NavyProcurementReconciledBLI5543
What it is
Items Less Than $5 Million (5543) is a Navy procurement line funded in the Other Procurement, Navy account.
What changed
+$442.0K FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$4.77MP-1 TOA · PB2026
FY25 Enacted
$3.19MP-1 TOA · PB2026
FY26 Request
$3.63MP-1 TOA · PB2026
FY25→26 Change
+$442.0KP-1 TOA · PB2026

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget Trajectory
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $4.77MFY25: $3.19MFY26: $3.63MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$4.77M
FY25$3.19M
FY26$3.63M

All series figures: P-1 TOA · PB2026

Decade view — P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$10.8M$9.91M$6.24M$5.98M$5.38M$5.07M$5.13M$7.00M$4.75M$4.77M
Enacted$9.91M$6.24M$5.98M$5.38M$5.07M$6.36M$8.75M$5.94M$6.17M$3.19M
Request$6.24M$5.98M$5.38M$5.07M$6.36M$8.75M$5.94M$6.17M$3.19M$3.63M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $6.17M for FY2024; the PB2026 book reported $4.77M as actual total obligation authority — $1.40M below the request. 4.8 − 6.2 = -1.4 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Items Less Than $5 Million

Items Less Than $5 Million procures generic (non-weapons systems specific) test equipment needed to assess the effects of aging and exposure to environmental conditions on Navy weapons systems and ordnance such as mines, gun ammunition, missiles, pyrotechnics, demolition systems/devices, bombs, and torpedoes throughout the in-service portion of their life cycle and will be located at NAVSEA engineering field activities. Requirements for the test equipment come from a need to replace or modernize obsolete or economically non-repairable equipment or to acquire new or expanded generic test capabilities when new evaluation techniques or processes are needed. The equipment procured by these funds are generally "one of a kind" and are used to support generic Navy weapons systems and ordnance types. Weapons systems specific equipment is procured/funded via the individual weapons system Program Management offices. After the weapon specific equipment has entered the inventory, these funds adapt the capability, if feasible, to become more generic and support more than one weapon system. This reduces the overall economic burden to the Navy. RA005 - FLEET MINE SUPPORT EQUIPMENT: Mine Countermeasure (MCM) Targets are used to physically and electronically emulate foreign mine threats for Fleet training, exercises, ranges, and platform and system validation. Instrumented MCM targets can be programmed to behave and function like real foreign mine threats for mine sweeping and platform validation whereas non-instrumented MCM targets emulate foreign threats physically for mine hunting, mine neutralization, and system validation. RA003 - INDUSTRIAL FACILITIES: Description: Provides funding for the procurement of industrial equipment in support of core manufacturing and production requirements at the Government-Owned/Contractor- Operated (GOCO) Naval Industrial Reserve Ordnance Plant (NIROP) Allegany Ballistics Laboratory (ABL) located in Rocket Center, WV. NIROP ABL is a key U.S. military industrial facility that is the source of tactical missile propulsion systems, fuzes, conventional warheads, metal and composite structures and precision projectiles in accordance with the Defense Industrial Reserve Act (10 USC 2535). Supports environmental, safety, energy conservation, and major repair projects at the GOCO facility.

Justification

Justification — Items Less Than $5 Million

The FY 2026 request was reduced by $0.005 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative." FY26 funding supports the Fleet Mine Support Equipment program, as well as the procurement of an Automatic Bar Machine to be used to fabricate metal parts to support rocket motor and warhead production. This new machine will support continued efforts to maintain efficiency in the manufacturing process as it replaces shop equipment nearing the end of useful life.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, NavyNFY24 Actuals$4.77M
Other Procurement, NavyNFY25 Enacted$3.19M
Other Procurement, NavyNFY26 Disc. Request$3.63M
Other Procurement, NavyNFY26 Total$3.63M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$106.8M$4.77M$3.19M$3.63M$3.63M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 310 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Items Less Than $5 Million. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.