ASSAULT BREACHER VEHICLE (ABV)
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY25 | $5.68M |
| FY26 | $4.08M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $16.5M | $3.85M | – | ||
| Enacted | – | $3.85M | – | $5.68M | |
| Request | – | – | $0 | $5.68M | $4.08M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — ASSAULT BREACHER VEHICLE (ABV)
The Assault Breacher Vehicle (ABV) is a tracked combat engineer vehicle for the Army Armored Brigade Combat Team (ABCT) and Combat Engineer Company - Armor (CEC-A). It is designed to breach minefields and barrier obstacles to enable tanks and infantry of the ABCT to maintain pace in offensive combat operations. The Assault Breacher Vehicle provides crew protection and vehicle survivability equal to the M1A1 Abrams tank hull and has the speed and mobility to keep pace with the armor maneuver force. The Assault Breacher Vehicle hull is an overhauled M1A1 Abrams tank hull with modifications for its mission to support engineer companies within ABCTs. The ABV includes two Linear Demolition Charge Systems (modified Mine Clearing Line Charge (MICLC) systems); interchangeable Engineer Breaching System hardware consisting of a Full Width Mine Plow and a Combat Dozer Blade; a Lane Marking System to automatically mark a cleared path behind the Assault Breacher Vehicle; and an integrated day/night vision system. The production / acquisition strategy includes a partnership with Anniston Army Depot (ANAD) for the modification of the Abrams chassis for production of the Assault Breacher Vehicle (ABV). The Assault Breacher Vehicle (MOD) budget line funds the modifications of assault bridging equipment. It is used to procure hardware, materials, and hardware installation cost required to complete the modification. Modifications are performed to correct safety deficiencies, increase mission capabilities, extend the useful life, improve supportability, upgrade existing technology, increase efficiency, address obsolescence, improve readiness, and to meet new legal and regulatory requirements. By modifying existing equipment, the Army maintains a ready, supportable inventory of equipment that meets current requirements and regulations at a cost considerable below that of buying new equipment. Installation costs are included in the cost of each hardware kit. There are fifty-one (51) Assault Breacher Vehicles Harvested (ABV-H) from the United States Marine Corps (USMC). These vehicles are planned to undergo modifications to covert from USMC to the Army standard configuration. The Assault Breacher Vehicle Army Acquisition Objective (AAO) is 223.
Justification
Justification — ASSAULT BREACHER VEHICLE (ABV)
FY 2026 Base procurement dollars in the amount of $4.079 million supports the procurement of Assault Breacher Vehicle (ABV) government furnished equipment (GFE) required to modify quantity one (1) Assault Breacher Vehicle-Harvest (ABV-H) vehicle from the United States Marine Corps (USMC) to Army configuration, fielding to the unit, and program support. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY25 Enacted | $5.68M |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY26 Disc. Request | $4.08M |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY26 Total | $4.08M |
Exhibit P-1R
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY25 Enacted | $2.62M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $17.2M | $5.68M | $4.08M | $4.08M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not ASSAULT BREACHER VEHICLE (ABV). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · Q87
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O85
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O85
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
FY2026 Department of Defense Budget: Procurement Programs (P-1R) · comptroller.war.gov
Exhibit P-1R · P36
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1R_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
Procurement of Weapons and Tracked Combat Vehicles · www.asafm.army.mil
PDF page 35