Printed from https://fiscalreceipts.com/program/6545/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Ultra-Light Tactical Vehicle (ULTV)
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $13.3M |
| FY25 | $18.0M |
| FY26 | $7.84M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $15.4M | $18.0M | $13.3M | ||
| Enacted | – | $15.0M | $17.0M | $18.0M | |
| Request | – | – | $17.0M | $18.0M | $7.84M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $17.0M for FY2024; the PB2026 book reported $13.3M as actual total obligation authority — $3.71M below the request. 13.3 − 17.0 = -3.7 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Ultra-Light Tactical Vehicle (ULTV)
The Family of Ultra-Light Tactical Vehicles (FULTV), which consists of the Utility Task Vehicle (UTV) and its replacement the Ultra-Light Tactical Vehicle (ULTV), provides operational capabilities for infantry logistics, integrating systems, long-range surveillance, and reconnaissance missions in support of distributed heliborne operations. The lightweight vehicles provide units with increased logistics support while reducing the combat load burden on the individual Marine, as well as providing casualty evacuation for wounded Marines. The vehicles are transportable in the MV-22/CV-22 tilt rotary wing aircraft, CH-53E/CH-53K rotary wing aircraft, and all fixed wing aircrafts. The FULTV mitigates the infantry units, reconnaissance battalions, and wing support squadrons mobility capability gaps, with the ability to operate in remote regions where currently fielded ground mobility platforms may be unsuitable due to size, weight, and transportability concerns. The FULTV is a reliable, non-developmental vehicle that supports the Fleet Marine Forces by providing infantry and reconnaissance battalions with a reliable, easily maintained, vehicle that supports a range of military operations (ROMO) including distributed operations (DO), littoral operations in a contested environment (LOCE), expeditionary advanced based operations (EABO), and Humanitarian Assistance and Disaster Relief (HADR). The FULTV platforms host essential Force Design enabling capabilities. The ULTV also includes a ULTV-High-Power variant which provides exportable electrical power generation in support of the requirements for integrating systems. Efforts are underway to replace the UTV with the ULTV. The ULTV will leverage technology upgrades to improve operational capabilities. The desired outcomes from ULTV employment include, but are not limited to, a lighter, faster, more maneuverable, and more resilient force, with an increased ability to operate and be sustained in austere environments, reduced operational risk through a smaller logistics footprint, and reduced threat exposure and operational risk, and increased autonomy and tactical mobility, particularly at the company-level and below. The FULTV line item will also provide for any safety related or diminishing sources of supply configuration changes of the fielded UTVs. This hands-on method ensures proper in-service management and vehicle sustainment while allowing the program office to develop and implement improvements as needed to respond to evolving requirements of the Marine Corps that affect vehicle reliability, safety, availability, and readiness. The ULTVs began fielding in FY 2023. Safety and reliability modifications are planned throughout the life of the FULTV's to ensure maximum readiness as vehicles age.
Justification
Justification — Ultra-Light Tactical Vehicle (ULTV)
FY 2026 Base Appropriation Request: $7.836M The FY 2026 funding supports the procurement of 31 ULTV's with associated integration kits, new equipment training for both operator and maintainer, engineering change proposals (ECPs), program support, as well as the interim contractor support for supply chain management until provisioning is complete and the program transitions to organic supply support. The net decrease from FY 2025 to FY 2026 reflects less vehicles procured, along with modifications and support costs.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement, Marine Corps | N | FY24 Actuals | $13.3M |
| Procurement, Marine Corps | N | FY25 Enacted | $18.0M |
| Procurement, Marine Corps | N | FY26 Disc. Request | $7.84M |
| Procurement, Marine Corps | N | FY26 Total | $7.84M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $147.1M | $13.3M | $18.0M | $7.84M | $7.84M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
22 mentions from the Senate LDA disclosure database.
Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…
Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…
Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…
Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…
Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…
Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…
Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…
Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…
Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…
Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…
Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…
Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…
Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…
Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…
Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…
Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…
Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…
National Heritage Area Act, Inflation Reduction Act (H.R.5376), Advanced Technology Vehicles Manufacturing Loan…
Advanced Technology Vehicles Manufacturing Loan Program (ATVM), Domestic Manufacturing Conversion grants, Autonomous…
Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…
National Heritage Area Act, Inflation Reduction Act (H.R.5376), Advanced Technology Vehicles Manufacturing Loan…
National Heritage Area Act, Inflation Reduction Act (H.R.5376), Advanced Technology Vehicles Manufacturing Loan…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Ultra-Light Tactical Vehicle (ULTV). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O830
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O804
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O847
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.