What it is
Ship to Shore Connector (5112) is a Navy procurement line funded in the Shipbuilding and Conversion, Navy account.
What changed
-$288.9M FY25→26 P-1 TOA · PB2026
Who gets it
TEXTRON SYSTEMS leads 3 contractor families sharing $1.81B in high-confidence matched awards.

Budget figures

FY24 Actuals
$628.6MP-1 TOA · PB2026
FY25 Enacted
$528.0MP-1 TOA · PB2026
FY26 Request
$239.1MP-1 TOA · PB2026
100.0% reconciliation

$239.1M one-time reconciliation. Discretionary change vs FY2025 enacted: -100.0%.

FY25→26 Change
-$288.9MP-1 TOA · PB2026

Two official figures, one label— reconciled below

Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →

FY26 Request · $239.1M TOA − $15.5M J-book line = 223.6M (239.1 − 15.5 = 223.6) — $239.1M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement

Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $628.6MFY25: $528.0MFY26: $239.1MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$628.6M
FY25$528.0M
FY26$239.1M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$391.8M$454.5M$628.6M
Enacted–$454.5M–$528.0M
Request––$0–$239.1M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $0 for FY2024; the PB2026 book reported $628.6M as actual total obligation authority — $628.6M above the request. 628.6 − 0.0 = 628.6 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Ship to Shore Connector

For the Ship to Shore Connector (SSC) program, the Department requests a total of $239,095 thousand and a total quantity of one. This request includes $0 thousand of discretionary funding and $239,095 thousand of mandatory (reconciliation) funding. The mandatory funds support the contract award of 1 SSC. Further information for this reconciliation request is provided in Section 20002 (Shipbuilding) of the Reconciliation Exhibit. The SSC program provides the capability to rapidly move assault forces within the littoral operational environment to accomplish Unified Command Plan (UCP) missions. SSC ensures the Joint Force Commander's (JFCDR) ability to conduct amphibious operations and operate over the high-water mark, including movement over ice, mud, rivers, swamps, and marshes. SSC provides the functional replacement for the Landing Craft, Air Cushion (LCAC) Class of ships, which began reaching extended service life in 2015.

Justification

Justification — Ship to Shore Connector

The FY 2026 request for SSC includes $0 of discretionary and $239,095 thousand of mandatory (reconciliation) for a total of $239,095 thousand. The mandatory funds will procure one additional SSC craft. Further information for this reconciliation request is provided in Section 20002 (Shipbuilding) of the Reconciliation Exhibit.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Shipbuilding and Conversion, NavyNFY24 Actuals$628.6M
Shipbuilding and Conversion, NavyNFY25 Enacted$528.0M
Shipbuilding and Conversion, NavyNFY26 Reconciliation$239.1M
Shipbuilding and Conversion, NavyNFY26 Total$239.1M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$2.48B$628.6M$528.0M$15.5M$15.5M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the N appropriation, program element 5112 (Ship to Shore Connector), its 4 largest high-confidence awards, the 3 recipient families behind them, and the 3 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the N appropriation, program element 5112 (Ship to Shore Connector), its 4 largest high-confidence awards, the 3 recipient families behind them, and the 3 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSNProcurement appropriation5112239.1M FY26N0002417C2480TEXTRON SYSTEMS CORP995.7MN0001917C0081ROLLS-ROYCE CORPORATION520.7MN0002425C2405ROLLS-ROYCE CORPORATION241.2MN0002424C2461SEEMANN COMPOSITES, LLC54.3MTextron Systems CorpRolls-Royce Holdings PLCSEEMANN COMPOSITES, LLCLA-01IN-07MS-04

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
LA-01$992.9M
IN-07$761.9M
MS-04$54.3M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
ROLLS-ROYCE CORPORATIONN0001917C0081high
ROLLS-ROYCE CORPORATIONN0002425C2405high
SEEMANN COMPOSITES, LLCN0002424C2461high
TEXTRON SYSTEMS CORPN0002417C2480high

Contractor concentration

HHI Indexⓘ
4797
Highly Concentrated
2023 Merger Guidelines bands
Top Contractor
TEXTRON SYSTEMS
Contractor Families
3
Program Obligationsⓘ
$1.81B

High-confidence award links only, pooled across ingested years. The index uses positive obligations; program obligations are net of deobligations. The figures over every published link, including medium-confidence ones, are in the downloadable warehouse, not on this page — why.

Lobbying mentions

10 mentions from the Senate LDA disclosure database.

TEXTRON INC.Shore|Connector2026matched 2+ title words

Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle

TEXTRON INC.Shore|Connector2026matched 2+ title words

Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle

TEXTRON INC.Shore|Connector2025matched 2+ title words

Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle

TEXTRON INC.Shore|Connector2025matched 2+ title words

Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle

TEXTRON INC.Shore|Connector2025matched 2+ title words

Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle

TEXTRON INC.Shore|Connector2025matched 2+ title words

Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle

TEXTRON INC.Shore|Connector2024matched 2+ title words

Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle

TEXTRON INC.Shore|Connector2024matched 2+ title words

Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle

TEXTRON INC.Shore|Connector2024matched 2+ title words

Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle

TEXTRON INC.Shore|Connector2024matched 2+ title words

Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Ship to Shore Connector. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.