Outfitting
Budget figures
$863.8M discretionary + $23.4M one-time reconciliation. Discretionary change vs FY2025 enacted: +47.4%.
Two official figures, one label— reconciled below
Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →
FY26 Request · $887.3M TOA − $863.8M J-book line = 23.4M (887.30 − 863.85 = 23.45) — $23.4M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement
Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $512.0M |
| FY25 | $586.0M |
| FY26 | $887.3M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $614.7M | $707.4M | $512.0M | ||
| Enacted | – | $707.4M | $557.4M | $586.0M | |
| Request | – | – | $557.4M | $674.6M | $887.3M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $557.4M for FY2024; the PB2026 book reported $512.0M as actual total obligation authority — $45.3M below the request. 512.019 − 557.365 = -45.346 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Outfitting
Outfitting (OF) funds are used to acquire on board repair parts, other secondary items, equipage, recreation items, precommissioning crew support and general use consumables furnished to the shipbuilder or the fitting-out activity to fill the ship's initial allowances as defined by the baseline coordinated shipboard allowance list (COSAL). The program also budgets for contractor-furnished spares, a lead-time away from delivery. The program ensures operational readiness of ships undergoing new construction, conversion, service life extension program (SLEP), and nuclear refueling. It ensures these ships receive their full allowances of spare parts and equipment which are vitally required to support the shipboard maintenance process; ensures ships are equipped with operating space items (tools, test equipment, damage control), personnel safety and survivability commodities for successful completion of builder sea trials; supports shipboard maintenance and thereby achieving the OPNAV-directed supply readiness goals for material on board ship at delivery. SCN funding for the initial fill of allowance list items are limited to those items on the COSAL and authorized requirements through the Obligation Work Limiting Date (OWLD). While most outfitting funds are executed prior to ships' completion of fitting out dates, some outfitting funding may be required in the fiscal year following the scheduled Delivery Date. Post Delivery (PD) funding covers the repair of government-responsible items which were believed to have been complete to standard and/or operable at delivery, as well as funding to conduct tests and trials after delivery. It is essential to deliver to the Fleet complete ships, free from both contractor and government responsible deficiencies, capable of supporting the Navy's mission. The Post Shakedown Availability (PSA) is a shipyard availability assigned to commence after delivery and to be completed prior to the expiration of the SCN OWLD. It is during this time that acceptance and final contract trials deficiencies will be corrected. The purpose of the PSA is to correct new construction deficiencies found during the shakedown period; to correct contractor and government responsible deficiencies previously authorized; and accomplishment of other improvements or class items as authorized. Funding is used for corrections authorized by the ship's Program Manager as a result of builders' trials (pre-delivery), acceptance or underway trials, final contract trials, trial board items, and correction of production-related defects or deficiencies which develop during the post delivery period. Although the majority of post delivery funding occurs after ships' delivery dates, some funding is required prior to the delivery date in preparation for post delivery events. First Destination Transportation (FDT). FDT delivers material from a procurement source to the first point of use or storage which may be in the Continental United States or overseas. The procurement source may be a supplier outside of the Department of Defense (DoD) supply system or a DoD activity which fabricates new material. FDT also includes transportation from point of origin to point of use or storage when Navy-owned material or equipment is provided to a contractor incident to a Research and Development project or a system/equipment acquisition or modification.
Justification
Justification — Outfitting
The FY 2026 request for CVN 80 Outfitting includes $863,846 thousand of discretionary funding and $23,449 thousand of mandatory for a total of $887,295 thousand. The mandatory funds finance a portion of CVN 80 Outfitting. Further information for this reconciliation request is provided in Section 20002 (Shipbuilding) of the Reconciliation Exhibit.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Shipbuilding and Conversion, Navy | N | FY24 Actuals | $512.0M |
| Shipbuilding and Conversion, Navy | N | FY25 Enacted | $586.0M |
| Shipbuilding and Conversion, Navy | N | FY26 Disc. Request | $863.8M |
| Shipbuilding and Conversion, Navy | N | FY26 Reconciliation | $23.4M |
| Shipbuilding and Conversion, Navy | N | FY26 Total | $887.3M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $1.56B | $512.0M | $586.0M | $863.8M | $863.8M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Outfitting. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O588
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O579
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O604
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.