MLRS Reduced Range Practice Rockets (RRPR)

ArmyProcurementReconciledBLI6060C65405
What it is
MLRS Reduced Range Practice Rockets (RRPR) (6060C65405) is an Army procurement line funded in the Missile Procurement, Army account.
What changed
+$2.11M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$10.3MP-1 TOA · PB2026
FY25 Enacted
$30.2MP-1 TOA · PB2026
FY26 Request
$32.3MP-1 TOA · PB2026
FY25→26 Change
+$2.11MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $10.3MFY25: $30.2MFY26: $32.3MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$10.3M
FY25$30.2M
FY26$32.3M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$29.6M$4.35M$10.3M
Enacted–$4.35M$10.3M$30.2M
Request––$10.3M$30.2M$32.3M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — MLRS Reduced Range Practice Rockets (RRPR)

NOTE: The quantity shown on the P-40 for FY 2025 is incorrect. The Army has implemented a change in acquisition strategy to reduce cost and increase procurement quantity. The correct quantity for FY 2025 is 3,744 LCRRPRs. The P-40 will be updated at the next opportunity. The Multiple Launch Rocket System (MLRS) Low Cost Reduced Range Practice Rocket (LCRRPR) is the only live training rocket that meets the annual qualification and pre-deployment requirements for Active and National Guard High Mobility Artillery Rocket System (HIMARS) and M270/M270A1 MLRS launcher units. The critical validated requirement for launcher units ensures units can achieve and maintain combat readiness. HIMARS and M270A1 Battalions are organic and attached to modular Fires Brigades supporting Brigade Combat Teams (BCTs), Joint Expeditionary Force, and Joint Special Operations Force combatant commanders. The training rocket has an inert payload section and blunt nose for inducing reduced range for use at multiple facilities in the United States and foreign countries. Capabilities exist to produce LCRRPRs at both Lockheed Martin in Camden, Arkansas and Letterkenny Munitions Center (LEMC) in Chambersburg, Pennsylvania production facilities. Total cost also includes bunker storage and the procurement of performance-oriented packaging (POP) boxes, inert warheads, reworked igniters, procurement or repair of launch pod containers (LPCs), download, demate, and inspection of M-26 rocket motors, and obsolescence.

Justification

Justification — MLRS Reduced Range Practice Rockets (RRPR)

FY 2026 Base procurement dollars in the amount of $32.345 million supports the procurement of 4,002 LCRRPRs which are required to maintain the practice rocket inventory to meet annual qualification and pre-deployment requirements for Active and National Guard High Mobility Artillery Rocket System (HIMARS) and M270/M270A1 MLRS launcher units. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and/or foreign military sales to support procurement of additional LCRRPR rockets. Funding increase from $30.230M in FY 2025 to $32.345M in FY 2026 due to an increase in quantities to be procured. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Missile Procurement, ArmyAFY24 Actuals$10.3M
Missile Procurement, ArmyAFY25 Enacted$30.2M
Missile Procurement, ArmyAFY26 Disc. Request$32.3M
Missile Procurement, ArmyAFY26 Total$32.3M

Exhibit P-1R

AccountOrgTypeAmount
Missile Procurement, ArmyAFY24 Actuals$2.77M
Missile Procurement, ArmyAFY25 Enacted$7.19M
Missile Procurement, ArmyAFY 2026 request$7.06M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$395.6M$10.3M$30.2M$32.3M$32.3M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not MLRS Reduced Range Practice Rockets (RRPR). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.