Joint Light Tactical Vehicle (5095) is a Navy procurement line funded in the Procurement, Marine Corps account.
What changed
-$242.2M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$262.1MP-1 TOA · PB2026
FY25 Enacted
$324.1MP-1 TOA · PB2026
FY26 Request
$81.9MP-1 TOA · PB2026
FY25→26 Change
-$242.2MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $262.1MFY25: $324.1MFY26: $81.9MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$262.1M
FY25$324.1M
FY26$81.9M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$332.3M$436.7M$262.1M
Enacted–$214.8M$232.5M$324.1M
Request––$232.5M$340.5M$81.9M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $232.5M for FY2024; the PB2026 book reported $262.1M as actual total obligation authority — $29.6M above the request. 262.15 − 232.50 = 29.65 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Joint Light Tactical Vehicle

Joint Light Tactical Vehicle (JLTV) supports light fleet modernization and Force Design as the next generation replacement for legacy High Mobility Multipurpose Wheeled Vehicle (HMMWV) and light tactical trailers. Funding supports the JLTV Family of Vehicles (FoV) to include the development and testing of Command, Control, Communications, Computers, & Intelligence (C4I) for integration with the JLTV. JLTV is a joint program between the U.S. Army and the U.S. Marine Corps, of which the U.S. Army is the lead service. The JLTV FoV is capable of performing multiple mission roles designed to provide protected, sustained, and networked mobility for personnel and payloads across the full Range of Military Operations. JLTV features include increased performance, protection, and payload over the current HMMWV fleet, reducing ownership costs by maximizing commonality, fuel efficiency, and reliability. The commonality of components, maintenance procedures, and training among vehicles are inherent in FoV solutions across mission variants to minimize total ownership costs. Unique service requirements have been minimized. The approved Full Rate Production (FRP) joint cost position incorporates validated requirements identified during the Multi-Service Operational Test and Evaluation as well as other mission critical requirements identified by the warfighter. JLTV achieved a successful FRP decision in June 2019. The last option to exercise on the Oshkosh Defense LLC contract was on 30 November 2023. The follow-on production contract was competitively awarded to AM General LLC on 09 Feb 2023 as a single award five-year requirements contract with five one-year options. Split procurements occurred through FY 2024 between the Oshkosh Defense LLC contract and the AM General LLC contract based on the approved acquisition strategy. In accordance with the Joint Program Office acquisition strategy, realized cost savings will be applied within the program to procure additional vehicles. FY2026 Qty reflected in the P-40 Budget Line-Item justification is incorrect. The correct quantity is zero as reflected on the P-5 Cost Analysis.

Justification

Justification — Joint Light Tactical Vehicle

FY 2026 Base Appropriation Request: $81.893M Joint Light Tactical Vehicle (JLTV) supports light fleet modernization and Force Design as the next generation replacement for legacy High Mobility Multipurpose Wheeled Vehicle (HMMWV) and light tactical trailers. $81.893M supports the procurement of JLTV companion trailers, mission kits, vehicle and trailer Total Package Fielding which consists of travel and labor for teams to conduct concurrent fielding events at Marine Corps bases and stations worldwide. Funding is also provided for First Destination Transportation; vehicle/trailer storage; Performance Verification Testing; System Technical Support; Contractor Systems Engineering Program Management; Engineering Change Orders; and retrofits necessary to incorporate changes identified during testing and through user feedback of fielded vehicles and trailers. Lastly, funding will cover post-production verification testing of the JLTV A2 family of vehicles to be manufactured by AM General LLC. The A2 includes a new engine (due to engine obsolescence) and associated systems to ensure operability, reliability, availability, and maintainability for the safety of the Fleet Marines. JLTV A2 Production Verification Testing is limited reliability and performance testing conducted yearly to verify consistent design and manufacturing; testing related to Engineering Change Proposals (ECP) to evaluate the successful integration on the vehicle and provide data for decision makers. Kits consist of over 75 different options to support mission essential equipment specific to each vehicle and variant. Kits may include, but are not limited to, armor kits required for force protection and survivability, tactical communications kits, which provide net-ready capabilities, and operational kits that complement base vehicle functionality to achieve requirements for tactical employment and mobility. These kits include density and schedule-based procurements. Density based kits are dependent on vehicle quantity and variant mix while schedule-based kits are fixed cost kits and are not tied to vehicle quantity or variant mix, therefore, are not included in the vehicle to kit unit cost calculation. Scheduled kits are estimated and procured outside of the production line and are based on specific Marine Corps requirements. Funding net decrease from FY 2025 to FY 2026 and reduction in total vehicles and trailers procurement quantities is a result of contract delays caused by a backlog in vehicle deliveries. FY 2026 impacts include reductions to associated kits, fielding and conclusion of First Article Testing (FAT) of the JLTV trailer manufactured by AM General (includes Performance Verification Testing (PVT); and Command, Control, Communications, Computers, and Intelligence, and Surveillance and Reconnaissance (C4ISR) Test of the JLTV A2. The FY 2026 request was reduced by $67.640 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Procurement, Marine CorpsNFY24 Actuals$262.1M
Procurement, Marine CorpsNFY25 Enacted$324.1M
Procurement, Marine CorpsNFY26 Disc. Request$81.9M
Procurement, Marine CorpsNFY26 Total$81.9M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$2.70B$262.1M$324.1M$81.9M$81.9M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

22 mentions from the Senate LDA disclosure database.

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

HONEYWELL INTERNATIONALLight|Vehicle2025matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

HONEYWELL INTERNATIONALLight|Vehicle2025matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

HONEYWELL INTERNATIONALLight|Vehicle2025matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

HONEYWELL INTERNATIONALLight|Vehicle2024matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

HONEYWELL INTERNATIONALLight|Vehicle2024matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

HONEYWELL INTERNATIONALLight|Vehicle2024matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

HONEYWELL INTERNATIONALLight|Vehicle2024matched 2+ title words

Issues related to FAA, FHA, and automotive technology programs Issues related to Corporate Average Fuel Economy and…

PHILLIPS 66Light|Vehicle2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

PHILLIPS 66Light|Vehicle2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

PHILLIPS 66Light|Vehicle2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

PHILLIPS 66Light|Vehicle2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

National Heritage Area Act, Inflation Reduction Act (H.R.5376), Advanced Technology Vehicles Manufacturing Loan…

Advanced Technology Vehicles Manufacturing Loan Program (ATVM), Domestic Manufacturing Conversion grants, Autonomous…

Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Domestic Manufacturing Conversion grants. Autonomous…

National Heritage Area Act, Inflation Reduction Act (H.R.5376), Advanced Technology Vehicles Manufacturing Loan…

National Heritage Area Act, Inflation Reduction Act (H.R.5376), Advanced Technology Vehicles Manufacturing Loan…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Joint Light Tactical Vehicle. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.