRS Mods

FY2026 procurement dollars in the amount of $243.470 million provides modifications which result in 23 M270A2 MLRS launchers. MOD 2. Upgrades 23 M270A1 launchers to M270A2. The MLRS Fleet Upgrade effort continues by upgrading the current fleet of M270A1 launchers to M270A2 launchers addressing Bradley commonality, fire control system (FCS) hardware obsolescence, CFCS Launcher Adapter Group (LAG) kits, and application of Improved Armored Cabs MOD Kits (MOD 3). Beginning in FY2025, adjustments were made to Fielding cost element to highlight the purchase of fielding spares to support future fieldings. All other fielding costs are labeled in the logistics-related Mods line of MOD 4. To provide budget transparency, MOD 2 captures CFCS LAG kit purchases as a distinctive cost element under MOD 2 versus obsolescence mitigation measures associated with MOD 4. MOD 3. Procures 23 Improved Armored Cabs (IACs) supporting ongoing M270A2 launcher production, production line replenishment, and initial spares for provisioning. The IAC improves survivability of the crew. Application of MOD 2 and MOD 3 to an M270A1 results in a M270A2 Launcher. MOD 4. MLRS MODS funding includes, but is not limited to, the following: updating the Bradley carrier drawing packages and Technical Data Packages through the prime contractor and the government product office; updating the Interactive Electronic Technical Manuals for Soldiers to perform operator maintenance. Systems engineering efforts will address obsolescence issues and apply necessary modifications to the major MLRS components of the Carrier. Common Fire Control System (CFCS) obsolescence mitigation replaces obsolete components as well as modernizes the board layout from the antiquated through-hole design to surface mount technology. This enables continued production of CFCS at a greater capacity and lower cost. Product Integration supports launchers that are transitioning from production and/or overhaul back to units, reset activities and maintaining launchers in the test fleet to support critical test activities. Software integration supports modifications to the MLRS launcher to meet the current and evolving threat. FY2026 MLRS Mods funding increase of $57.631 million procures eight M270A2 launchers (MOD 2), initial spares, equipment for fielding, and initial spares for IAC (MOD 3). The Army intends to convert any price advantage created through contract negotiations, other service procurement, and international cooperative partnerships to continue the MLRS Fleet Upgrade (MOD 2) of MLRS launchers from M270A1 configuration to M270A2 configuration, and/or address obsolescence, modernization, cost reduction, and production initiatives. The Army will continue to incorporate modifications with the MLRS launcher to keep pace with the current and evolving threat. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Missile Procurement, ArmyAFY24 Actuals$168.2M
Missile Procurement, ArmyAFY25 Enacted$185.8M
Missile Procurement, ArmyAFY26 Disc. Request$243.5M
Missile Procurement, ArmyAFY26 Total$243.5M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$2.25B$168.2M$185.8M$243.5M$243.5M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the A appropriation, program element 6552C67500 (MLRS Mods), its 5 largest high-confidence awards, the 2 recipient families behind them, and the 4 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the A appropriation, program element 6552C67500 (MLRS Mods), its 5 largest high-confidence awards, the 2 recipient families behind them, and the 4 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSAProcurement appropriation6552C67500243.5M FY26W31P4Q19C0077LOCKHEED MARTIN CORPORATION1.11BW31P4Q23C0032LOCKHEED MARTIN CORPORATION778.6MW15QKN18C0073LOC PERFORMANCE PRODUCTS LLC290.9MW15QKN18C0073LOC PERFORMANCE PRODUCTS LLC2.96MW31P4Q19C0077LOCKHEED MARTIN CORPORATION30.5KLockheed Martin CorpLOC PERFORMANCE PRODUCTS …TX-33MI-06MI-07TX-32

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
TX-33$1.87B
MI-06$290.8M
MI-07$2.96M
TX-32$30.5K

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
LOC PERFORMANCE PRODUCTS LLCW15QKN18C0073high
LOCKHEED MARTIN CORPORATIONW31P4Q19C0077high
LOCKHEED MARTIN CORPORATIONW31P4Q23C0032high
LOCKHEED MARTIN CORPORATIONW31P4Q12C0048medium
LOCKHEED MARTIN CORPORATIONW31P4Q14C0066medium
LOCKHEED MARTIN CORPORATIONW31P4Q25C0007medium

Contractor concentration

HHI Indexⓘ
7674
Highly Concentrated
2023 Merger Guidelines bands
Top Contractor
LOCKHEED MARTIN
Contractor Families
2
Program Obligationsⓘ
$2.17B

High-confidence award links only, pooled across ingested years. The index uses positive obligations; program obligations are net of deobligations. The figures over every published link, including medium-confidence ones, are in the downloadable warehouse, not on this page — why.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not MLRS Mods. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.