Skip to content
Fiscal Receipts

Pollution Control Equipment

NProcurementPartial Reconciliation6058
What it is
Pollution Control Equipment — a procurement program run by Navy.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$2.65M
FY25 Total
FY26 Request
$4.01M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $2.65MFY26: $4.01MFY24FY26
FY24
$2.65M
FY26
$4.01M
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$5.37M$6.84M$2.65M
Enacted$2.84M$3.90M$3.92M
Request$3.90M$3.92M$4.01M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $3.90M for FY2024; the PB2026 book reports $2.65M actually spent — $1.25M below the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description Pollution Control Equipment

The Navy Ashore Pollution Control Equipment program funds hazardous substance spill containment and recovery systems. Funding requirements for the Navy's oil spill program include procurement of oil spill containment booms and related deployment equipment. After initial containment with boom, shore activities can efficiently collect spilled oil with vacuum trucks. This equipment will enable the Navy to meet the requirements established by the U.S. Environmental Protection Agency (EPA) in the National Contingency Plan which requires rapid and effective response to oil spills. The revised National Spill Contingency Plan mandates that the DoD and the Navy assume responsibility for their own oil and hazardous substance spills. These broad responsibilities require the Navy to maintain sufficient spill response equipment for the Navy activities worldwide, such as oil spill containment systems and recovery systems. The severe oil spills in Alaska, California and the Gulf of Mexico have increased the public's sensitivity to releases of oil into the environment.

Justification

Justification Pollution Control Equipment

Additional procurement of shore-based oil spill response equipment in FY26 is required in order to improve mission readiness at Naval Installations. Without additional procurement, there will be increased maintenance costs to extend equipment service life and readiness which is impacted during increased maintenance cycle times.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, NavyNFY24 Actuals$2.65M
Other Procurement, NavyNFY25 Enacted$3.92M
Other Procurement, NavyNFY26 Disc. Request$4.01M
Other Procurement, NavyNFY26 Total$4.01M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$21.5M$2.65M$3.92M$4.01M$4.01M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →