EOD Systems
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $44.2M |
| FY25 | $30.2M |
| FY26 | $21.1M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $78.9M | $153.9M | $44.2M | ||
| Enacted | – | $153.9M | $41.2M | $30.2M | |
| Request | – | – | $41.2M | $30.2M | $21.1M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $41.2M for FY2024; the PB2026 book reported $44.2M as actual total obligation authority — $3.00M above the request. 44.2 − 41.2 = 3.0 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — EOD Systems
Family of EOD Equipment (FEOD) is comprised of over forty Table of Authorized Material Control Numbers providing the required tools and capabilities to detect, locate, access, identify, triage, diagnose, stabilize, render safe, neutralize, recover, exploit, and dispose of unexploded explosive ordnance, improvised explosive devices, and weapons of mass destruction. The portfolio includes specialized diagnostic equipment, robotics, and energetically actuated tools, which enable EOD to provide the MAGTF and Marine Special Operations Forces with critical enabling capabilities that deliver responsive, scalable, strategic depth for special operations, crisis response, and littoral access. Littoral Explosive Ordnance Neutralization (LEON) is a Family of Systems consisting of five increments: Remotely Operated Vehicle, Unmanned Underwater Vehicle, Unmanned Surface Vessel, Amphibious Unmanned Ground Vehicle, and Dive Gear/Neutralization Tools. LEON capabilities enable the Explosive Ordnance Disposal (EOD) section to detect, locate, reacquire, render safe/neutralize, recover, exploit, and dispose of underwater explosive ordnance. This full-spectrum capability is achieved by manned and unmanned teaming that exhaust semi-autonomous and remote means before the execution of manual techniques by the individual EOD technician. Army Navy and Primary Diagnosis (AN/PDX-2) Radiation, Indication, and Computation (RADIAC) Set is used to locate radiological sources and provide field expedient collection and identification of radiological spectra for reach-back and analysis. The Expeditionary Disassembly Tool (EDT) provides an encapsulated system that shields the Explosive Ordnance Disposal (EOD) technician from sensitive explosive hazards (EH). The small form factor of the EDT enables EOD Technicians to rapidly employ and displace the system in field environments to conducts Ordnance Exploitation utilizing manual controls to remove explosive components from an item. Explosive Hazard Defeat Systems (EHDS) provides capabilities not found in the current Joint land force structure to defeat explosive hazards and protect Marines and equipment while conducting route and area clearance operations. The EHDS will enable Commanders to deliberately operate in explosive hazards environments by detecting and marking explosive hazards, enabling the Commanders to make timely and informed decisions to avoid the explosive hazards, or, if necessary, neutralize explosive hazards that impede their missions. Multiple detection and marking capabilities will detect a broader spectrum of explosive hazards and achieve higher overall effectiveness rates. Standoff and remote-controlled detection and marking capabilities will remove Joint forces from direct contact with explosive hazards and enhance force protection and the vehicles' system survivability. Operational speeds and rates will increase and better support the operational tempo of the current and future force. ENFIRE is a digital surveying kit designed to collect and disseminate engineer-related information while minimizing exposure to enemy observation. Stand-off Radar Imaging Detection System (SoRIDS) provides ground and air based auto target recognition surface and buried explosive items.
Justification
Justification — EOD Systems
FY 2026 Base Appropriation Request: $21.069M Family of EOD Equipment (FEOD): $17.272M Funding supports engineering, cybersecurity, logistics, acquisition support, and modernization of Explosive Ordnance Disposal tool kits to address new and emerging threats; Littoral Explosive Ordnance Neutralization (LEON) robotic platforms to provide assured mobility from ship to shore; Army, Navy, and Primary Diagnosis (AN/PDX-2) Radiation, Indication, and Computation (RADIAC) Set is used to locate radiological sources and provide field expedient collection and identification of radiological spectra for reach-back and analysis; and Expeditionary Disassembly Tool (EDT) provides an encapsulated system that shields the Explosive Ordnance Disposal (EOD) technician from sensitive explosive hazards (EH). The small form factor of the EDT enables EOD Technicians to rapidly employ and displace the system in field environments to conduct Ordnance Exploitation utilizing manual controls to remove explosive components from an item. Explosive Hazard Defeat Systems (EHDS): $3.797M Funding supports procurement and fielding of Full Force Design Enhancements which includes Combat Engineer tool kit modernization, upgrade Instruction set, reconnaissance, and surveying (ENFIRE) systems with Light Detection and Ranging (LiDAR) capability and procures EHDS Increment 1 Unmanned Ground Vehicles and Unmanned Aerial Vehicles platforms integrated with Electro-Optical/Infra-Red (EO/IR) ground/air sensors and Automatic Target Recognition. The decrease of $9.097M from FY 2025 to FY2026 is due to the completion of the ENFIRE procurement, a sub-system of Counter Improvised Explosive Devices (C-IED). The FY 2026 request was reduced by $1.757 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement, Marine Corps | N | FY24 Actuals | $44.2M |
| Procurement, Marine Corps | N | FY25 Enacted | $30.2M |
| Procurement, Marine Corps | N | FY26 Disc. Request | $21.1M |
| Procurement, Marine Corps | N | FY26 Total | $21.1M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $7.21B | $44.2M | $30.2M | $21.1M | $21.1M |
Follow the dollar
No follow-the-dollar view — none of this program's high-confidence awards records a positive obligation at any place of performance (flows cover 312 of 1,938 programs). why coverage is partial? →
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| TELEDYNE FLIR DEFENSE, INC. | N0017422D0027 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not EOD Systems. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O825
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O799
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O842
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.