What it is
Robotics and Applique Systems (4868W12002) is an Army procurement line funded in the Other Procurement, Army account.
What changed
-$67.0M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$65.1MP-1 TOA · PB2026
FY25 Enacted
$67.5MP-1 TOA · PB2026
FY26 Request
$509.0KP-1 TOA · PB2026
FY25→26 Change
-$67.0MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $65.1MFY25: $67.5MFY26: $509.0KFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$65.1M
FY25$67.5M
FY26$509.0K

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$119.2M$52.3M$65.1M
Enacted–$52.3M$68.9M$67.5M
Request––$68.9M$62.5M$509.0K

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $68.9M for FY2024; the PB2026 book reported $65.1M as actual total obligation authority — $3.77M below the request. 65.1 − 68.9 = -3.8 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Robotics and Applique Systems

The Enhanced Robotic Payloads (ERP) is a suite of payloads with open architecture to provide an increased level of standoff and situational awareness to respond to current and emergent Chemical, Biological, Radiological, Nuclear, and Explosives (CBRNe) and Explosive Ordinance Disposal (EOD) requirements. These payloads will integrate with the Man Transportable Robotic System (MTRS) Inc II and Common Robotic System - Heavy platforms. The suite of payloads includes Extended Range Mesh Networking (ERMN) and Pan/Tilt Imager (PTI). ERMN provides radio repeater nodes capable of extending the distance between the operator and platform, including a deployment and retrieval method. PTI enables the operator to see objects not normally visible to the naked eye. The approved Army Acquisition Objective (AAO) for the suite of systems that make up the ERP program is as follows: ERMN - 799 / PTI - 533. The Small Multipurpose Equipment Transport (S-MET) provides small units with a remote-controlled cargo/equipment transport and limited tactical resupply capability, increasing mission capabilities while reducing the individual Soldier load. The S-MET will be capable of carrying 2,500 pounds of equipment currently required to support Infantry and Engineer Platoons in the Infantry Brigade Combat Team (IBCT) for a 72-hour mission without resupply. It is also capable of generating 1-3KW of offload power, with an operational range of 20 miles in silent mode. S-MET will have open architectures, a remote control, support casualty evacuation, and integrate a number of Modular Mission Payloads (MMP) and technical insertions. The Army Acquisition Objective (AAO) is 2,819 across S-MET Inc I and S-MET Inc II. The Army Procurement Objective (APO) S-MET Inc I quantity is 624 under a Middle Tier of Acquisition Rapid Fielding (MTA-RF). The remaining AAO will be fulfilled through S-MET Inc I/II quantities. The Autonomous Transport Vehicle (ATV) funding line supports the Autonomous Transport Vehicle-System (ATV-S) effort that equips Tactical Wheeled Vehicles with autonomous behaviors. Additionally, the capability gives convoy commanders flexibility to leverage the six levels of automated driving that range from Level 0 (Fully Manual) to Level 5 (Fully Autonomous), and any combination therein to conduct convoy operations. Autonomous driving behaviors enables increased operational efficiency of tactical wheeled vehicles resulting in an increase of sustainment throughput while reducing Soldier exposure to hostile threats. The Soldier Borne Sensor (SBS) is a small unmanned aerial vehicle. It is a squad level system that provides situational awareness to 1 kilometer with a 20 minute endurance. The SBS provides the Squad with an organic "quick look" capability for near real-time video feeds of larger, complex, and restrictive environments. It reduces exposure to potential threats and enhances freedom of maneuver by providing actionable information to support decisions at the lowest echelon. The Army has approved requirements documents, namely the SBS Capabilities Production Document (CPD). The approved Army Acquisition Objective (AAO) for this program is 10,317. The First Unit Equipped (FUE) occurred in FY 2019. Funding in this project aligns with the Army's priorities in support of Army Transformation Initiative (ATI). Starting FY2026, funding realigned to I42011000/Soldier Borne Sensor agile funding.

Justification

Justification — Robotics and Applique Systems

R06305 Enhanced Robotic Payloads (ERP) has no funding request in FY 2026. R06806 Leader/Follower Applique (L/F) has no funding request in FY 2026. R12154 Squad Multipurpose Equipment Transport (S-MET) has no funding request in FY 2026. W20897 Autonomous Transport Vehicle (ATV): FY 2026 Base Procurement dollars in the amount of $0.509 million will fund program support. W63798 Soldier Borne Sensor (SBS) has no funding request in FY 2026. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L 110-151), these items are necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$65.1M
Other Procurement, ArmyAFY25 Enacted$67.5M
Other Procurement, ArmyAFY26 Disc. Request$509.0K
Other Procurement, ArmyAFY26 Total$509.0K

Exhibit P-1R

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$28.8M
Other Procurement, ArmyAFY25 Enacted$13.5M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$222.0M$65.1M$67.5M$509.0K$509.0K

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Robotics and Applique Systems. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.