Skip to content
Fiscal Receipts

JOINT LIGHT TACTICAL VEHICLE FAMILY OF VEHICL

ArmyProcurementReconciledBLI5731D15610
Watch this program

Published budget signals for this program, with links to receipts.

Updates appear after a data refresh and publication. No fixed update schedule is available.

Paste the RSS address into a feed reader. No Fiscal Receipts account is required.

RSSAtom

What it is
JOINT LIGHT TACTICAL VEHICLE FAMILY OF VEHICL (5731D15610) is an Army procurement line funded in the Other Procurement, Army account.
What changed
-$582.1M FY25→26 P-1 TOA · PB2026
Who gets it
OSHKOSH leads 2 contractor families sharing $8.35B in high-confidence matched awards.

Budget figures

FY24 Actuals
$795.5MP-1 TOA · PB2026
FY25 Enacted
$628.0MP-1 TOA · PB2026
FY26 Request
$45.8MP-1 TOA · PB2026
FY25→26 Change
-$582.1MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $795.5MFY25: $628.0MFY26: $45.8MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$795.5M
FY25$628.0M
FY26$45.8M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$574.6M$858.8M$795.5M
Enacted–$664.1M$839.4M$628.0M
Request––$839.4M$653.2M$45.8M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $839.4M for FY2024; the PB2026 book reported $795.5M as actual total obligation authority — $44.0M below the request. 795.46 − 839.41 = -43.95 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — JOINT LIGHT TACTICAL VEHICLE FAMILY OF VEHICLES

(Note: Gross/Weapon System Unit Cost is a function of both Joint Light Tactical Vehicle (JLTV) Truck and JLTV Trailer quantities and unit costs. The different JLTV Truck variants (General Purpose, Heavy Guns Carrier Vehicle, Close Combat Weapons Carrier, and Utility) affect the JLTV unit costs. The Joint Light Tactical Vehicle (JLTV) Family of Vehicles (FoV), to include a companion trailer, is a United States Army (USA) acquisition lead, joint program with the U.S. Marine Corps (USMC). FOV consists of various configurations, capable of performing multiple mission roles and designed to provide protected, sustained, networked mobility for personnel and payloads across the full range of military operations. JLTV objectives include increased protection and performance over the current fleet; and, minimizing ownership costs by maximizing commonality, fuel efficiency, reliability, and maintaining effective competition throughout the life cycle. Commonality of components, maintenance procedures, training, etc., among vehicles is expected to be inherent in FoV solutions across mission variants to minimize total ownership cost. Unique service requirements have been minimized. The approved Army Procurement Objective (APO) is 49,099 trucks for the U.S. Army. The JLTV Trailer (JLTV-T) is the companion trailer to the JLTV and safely carries its payload while maintaining the same mobility characteristics of the prime mover. The JLTV-T will be fielded to units receiving JLTV trucks with a documented trailer requirement. The approved Army Procurement Objective (APO) is 18,224 for JLTV-T for the U.S. Army. JLTV is part of the Army Transformation Initiative.

Justification

Justification — JOINT LIGHT TACTICAL VEHICLE FAMILY OF VEHICLES

FY 2026 Base procurement dollars in the amount of $45.840 million supports fielding, completion of Full Material Release (FMR), transition to sustainment, and program transition to USMC as the acquisition lead program. The Joint Light Tactical Vehicles (JLTV) Trailer program does not have a FY 2026 base funding request. JLTV allocations are based on 24 month fielding plans that are updated semi-annually based on operational requirements. For FY 2026 - FY 2030, there are no National Guard or Reserve units identified in the 24 month fielding window that have not been previously funded. The Army remains committed to fielding National Guard and Reserve units with their authorized quantities of JLTVs and JLTV trailers. The total quantities listed on the P-40 are not accurate. The correct quantity for vehicles is as follows: Prior Year - 5,366; FY24 - 1,623; The correct quantity for trailers is as follows: Prior Year - 3,854; FY25: 360. The correct quantities are reflected on each P-5. NOTE: This budget line D15610 is a continuation of an existing effort where prior year funds through FY 2020 are reflected under the previous budget line D15603. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. JLTV is part of the Army Transformation Initiative.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$795.5M
Other Procurement, ArmyAFY25 Enacted$628.0M
Other Procurement, ArmyAFY26 Disc. Request$45.8M
Other Procurement, ArmyAFY26 Total$45.8M

Exhibit P-1R

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$211.5M
Other Procurement, ArmyAFY25 Enacted$19.0M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$2.30B$795.5M$628.0M$45.8M$45.8M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the A appropriation, program element 5731D15610 (JOINT LIGHT TACTICAL VEHICLE FAMILY OF VEHICL), its 3 largest high-confidence awards, the 2 recipient families behind them, and the 2 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the A appropriation, program element 5731D15610 (JOINT LIGHT TACTICAL VEHICLE FAMILY OF VEHICL), its 3 largest high-confidence awards, the 2 recipient families behind them, and the 2 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSAProcurement appropriation5731D1561045.8M FY26W56HZV15C0095OSHKOSH DEFENSE LLC5.78BW56HZV20C0050OSHKOSH DEFENSE LLC2.17BW56HZV23F0294AM GENERAL LLC581.3MOshkosh CorpAM General LLCWI-06IN-02

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
WI-06$7.77B
IN-02$580.5M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
AM GENERAL LLCW56HZV23F0294high
OSHKOSH DEFENSE LLCW56HZV15C0095high
OSHKOSH DEFENSE LLCW56HZV20C0050high

Contractor concentration

HHI Indexⓘ
8729
Highly Concentrated
2023 Merger Guidelines bands
Top Contractor
OSHKOSH
Contractor Families
2
Program Obligationsⓘ
$8.35B

High-confidence award links only, pooled across ingested years. The index uses positive obligations; program obligations are net of deobligations. The figures over every published link, including medium-confidence ones, are in the downloadable warehouse, not on this page — why.

Lobbying mentions

23 mentions from the Senate LDA disclosure database.

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSVEHICLE|FAMILY2026matched 2+ title words

Domestic Manufacturing Conversion grants. Autonomous vehicle manufacturing labor standards. Auto tariffs and reshoring…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSLIGHT|VEHICLE|FAMILY2026matched 2+ title words

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

HONEYWELL INTERNATIONALLIGHT|VEHICLE2025matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

HONEYWELL INTERNATIONALLIGHT|VEHICLE2025matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

HONEYWELL INTERNATIONALLIGHT|VEHICLE2025matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSLIGHT|VEHICLE|FAMILY2025matched 2+ title words

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSLIGHT|VEHICLE|FAMILY2025matched 2+ title words

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSLIGHT|VEHICLE|FAMILY2025matched 2+ title words

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSLIGHT|VEHICLE|FAMILY2025matched 2+ title words

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSLIGHT|VEHICLE|FAMILY2025matched 2+ title words

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

HONEYWELL INTERNATIONALLIGHT|VEHICLE2024matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

HONEYWELL INTERNATIONALLIGHT|VEHICLE2024matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

HONEYWELL INTERNATIONALLIGHT|VEHICLE2024matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

HONEYWELL INTERNATIONALLIGHT|VEHICLE2024matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

PHILLIPS 66LIGHT|VEHICLE2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

PHILLIPS 66LIGHT|VEHICLE2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

PHILLIPS 66LIGHT|VEHICLE2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

PHILLIPS 66LIGHT|VEHICLE2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSLIGHT|VEHICLE|FAMILY2024matched 2+ title words

National Heritage Area Act, Inflation Reduction Act (H.R.5376), Advanced Technology Vehicles Manufacturing Loan…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSLIGHT|VEHICLE|FAMILY2024matched 2+ title words

Advanced Technology Vehicles Manufacturing Loan Program (ATVM), Domestic Manufacturing Conversion grants, Autonomous…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSLIGHT|VEHICLE|FAMILY2024matched 2+ title words

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSLIGHT|VEHICLE|FAMILY2024matched 2+ title words

National Heritage Area Act, Inflation Reduction Act (H.R.5376), Advanced Technology Vehicles Manufacturing Loan…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSLIGHT|VEHICLE|FAMILY2024matched 2+ title words

National Heritage Area Act, Inflation Reduction Act (H.R.5376), Advanced Technology Vehicles Manufacturing Loan…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not JOINT LIGHT TACTICAL VEHICLE FAMILY OF VEHICL. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.