What it is
Guided MLRS Rocket (GMLRS) — a procurement program run by Army.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$1.37B
FY25 Total
FY26 Request
$1.17B
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $1.40BFY26: $1.17BFY24FY26
FY24
$1.40B
FY26
$1.17B
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$1.13B$2.17B$1.40B
Enacted$1.31B$942.3M$1.20B
Request$942.3M$1.22B$1.17B

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $942.3M for FY2024; the PB2026 book reports $1.40B actually spent — $455.8M above the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description Guided MLRS Rocket (GMLRS)

Guided Multiple Launch Rocket System (GMLRS) rockets are surface-to-surface artillery rockets fired from the Multiple Launch Rocket System (MLRS) and High Mobility Artillery Rocket System (HIMARS) launchers. GMLRS rockets provide 24/7, all-weather precision fires to engage both area and point targets at short, medium, and long ranges. The U.S. Marine Corps also procures GMLRS rockets through the Army project office. The GMLRS Program currently consists of two variants in full rate production which are the GMLRS Unitary and the GMLRS Alternative Warhead (AW). The GMLRS Unitary utilizes a 200-pound high explosive warhead to engage point targets with limited collateral damage. The GMLRS AW was developed as a non-cluster munition to engage area or imprecisely located targets. The Extended Range (ER) GMLRS Unitary variant was developed under an Engineering Change Proposal (ECP) in order to increase the current maximum design range. The ER GMLRS Unitary rocket is currently in production and the ER GMLRS AW will cut into future production.

Justification

Justification Guided MLRS Rocket (GMLRS)

The FY 2026 Base procurement dollars in the amount of $1,167.876 million supports the procurement of 5,974 rockets. FY 2026 OOC procurement dollars in the amount of $0.351 million supports the acquisition of 2 Standard AW rockets. The actual missile buy quantities are subject to the mix between AW and Unitary warheads, Standard (regular range) versus Extended Range configurations, and Extended Range ECP production capacity ramp-up. In FY 2026, Army guidance is to procure 2,814 Standard Unitary, 2,934 Standard AW, and 228 ER GMLRS Unitary in support of the Army's Total Munitions Requirement (TMR). The Army intends to convert any price advantage created through contract negotiations, other service procurement, and/or foreign military sales to support procurement of additional GMLRS rockets. In previous years, procurement of all GMLRS and ER-GMLRS variants was under the C65404 Program Element (PE). Beginning in FY 2026, the Army established separate PEs for each variant to properly account for different cost, schedule, and performance metrics. The Army received authority to implement a four-year Multi-Year Procurement (MYP) contract covering FY 2024 - FY 2027. FY 2026 Advance Procurement dollars in the amount of $43.156 million procures long lead items for GMLRS production in FY 2027. Advance Procurement dollars are required to reduce production lead time of standard range GMLRS and ER-GMLRS from 36 months down to 24 months to mitigate supply chain volatility. Advance Procurement is required annually to maintain a 24-month lead time. Funding decrease from $1198.264 million in FY 2025 to $1168.227 million in FY 2026 due to decrease in quantities to be procured. The total production capacity is 14,004 rockets inclusive of all variants. The AAO is 140,004. GMLRS is part of the Army Transformation Initiative. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2024 quantities are suppressed to avoid the disclosure of sensitive information.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Missile Procurement, ArmyAFY24 Actuals$1.40B
Missile Procurement, ArmyAFY25 Enacted$1.20B
Missile Procurement, ArmyAFY26 Disc. Request$1.17B
Missile Procurement, ArmyAFY26 Total$1.17B

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$11.4B$1.37B$1.17B$1.12B$1.13B

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Program dossier

Every sentence below carries its citation — warehouse figures open the citation panel, news claims link the cached source.

Research dossiers exist for 50 of 1741 programs — the 50 largest fully J-book-detailed programs by FY2026 request. why no dossier here? →

What it is

  • Guided MLRS Rocket (GMLRS) (budget line 6005C64400) is a U.S. Army procurement line funded in the Missile Procurement, Army account.
  • GMLRS rockets are surface-to-surface artillery rockets fired from the Multiple Launch Rocket System (MLRS) and High Mobility Artillery Rocket System (HIMARS) launchers, providing all-weather precision fires against area and point targets at short, medium, and long ranges.
  • The program has two variants in full-rate production — the GMLRS Unitary, with a 200-pound high-explosive warhead for point targets, and the GMLRS Alternative Warhead (AW), a non-cluster munition for area targets — plus an Extended Range (ER) GMLRS Unitary variant now in production.
  • The FY2026 base request supports procurement of 5,974 rockets, with Army guidance to buy 2,814 Standard Unitary, 2,934 Standard AW, and 228 ER GMLRS Unitary rounds in support of the Army's Total Munitions Requirement.

Why it matters

  • The line's total funding is $1,168,227 thousand (about $1.17 billion) requested for FY2026, down slightly from $1,198,264 thousand enacted in FY2025.
  • In FY2024 the line recorded actual spending of $1,398,086 thousand (about $1.40 billion), so the FY2026 request continues below recent execution levels.
  • The entire FY2026 request is discretionary funding — the P-1 exhibit shows a discretionary request of $1,168,227 thousand and no separate reconciliation (mandatory) request for this line.
  • The program's justification attributes the funding decrease from $1,198.264 million in FY2025 to $1,168.227 million in FY2026 to a decrease in the quantity of rockets to be procured.
  • The line matters because GMLRS is a high-demand precision-fires munition covered by a four-year Multi-Year Procurement contract spanning FY2024 through FY2027, and it is part of the Army Transformation Initiative.

Key players

  • The line is run by the U.S. Army, with funding drawn from the Missile Procurement, Army appropriation.
  • The U.S. Marine Corps also procures GMLRS rockets through the Army project office, making it a shared precision-fires acquisition.