Budget figures
$239.1M one-time reconciliation. Discretionary change vs FY2025 enacted: -100.0%.
Two official figures, one label— reconciled below
Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →
FY26 Request · $239.1M TOA − $15.5M J-book line = 223.6M (239.1 − 15.5 = 223.6) — $239.1M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement
Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $628.6M |
| FY25 | $528.0M |
| FY26 | $239.1M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $391.8M | $454.5M | $628.6M | ||
| Enacted | – | $454.5M | – | $528.0M | |
| Request | – | – | $0 | – | $239.1M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $0 for FY2024; the PB2026 book reported $628.6M as actual total obligation authority — $628.6M above the request. 628.6 − 0.0 = 628.6 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Ship to Shore Connector
For the Ship to Shore Connector (SSC) program, the Department requests a total of $239,095 thousand and a total quantity of one. This request includes $0 thousand of discretionary funding and $239,095 thousand of mandatory (reconciliation) funding. The mandatory funds support the contract award of 1 SSC. Further information for this reconciliation request is provided in Section 20002 (Shipbuilding) of the Reconciliation Exhibit. The SSC program provides the capability to rapidly move assault forces within the littoral operational environment to accomplish Unified Command Plan (UCP) missions. SSC ensures the Joint Force Commander's (JFCDR) ability to conduct amphibious operations and operate over the high-water mark, including movement over ice, mud, rivers, swamps, and marshes. SSC provides the functional replacement for the Landing Craft, Air Cushion (LCAC) Class of ships, which began reaching extended service life in 2015.
Justification
Justification — Ship to Shore Connector
The FY 2026 request for SSC includes $0 of discretionary and $239,095 thousand of mandatory (reconciliation) for a total of $239,095 thousand. The mandatory funds will procure one additional SSC craft. Further information for this reconciliation request is provided in Section 20002 (Shipbuilding) of the Reconciliation Exhibit.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Shipbuilding and Conversion, Navy | N | FY24 Actuals | $628.6M |
| Shipbuilding and Conversion, Navy | N | FY25 Enacted | $528.0M |
| Shipbuilding and Conversion, Navy | N | FY26 Reconciliation | $239.1M |
| Shipbuilding and Conversion, Navy | N | FY26 Total | $239.1M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $2.48B | $628.6M | $528.0M | $15.5M | $15.5M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| ROLLS-ROYCE CORPORATION | N0001917C0081 | high |
| ROLLS-ROYCE CORPORATION | N0002425C2405 | high |
| SEEMANN COMPOSITES, LLC | N0002424C2461 | high |
| TEXTRON SYSTEMS CORP | N0002417C2480 | high |
Contractor concentration
High-confidence award links only, pooled across ingested years. The index uses positive obligations; program obligations are net of deobligations. The figures over every published link, including medium-confidence ones, are in the downloadable warehouse, not on this page — why.
Lobbying mentions
10 mentions from the Senate LDA disclosure database.
Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle
Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle
Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle
Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle
Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle
Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle
Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle
Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle
Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle
Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Ship to Shore Connector. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O589,O590
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O580
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O605
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.