Skip to content
Fiscal Receipts

M119 Modifications

ArmyProcurementReconciledBLI3640GC0401
What it is
M119 Modifications (3640GC0401) is an Army procurement line funded in the Procurement of Weapons and Tracked Combat Vehicles, Army account.
What changed
-$8.18M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$13.1MP-1 TOA · PB2026
FY25 Enacted
$12.8MP-1 TOA · PB2026
FY26 Request
$4.64MP-1 TOA · PB2026
FY25→26 Change
-$8.18MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $13.1MFY25: $12.8MFY26: $4.64MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$13.1M
FY25$12.8M
FY26$4.64M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$0$22.4M$13.1M
Enacted–$2.26M$13.1M$12.8M
Request––$13.1M$12.8M$4.64M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — M119 Modifications

The M119A3 Towed Howitzer provides direct fire support for the Infantry Brigade Combat Teams (IBCTs). Funding in the M119A3 Modifications budget supports the application of modernization system enhancements required to ensure continued operational availability including the integration of digital fire control components required to execute secure digital fire missions and maintain interoperability on the battlefield. Modifications include the upgrade of the systems legacy radio to a current Software Defined Radio to support new encryption protocols, upgrade of the systems Fire Control Computer (FCC) to support migration to a new operating system, and integration of Assured Position, Navigation and Timing (A-PNT) (aka: M-Code) compliance initiatives. Modernization upgrades enhance crew survivability as direct supporting rapid emplacement, conducting of fire mission, and displacement. Funding in this program also supports the installation and retrofit of modification kits to the M119A3 Howitzer.

Justification

Justification — M119 Modifications

FY 2026 funding in the amount of $4.642 million continues the integration of Assured Position, Navigation and Timing (APNT) compliance initiatives onto the M119 howitzer platform; continues the retrofit of previously procured hardware and software modifications; and other modernization efforts to the Digital Fire Control System (DFCS). APNT compliance initiatives will provide the M119A3 howitzer with the continued ability to conduct near precision fires in a Global Positioning System (GPS) contested environment while maintaining current operational tempo. Modernization efforts to the Digital Fire Control System (DFCS) will enable continued system readiness. Net funding decrease of $8.181 million from FY 2025 to FY 2026 reflects the completion of the procurement of a new Fire Control Computer to support an upgraded operating system and software. "In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities."

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY24 Actuals$13.1M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY25 Enacted$12.8M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY26 Disc. Request$4.64M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY26 Total$4.64M

Exhibit P-1R

AccountOrgTypeAmount
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY24 Actuals$7.05M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$414.1M$13.1M$12.8M$4.64M$4.64M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not M119 Modifications. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.