What it is
LCAC SLEP (5139) is a Navy procurement line funded in the Shipbuilding and Conversion, Navy account.
What changed
-$7.70M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$15.3MP-1 TOA · PB2026
FY25 Enacted
$45.1MP-1 TOA · PB2026
FY26 Request
$37.4MP-1 TOA · PB2026
100.0% reconciliation

$37.4M one-time reconciliation. Discretionary change vs FY2025 enacted: -100.0%.

FY25→26 Change
-$7.70MP-1 TOA · PB2026

Two official figures, one label— reconciled below

Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →

FY26 Request · $37.4M TOA − $0 J-book line (a zero-dollar XML line) = 37.4M (37.4 − 0.0 = 37.4) — $37.4M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement

Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $15.3MFY25: $45.1MFY26: $37.4MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$15.3M
FY25$45.1M
FY26$37.4M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$17.7M$36.3M$15.3M
Enacted–$36.3M$15.3M$45.1M
Request––$15.3M$45.1M$37.4M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — LCAC SLEP

For the Landing Craft, Air Cushion (LCAC) Extended Service Life Extension Program (ESLEP), the Department requests a total of $37,390 thousand and a total quantity of one. This request includes $0 thousand of discretionary funding and $37,390 thousand of mandatory (reconciliation) funding. The mandatory funds support the contract award of 1 LCAC ESLEP. Further information for this reconciliation request is provided in Section 20002 (Shipbuilding) of the Reconciliation Exhibit. LCAC transports weapon systems, equipment, cargo and personnel of the assault elements of the Marine Air/Ground Task Force from ship to shore and across the beach. The LCAC Service Life Extension Program (SLEP) and LCAC Extended Service Life Extension Program (ESLEP) extends the craft service life past the original twenty years. The LCAC SLEP program incorporates the following modifications and enhancements: upgrade from the TF40B engines to the ETF40B engines; repair corrosion damage; replace obsolete electronics; upgrade C4N suite; and replace deep skirt. The LCAC SLEP program was completed in March 2022 with the delivery of LCAC SLEP 77. The LCAC ESLEP program incorporates the following modifications and enhancements: repairs corrosion damage; replaces obsolete electronics, upgrades C4N including cyber hardening; and replaces the deep skirt.

Justification

Justification — LCAC SLEP

The FY 2026 request for LCAC ESLEP includes $0 thousand of discretionary and $37,390 thousand of mandatory (reconciliation) for a total of $37,390 thousand. The mandatory funds fully fund a LCAC E-SLEP availability for one craft. Further information for this reconciliation request is provided in Section 20002 (Shipbuilding) of the Reconciliation Exhibit.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Shipbuilding and Conversion, NavyNFY24 Actuals$15.3M
Shipbuilding and Conversion, NavyNFY25 Enacted$45.1M
Shipbuilding and Conversion, NavyNFY26 Reconciliation$37.4M
Shipbuilding and Conversion, NavyNFY26 Total$37.4M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$1.53B$15.3M$45.1M$0$0

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not LCAC SLEP. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.