Printed from https://fiscalreceipts.com/program/5111/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Ship Gun Systems Equipment
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $16.3M |
| FY25 | $6.42M |
| FY26 | $7.36M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $5.54M | $5.90M | $16.3M | ||
| Enacted | – | $5.90M | $6.40M | $6.42M | |
| Request | – | – | $6.40M | $6.42M | $7.36M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $6.40M for FY2024; the PB2026 book reported $16.3M as actual total obligation authority — $9.85M above the request. 16.25 − 6.40 = 9.85 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Ship Gun Systems Equipment
Ship gun system equipment provides funds for the procurement of equipment, material and Ordnance Alterations to improve combat effectiveness and logistic supportability for gun and mission planning systems, and ancillary support equipment. P40A - 1/ The Naval Fires Control System is an automated mission planning and coordination system for the Naval Surface Fire Support (NSFS) System. It automates shipboard land attack battle management duties to be interoperable and consistent with joint C4ISR systems. The system significantly improves the Navy's ability to support forces ashore. These improvements provide enhanced capabilities and reduce total ownership costs by improving reliability and supportability of in-service systems. This system also reduces manning requirements for NSFS missions. [P40A - 2 / NV039 Night Vision Devices]: [P40A - 2 / NV039 VISUAL AUGMENTATION SYSTEMS (VAS)]: The United States Navy Service Common Visual Augmentation Systems (VAS) Program of Record manages, procures, and maintains night vision devices, thermal detection devices, day/night weapons optics, and lasers in support of Navy combat capabilities with regard to the detection, recognition, classification, tracking, and destruction of hostile air and surface forces. The USN VAS Program also manages research into the future of visual augmentation systems and engages with Navy and DoD VAS stakeholders to ensure the Navy maintains competitive advantage over near-peer adversaries. Other Procurement, Navy funding provides the United States Navy Service Common Visual Augmentation Systems (VAS) Program of Record with funding to procure new and replacement night vision equipment, thermal detection equipment, day/night optics and associated test equipment for ships, submarines, carriers, expeditionary forces and shore installations so that commanders can maintain situational awareness in degraded visual environments while maintaining the greatest possible distance from threats. [P40A - 2 / NV051 Optical Sight Systems Production Improvement]: Procures various Product Improvements for MK46 OSS/MK20 Electro-Optical Sight System (EOSS) on DDG 51 and CG 47 Class ships. The OSS is an integral element of the MK 34 Gun Weapon System. These improvements provide enhanced force protection capabilities, improve availability to address increase in Fleet underway operations, and reduce total ownership costs by improved reliability and supportability of in-service equipment systems. System and component improvements include: Mod 0 Technical Refresh, upgrade of Daylight Imaging Sensor Field of View, system power supplies, Mod 0 console / monitor upgrade, system obsolescence replacement and component level product improvements. [P40A - 2 / 98 Visual Augmentation System]: The Naval Fires Control System is an automated mission planning and coordination system for the Naval Surface Fire Support (NSFS) System. It automates shipboard land attack battle management duties to be interoperable and consistent with joint C4ISR systems. The system significantly improves the Navy's ability to support forces ashore. These improvements provide enhanced capabilities and reduce total ownership costs by improving reliability and supportability of in-service systems. This system also reduces manning requirements for NSFS missions.
Justification
Justification — Ship Gun Systems Equipment
The FY 2026 request was reduced by $.517 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Navy | N | FY24 Actuals | $16.3M |
| Other Procurement, Navy | N | FY25 Enacted | $6.42M |
| Other Procurement, Navy | N | FY26 Disc. Request | $7.36M |
| Other Procurement, Navy | N | FY26 Total | $7.36M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $49.9M | $16.3M | $6.42M | $7.36M | $7.36M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Ship Gun Systems Equipment. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O730
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O708
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O745
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
OPN BA1 Book · www.secnav.navy.mil