What it is
All Terrain Cranes (4734R06701) is an Army procurement line funded in the Other Procurement, Army account.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$35.7MP-1 TOA · PB2026
FY25 Enacted
Not in the FY2026 J-books we ingested
FY26 Request
Not in the FY2026 J-books we ingested
FY25→26 Change
No comparison: endpoints unavailable or on different bases

No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2024. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

Insufficient trajectory data for sparkline (only FY24 available).

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

4 fiscal years of this program as published (FY2022–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
4 fiscal years of this program as published (FY2022–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY22FY23FY24FY25

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25
Actuals$112.8M$27.7M$35.7M
Enacted–$31.3M$27.7M–
Request––$27.7M$114.0K

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $27.7M for FY2024; the PB2026 book reported $35.7M as actual total obligation authority — $8.00M above the request. 35.7 − 27.7 = 8.0 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — All Terrain Cranes

In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Family of All Terrain Cranes (FOATC) Type II Heavy Crane (T2HC) - The Type II Heavy Crane (T2HC) with its 50 Ton lift capacity supports the National Defense Strategy (NDS) by providing critical lift missions including overhead lift, container operations, pile driving, protective barrier emplacement and removal, and port opening/operation capabilities which ensures common domains remain open and free. The T2HC supports Large Scale Combat Operation (LSCO) Gap 8 - Division Wet Gap Crossing Lack Bridging and C2 and LSCO Gap 11 - Brigade Combat Teams (BCTs) Lack Mobility and Lethality by enabling Multi Role Bridging Companies (MRBCs) with the ability to assemble, disassemble, and maintain bridges and bridging components for wet and dry gap crossings. The T2HC is capable of maintaining convoy speeds enabling it to keep up with advancing forces. The T2HC provides protective armor for the driver and operator. The Family of All Terrain Cranes also provides Construction Equipment Virtual Trainer upgrades and support. The Type II Army Acquisition Objective is 39. Family of All Terrain Cranes Type I - The FOATC Type I Crane supports the NDS by enabling Engineer Construction Companies, Engineer Companies Vertical Construction, and Clearance Companies with the ability to offload critical supplies such as weapons, ammunition, artillery pieces, fuel and water close to the battlefield to support fast moving operations which ensures common domains remain open and free. The Type I Crane provides critical lift missions including overhead lift, container operations, pile driving, protective barrier emplacement and removal, and port opening/operation capabilities, thereby supporting LSCO Gap 11 - BCTs Lack Mobility and Lethality. Type I is capable of maintaining convoy speeds enabling it to keep up with advancing forces. The Type I Army Acquisition Objective is 300. Military Ocean Terminal Concord (MOTCO) - Acquisition of new Ship to Shore (STS) container gantry cranes at Army's Military Ocean Terminal Concord (MOTCO) re-built Pier 2 provides critical power projection out-loading capability of containerized ammunition to meet required deployment timelines. MOTCO is the main Strategic Seaport for shipping ammunition to the Indo-Pacific Command (INDOPACOM) Area of Responsibility (AOR). The cranes provide the throughput capability for the safe and efficient transshipment of ammunition and explosives within the timelines necessary to meet operation plan requirements. Cranes directly support Cargo operations mission to safely provide ammunition terminal services to meet the Nation's objectives. This program is included in the OPA Budget Line Consolidation. All Terrain Cranes (R06701) was consolidated into the Construction Equipment (R02700) program.

Justification

Justification — All Terrain Cranes

This program is included in the OPA Budget Line Consolidation. All Terrain Cranes (R06701) was consolidated into the Construction Equipment (R02700) program. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$35.7M

Exhibit P-1R

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$26.5M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 Actuals
Program Element$347.3M$35.7M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not All Terrain Cranes. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification