Spares and Repair Parts
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $177.8M |
| FY25 | $240.7M |
| FY26 | $202.4M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $157.1M | $169.9M | $177.8M | ||
| Enacted | – | $170.0M | $177.8M | $240.7M | |
| Request | – | – | $177.8M | $240.7M | $202.4M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Spares and Repair Parts
The Weapons Procurement, Navy (WPN-6) budget line item (BLI) is made up of three budget sub-line items (SUBLIs): SUBLI (20) Initial Spares, SUBLI (30) Torpedo Initial Spares, SUBLI (70) Lay-in and Inventory Augmentation Spares, and SUBLI (90) Vendor Direct/Replenishment spares. Initial spares are components, assemblies, and sub-assemblies that are provided and stocked on active ships, shore sites, and expeditionary units as spare parts for newly fielded weapon systems. Vendor Direct spares are both consumable and repairable parts that are required to replenish stocks for use in maintenance, overhaul, and repair of equipment. Outfitting spares are spare parts that the Navy Supply System has bought in to respond to meet fleet requisitions for newly installed and/or modernized systems. Together they provide for all WPN-6 Spares funding in support of (1) Navy surface ordnance, which consists of all guns, associated equipment (hoists, shields, etc.), and related material support necessary to support fleet readiness capabilities, (2) Anti-Submarine Warfare (ASW) weapons and support equipment, and (3) NAVAIR managed air-launched weapons and associated equipment. Additionally, outfitting spares funding is required for the initial outfitting and repair of expendable item parts, such as guided missile components, and non-recoverable target drone components to address damage incurred while in flight, damage incurred during recovery operations, and for control and telemetry equipment. Navy surface ordnance guns, equipment, and materials consist of the following: - Naval Strike Missile (NSM) - Small Arms and Weapons - Gun Mount Modifications - Airborne Mine Neutralization Systems - Standard Missile - Rolling Airframe Missile (RAM) - Evolved Sea Sparrow Missile (ESSM) - Close-In Weapons System (CIWS) - Coast Guard Weapons (MK-110, MK-160 Gun Control System, MK-38 Machine Gun System) ASW weapons and support equipment consist of the following: - MK-54 Torpedo - MK-48 Torpedo - ASW Range Support Program (Underwater Tracking Range Equipment (UTRE) Program & MK28 Service Weapon Target Test (SWTT) Program) - MK-39 MOD 3 Expendable Mobile ASW (EMATT) - MK-48 Common Broadband Advanced Sonar System (CBASS) Kits - 6T COG (Underwater Mines & Components) - Quickstrike Mine NAVAIR-managed air-launched weapons consist of the following: - Anti-ship, anti-radar, anti-armor, air-to-air, and air-to-surface weapons including Advanced Anti-Radiation Guided Missile (AARGM, AARGM-ER) - High Speed Anti-Radiation Missile (HARM) - Harpoon (air/surface/sub-surface) - Hellfire - Joint Standoff Weapons (JSOW) - Air-to-Surface Guided Missiles or Maverick (AGM-65) - All variants of Long Range Anti-Ship Missile (LRASM) - Airborne Intercept Missile (AIM-9, AIM-120) - Standoff Land Attack Missile - Expanded Response (SLAM-ER) - Small Diameter Bomb Increment II (SDB II) - Joint Air-to-Ground Missiles (JAGM)
Justification
Justification — Spares and Repair Parts
FY 2026 Program Increase Justifications: Initial Spares and Lay-In and Inventory Augmentation Spares: 4206 / Coast Guard Weapons - Increase of $0.013M attributed to increased number of in-service MK160 Fire Control System (FCS), MK110 Gun Mounts, and MK38 Gun Weapon Systems installed aboard growing number of new construction US Coast Guard Navy Type, Navy Owned (NTNO) cutters. 2292 / Naval Strike Missile - Increase of $0.021M minor price growth to account for inflation. 3215 / Spares for WPN MK-54 Torpedo Mods / OPN Sat Com Sys - Increase of $0.028M normal inflation. 3117W / Spares for MK-48 Torpedo - Increase of $6.980M to procure components to meet inventory requirements. 3225 / Spares for MK-48 Torpedo ADCAP Mods - Increase of $0.862M to procure components to meet inventory requirements for Mod 7 and MOD 8 Spares. 4129 / Small Arms and Weapons - The increase in $0.270M (between FY 2025 - FY 2026) procures the US Navy more Squad Common Optics (SCOs). The Navy is currently at approximately 25% of the Authorized Acquisition Objective (AAO) for M83 SCOs. The increase in $0.270M will provide the Navy with the opportunity to procure additional SCOs, bringing the Navy into the 21st century regrading weapon mounted optics and warfighting capabilities by greatly increasing the Probability of Hit (Ph) per weapon system 4217W / Spares for Gun Mount Mods - Increase of $0.074M minor price growth to account for inflation. 2209 / Sidewinder - Increase of $0.747M supports the procurement of spare Weapon Replaceable Assemblies needed for Depot operations to maintain Operational Capability of the FY 2026 procurement quantity of missiles. 2280 / Aerial Targets - Increase of $0.608M supports BQM-177A, BQM-167A and SNTC sparing requirements as projected demand for target presentations rise, as well as the increased rate of expended targets across four sites, in support of Fleet Training and Weapon System Testing. 2291 / LRASM - Increase of $4.081M supports the increased quantities that are being procured in FY26. 2327 / AARGM-ER - Increase of $1.842M supports CATM spares not previously procured, as well as increased quantities of fins, radomes and stakes that are easily damaged with handling. Replenishment Spares 4207 / Coast Guard Weapons - Increase of $0.004k minor price growth to account for inflation. 3141 / Spares for ASW Targets - Increase of $0.034M normal inflation. 3215 / Spares for MK-54 Torpedo Mod - Increase of $0.035M due to normal inflation. 3302 / Spares for ASW Range Support - Increase of $0.011M due to normal inflation. 4225 / Airborne Mine Neutralization Systems - Increase of $0.993M is associated with increased spares requirement due to quantity increase for Archerfish destructor hardware procurement. 2280 / Aerial Targets - Increase of $0.052M supports BQM-177A sparing requirements as projected demand for target presentations rise, as well as the increased rate of expended targets across four sites, in support of Fleet Training and Weapon System Testing.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Weapons Procurement, Navy | N | FY24 Actuals | $177.8M |
| Weapons Procurement, Navy | N | FY25 Enacted | $240.7M |
| Weapons Procurement, Navy | N | FY26 Disc. Request | $202.4M |
| Weapons Procurement, Navy | N | FY26 Total | $202.4M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $0 | $177.8M | $240.7M | $202.4M | $202.4M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
2 mentions from the Senate LDA disclosure database.
Legislative monitoring of consumer privacy issues, vehicle data issues, and AI H.R.1566 - REPAIR Act H.R.1664/S.1492…
Legislative monitoring of consumer privacy issues, vehicle data issues, and AI H.R.1566 - REPAIR Act H.R.1664/S.1492…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Spares and Repair Parts. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O452
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O451
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O461
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.