Printed from https://fiscalreceipts.com/program/6058/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Pollution Control Equipment
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $2.65M |
| FY25 | $3.92M |
| FY26 | $4.01M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $5.37M | $6.84M | $2.65M | ||
| Enacted | – | $2.84M | $3.90M | $3.92M | |
| Request | – | – | $3.90M | $3.92M | $4.01M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $3.90M for FY2024; the PB2026 book reported $2.65M as actual total obligation authority — $1.25M below the request. 2.65 − 3.90 = -1.25 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Pollution Control Equipment
The Navy Ashore Pollution Control Equipment program funds hazardous substance spill containment and recovery systems. Funding requirements for the Navy's oil spill program include procurement of oil spill containment booms and related deployment equipment. After initial containment with boom, shore activities can efficiently collect spilled oil with vacuum trucks. This equipment will enable the Navy to meet the requirements established by the U.S. Environmental Protection Agency (EPA) in the National Contingency Plan which requires rapid and effective response to oil spills. The revised National Spill Contingency Plan mandates that the DoD and the Navy assume responsibility for their own oil and hazardous substance spills. These broad responsibilities require the Navy to maintain sufficient spill response equipment for the Navy activities worldwide, such as oil spill containment systems and recovery systems. The severe oil spills in Alaska, California and the Gulf of Mexico have increased the public's sensitivity to releases of oil into the environment.
Justification
Justification — Pollution Control Equipment
Additional procurement of shore-based oil spill response equipment in FY26 is required in order to improve mission readiness at Naval Installations. Without additional procurement, there will be increased maintenance costs to extend equipment service life and readiness which is impacted during increased maintenance cycle times.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Navy | N | FY24 Actuals | $2.65M |
| Other Procurement, Navy | N | FY25 Enacted | $3.92M |
| Other Procurement, Navy | N | FY26 Disc. Request | $4.01M |
| Other Procurement, Navy | N | FY26 Total | $4.01M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $21.5M | $2.65M | $3.92M | $4.01M | $4.01M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Pollution Control Equipment. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O750
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O726
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O764
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
OPN BA1 Book · www.secnav.navy.mil