Repair and Test Equipment
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $52.1M |
| FY25 | $64.3M |
| FY26 | $61.3M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $33.6M | $50.3M | $52.1M | ||
| Enacted | – | $50.3M | $53.6M | $64.3M | |
| Request | – | – | $53.6M | $71.0M | $61.3M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $53.6M for FY2024; the PB2026 book reported $52.1M as actual total obligation authority — $1.50M below the request. 52.1 − 53.6 = -1.5 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Repair and Test Equipment
Repair and Test Equipment Budget Line Item provides repair and test equipment consisting of more than 200 different items required to support the operation and maintenance of Marine Corps ground based weapon systems and major end items, including Marine Air-Ground Task Force (MAGTF) Logistics Support Systems (MLS2), a key CMC Force Design program enabling readiness while conducting Littoral Operations in Contested Environments (LOCE). These capabilities will enable ground, ordinance, and communication maintainers to perform organic maintenance activities on various Marine Corps platforms across widely dispersed locations that will increase the ability to sustain operational readiness levels. This portfolio also includes repair and test equipment supporting air defense systems, C2 in a degraded environment system, close combat lethality systems, and information warfare. It includes items such as tool kits, shop sets, manual and automatic test equipment, and metrology and calibration equipment. The following acquisition programs fall under the repair and test equipment budget line: General Purpose Tools and Test Systems (GPT&TS); Automatic Test Systems (ATS), Calibration and Maintenance Program (CAMP), Additive Manufacturing, Conditioned Based Maintenance (CBM+), and MLS2.
Justification
Justification — Repair and Test Equipment
FY 2026 Baseline Appropriation Request: $61.264M MAGTF Logistics Support Systems (MLS2) $11.067M: The decrease of $1.893M from FY 2025 to FY 2026 reflects the procurement schedule of Augmented Reality Virtual Enhancement assets and Electronic Maintenance Support Systems (EMSS) hardware kits. MLS2 enables increased maintenance readiness across a distributed Fleet Marine Force in order to increase operational readiness. Funding will continue to procure EMSS to meet the program's Authorized Acquisition Objective (AAO), as well as to procure items such as Commercial Off-The-Shelf (COTS) equipment, operating software that comprises the EMSS, and Application Program Sets to support EMSS modification of systems. EMSS will emulate and/or interface with test equipment and enables capabilities such as storing and viewing Interactive Electronic Technical Manuals (IETMs), Computer Based Training (CBT), and other maintenance applications. EMSS also has the capability to connect to the Marine Corps Enterprise Network (MCEN) and access defense business systems such as Global Combat Support System - Marine Corps (GCSS-MC) in order to facilitate and process maintenance and supply transactions thereby improving operational readiness. General Purpose Tools and Test Systems (GPT&TS) $27.472M: The increase of $7.629M from FY 2025 to FY 2026 supports multiple procurements of mechanical, electrical, tool kits and fielding support for GPT&TS equipment. Two major drivers of this increase are the procurement of Microwave Communication and Radar Test Sets to support new capabilities associated with the next generation Wideband Satellite Communications as well as various GPT&TS equipment modernization efforts that directly impact maintenance activities. The GPT&TS budget procures a wide variety of tool kits (portable, vehicle and trailer mounted, and sheltered), handheld electronic test equipment and mechanical test equipment (handheld to building mounted) that are required to support the field maintenance effort of USMC ground equipment and weapon systems located within USMC expeditionary battalions and squadrons. Automatic Test Systems (ATS) $11.491M: The increase of $0.798M from FY 2025 to FY 2026 supports the procurement of Software Defined and Crypto-Compliant Hand-Held Radio Test Sets (HHRTS) to support Force Design. Funding will support ATS modernization efforts associated with the procurement of automatic test equipment for five distinct programs within the ATS portfolio. ATS consists of both hardware and software components that provides mobile and automatic testing on Principle End Items (PEI), Line Replaceable Units (LRU), and Shop Repairable Units (SRU), in order to improve weapon system readiness, provide an organic maintenance solution, and decrease life cycle costs of supported weapon systems. ATS efforts include programs such as General Purpose Automatic Test System capability enhancements to test electro-optics platforms, and Hand-Held Radio Test Set (HHRTS) that provides a portable radio tester for organizational maintenance to test existing and future software defined ground tactical radio systems. All modernizations will be documented through the Engineer Change Proposal (ECP) process which will enhance organic maintenance capabilities and mitigate against obsolescence. Calibration and Maintenance Program (CAMP) $2.793M: The increase of $2.656M from FY 2025 to FY 2026 supports procurement of various calibration equipment (standards). Funding will procure various calibration equipment (standards) which must be replaced/upgraded over time in order to support and calibrate all the new test equipment used by various maintenance personnel working on Marine Corps ground military equipment. Additive Manufacturing $6.121M: The decrease of $6.021M from FY 2025 to FY 2026 is due to the procurement schedule for the Expeditionary Fabrication Equipment (XFAB) and Tactical Fabrication (TACFAB) systems. FY 2026 funding will provide direct procurement of advanced manufacturing program of record systems to support maintaining and creating parts to meet ground warfare community requirements. Funding will continue to procure XFAB systems, to include fulfilling the objective requirement of expeditionary metal 3D printers. The XFAB and Tactical Fabrication 3D printer systems require continued Field Service Representative (FSR) service for the volume of cyber related tasks, update and services to ensure the expeditionary Advanced Manufacturing systems maintain operational readiness. The FY26 funding will also field the initial systems to replace the aging legacy Shop Equipment Machine Shop (SEMS) deployable machine shop with the modern metal subtractive and additive manufacturing capable Advanced Integrated Mobile Machine Shop (AIMMS) system. Conditioned Based Maintenance (CBM+) $2.320M: The decrease of $6.195M from FY 2025 to FY 2026 is due to the procurement schedule of Data loggers and Multi-Function Trip Tool. FY 2026 funding will support the procurement schedule of Data Loggers, Multi-Function Trip Tool (formerly known as Mobile Trip Tools), network equipment, cloud computing, data analytics interfaces, and fielding support. CBM+ enables increased maintenance readiness through predictive maintenance actions across a distributed Fleet Marine Force conducting Expeditionary Advanced Base Operations (EABO) and littoral operations in a contested environment to increase operational readiness and lethality. CBM+ will interface with GCSS-MC to enhance supply chain management reducing the risk of supply chain interruptions. It is a maintenance strategy that seeks to collect, transmit, analyze, and act on maintenance data from platforms such as vehicles, aircraft, or generators using electronic data logging devices and artificial intelligence/machine learning (AI/ML) software. The FY 2026 request was reduced by $2.989 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement, Marine Corps | N | FY24 Actuals | $52.1M |
| Procurement, Marine Corps | N | FY25 Enacted | $64.3M |
| Procurement, Marine Corps | N | FY26 Disc. Request | $61.3M |
| Procurement, Marine Corps | N | FY26 Total | $61.3M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $476.2M | $52.1M | $64.3M | $61.3M | $61.3M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Repair and Test Equipment. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O796
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O768
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O811
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.