GCSS-MC
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $4.14M |
| FY25 | $3.28M |
| FY26 | $3.30M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $0 | $1.66M | $4.14M | ||
| Enacted | – | $1.66M | $4.14M | $3.28M | |
| Request | – | – | $4.14M | $3.28M | $3.30M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — GCSS-MC
Global Combat Support System - Marine Corps/Logistics Chain Management (GCSS-MC/LCM) Family of Systems (FoS) serves as the primary technology enabler for the Marine Corps Logistics Modernization strategy. GCSS-MC/LCM provides the backbone for all logistics information required by Marine Forces and the Supporting Establishment. The core for GCSS-MC/LCM Increment 1 is a modern, commercial-off-the-shelf enterprise resource planning software (Oracle e-Business Suite). The Increment 1 design focused on enabling the warfighter to operate while deployed with reach back to Garrison from the battlefield. Increment 1 replaced 5 legacy supply and maintenance information technology systems and currently supports approximately 25,000 users worldwide. The focus of future functions will be enhancing capabilities in the areas of warehousing, distribution, logistics planning, decision support, depot maintenance, and integration with emerging technologies to improve asset visibility.
Justification
Justification — GCSS-MC
FY 2026 Base Appropriation Request: $3.303M - Increase of $0.021M from FY 2025 to FY 2026 is due to inflation and the continued need for technology refresh of hardware and software for the major logistics hubs in support of the sustainment of GCSS-MC/LCM Increment 1.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement, Marine Corps | N | FY24 Actuals | $4.14M |
| Procurement, Marine Corps | N | FY25 Enacted | $3.28M |
| Procurement, Marine Corps | N | FY26 Disc. Request | $3.30M |
| Procurement, Marine Corps | N | FY26 Total | $3.30M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $9.64M | $4.14M | $3.28M | $3.30M | $3.30M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not GCSS-MC. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O802
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O774
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O817
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.