Advanced Arresting Gear (AAG)
Other Procurement, Navy · 1810N
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
| Fiscal year | Amount |
|---|---|
| FY24 | $12.4M |
| FY25 | $2.24M |
| FY26 | $4.48M |
All series figures: P-1 TOA · PB2026
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $0 | $0 | $10.9M | $11.1M | $4.72M | $16.1M | $22.3M | $15.4M | $12.4M | ||
| Enacted | – | $0 | $10.9M | $11.1M | $4.72M | $16.1M | $22.3M | $13.5M | $11.9M | $2.24M | |
| Request | – | $10.9M | $11.1M | $4.72M | $16.1M | $22.3M | $22.7M | $11.9M | $2.24M | $4.48M |
blank = series not published for this year; – = absent from that edition.
Program lineage
This code is shared by more than one budget line. No predecessor or successor is assigned to this specific account or organization.
Description
Description — Advanced Arresting Gear (AAG)
This budget line item funds the procurement for Advanced Arresting Gear (AAG) life cycle support modifications and upgrades required aboard Ford Class Carriers, Jet Car Track Site (JCTS) and Runway Arrested Landing Site (RALS) systems. Modifications included in the budget support fatigue life, obsolescence and performance enhancements to ensure the system remains operational throughout the life of the program. AAG replaces Mark 7 arresting gear aboard Ford Class aircraft carriers and provides the U.S. Navy with the ability to recover existing and projected aircraft carrier based tail-hook equipped air vehicles well into the 21st century. AAG enhances operational capability, provides increased operational availability, reduces manning, maintenance and support costs. AAG is currently installed aboard CVN-78 as well as two land based test sites JCTS and RALS. Prior Years ($76.9M) funded under Aircraft Support Equipment (BLI 4213 and BLI 4216).
Justification
Justification — Advanced Arresting Gear (AAG)
FY 2026 Baseline funding procures and installs modification kits of the Cable Shock Absorber (CSA) Vent Valve Engineering Change Proposals (ECPs) and associated support. This ECP specifically addresses key operational degraders that are currently negatively impacting CVN-78 Operational Availability (Ao) and Reliability. FY 2026 Baseline funding also procures Support Equipment required for, and specific to, initial stand-up of AAG depot level repair capabilities for Ford Class ships. This includes AAG test fixtures, test stands and tool sets for component repair, with focus on capability for high failure components. In addition, FY 2026 Baseline funding procures support equipment required for, and specific to, AAG Software Support Activity (SSA) to make minor improvements and expand capabilities of the existing AAG lab. Stand-up of AAG Depot and SSA are required to establish capability and capacity to support multiple Ford class ships by 2028. The FY 2026 request was reduced by $.038 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." Notes for Installation Schedule: 1. Installations are subject to change with ship availability schedule updates. 2. The year-to-year unit installations costs will vary and can exceed the projected yearly inflation rate due to the hardware installation cost being dependent on quantity and location of the ship at the time of install or which site is being update, which CVN, and the ships baseline configuration. 3. Production lead time includes pre-installation checkout, kitting with other installation hardware and drawings, and time to deliver the hardware to the installation site. Non-Recurring Engineering (NRE) funding levels will fluctuate due to mix and complexity of system ECPs being written and verified in each year. All ECPs do not require the same level of NRE. Publications and Integrated Logistics Support also vary from year to year based on complexity of logistics elements and number of publications required to be updated for each individual ECP. Integrated Logistics Support and Production Engineering Support also varies from year to year based on complexity of logistics and engineering elements required for each individual ECP.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Navy | N | FY24 Actuals | $12.4M |
| Other Procurement, Navy | N | FY25 Enacted | $2.24M |
| Other Procurement, Navy | N | FY26 Disc. Request | $4.48M |
| Other Procurement, Navy | N | FY26 Total | $4.48M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $80.2M | $12.4M | $2.24M | $4.48M | $4.48M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.
| Recipient | PIID | Confidence |
|---|---|---|
| GENERAL ATOMICS | N0001921F0045 | medium |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
This code is shared by more than one budget line. No lobbying matches are assigned to this specific account or organization.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Advanced Arresting Gear (AAG). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O723
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2018 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O761
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_P-1_Procurement.xlsx.
FY2019 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O736
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_P-1_Procurement.xlsx.
FY2020 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O748
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_P-1_Procurement.xlsx.
FY2021 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O749
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_P-1_Procurement.xlsx.
FY2022 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O721
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_P-1_Procurement.xlsx.
FY2023 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O713
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O700
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O737
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
OPN BA1 Book · www.secnav.navy.mil