Printed from https://fiscalreceipts.com/program/6200C02901/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
High Mobility Artillery Rocket System (HIMARS
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $188.0M |
| FY25 | $79.4M |
| FY26 | $61.5M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $599.8M | $672.1M | $188.0M | ||
| Enacted | – | $155.7M | $179.2M | $79.4M | |
| Request | – | – | $179.2M | $79.4M | $61.5M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $179.2M for FY2024; the PB2026 book reported $188.0M as actual total obligation authority — $8.74M above the request. 187.97 − 179.23 = 8.74 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — High Mobility Artillery Rocket System (HIMARS)
The M142 High Mobility Artillery Rocket System (M142 HIMARS) launcher is a full spectrum, combat proven, all weather, 24/7 lethal and responsive, precision strike weapon system. M142 HIMARS launchers support the Army's Long Range Precision Fires modernization effort. M142 HIMARS provides critical missile precision strike, operational shaping fires, counterfire, and close support destructive and suppressive fires. M142 HIMARS is a C-130 or C-17 transportable, wheeled, indirect fire, rocket/missile launcher capable of firing one pod of precision rockets/missiles from the current Multiple Launch Rocket System (MLRS) Family of Munitions (MFOM), including the Guided MLRS (GMLRS) and the Army Tactical Missile System (ATACMS), and future MFOM to include the Extended Range GMLRS (ER-GMLRS), and the Precision Strike Missile (PrSM). M142 HIMARS launchers support Integrated Fires and Multi-Domain Operations. HIMARS is part of the Army Transformation Initiative. The Army Acquisition Objective (AAO) is 617.
Justification
Justification — High Mobility Artillery Rocket System (HIMARS)
FY2026 Base procurement dollars in the amount of $61.503 million procures six M142 HIMARS launchers and associated equipment. In FY2026, the program office realigned several cost elements to provide budget transparency. Recurring spares costs were previously part of the fielding cost element. CFCS LAG kit procurement is now reflected as a distinctive cost element supporting Peculiar Support Equipment costs. The synergy of foreign military sales and the increased production capacity contributes to a decreased launcher unit cost. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and/or foreign military sales to support additional M142 HIMARS launchers and Fleet Expansion. M142 HIMARS funding decreases $17.884 million from FY2025 and procures four fewer launchers. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Missile Procurement, Army | A | FY24 Actuals | $188.0M |
| Missile Procurement, Army | A | FY25 Enacted | $79.4M |
| Missile Procurement, Army | A | FY26 Disc. Request | $61.5M |
| Missile Procurement, Army | A | FY26 Total | $61.5M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $3.22B | $188.0M | $79.4M | $61.5M | $61.5M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.
| Recipient | PIID | Confidence |
|---|---|---|
| LOCKHEED MARTIN CORPORATION | W31P4Q07C0263 | medium |
| LOCKHEED MARTIN CORPORATION | W31P4Q14C0136 | medium |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not High Mobility Artillery Rocket System (HIMARS. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O74
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O72
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O71
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
Missile Procurement Army · www.asafm.army.mil
PDF page 209