Printed from https://fiscalreceipts.com/program/3542MA8890/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Tactical Bridge, Float-Ribbon
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $82.2M
- FY26
- $69.9M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $74.2M | – | $82.2M | ||
| Enacted | – | $0 | $82.2M | $97.2M | |
| Request | – | – | $82.2M | $97.2M | $69.9M |
blank = series not published for this year; – = absent from that edition.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Tactical Bridge, Float-Ribbon
The Tactical Bridge Float-Ribbon line supports the Army's Multi-Role Bridging Companies (MRBCs). One Tactical Float Ribbon Bridge System consists of Improved Ribbon Bridge (IRB) bays (30 Interior and 12 Ramps), 14 Bridge Erection Boats (BEBs), 14 Bridge Adapter Pallets (BAPs), and 56 Common Bridge Transporters (CBTs). These systems are required to transport, launch, erect, and retrieve up to 210 meters of floating bridge. The IRB has a Military Load Classification (MLC) 96 wheeled (normal) and 110 (caution)/MLC 70 tracked (normal) and 120 (caution) and is used to transport weapon systems, troops, and supplies over water when permanent bridges are not available. The M15 BAP is used to adapt the CBT for transport of the IRB and M30 BEB. This capability will support the Joint Force Commander's ability to employ and sustain forces throughout the global battlespace. The Propulsion, Bridge Erection Boat (BEB) Army Acquisition Objective (AAO) is 491. The Transporter, Common Bridge Transporter (CBT) Army Acquisition Objective (AAO) is 1903. IRB Interior Bays AAO: 1128 IRB Ramp Bays AAO: 454
Justification
Justification — Tactical Bridge, Float-Ribbon
FY 2026 Base procurement dollars of $69.863 million will be used to procure a quantity of 104 Common Bridge Transporters (CBT). M27200 has no funding request in FY 2026. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.
Budget Line Items(workbook-cited)
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Army | A | FY24 Actuals | $82.2M |
| Other Procurement, Army | A | FY25 Enacted | $97.2M |
| Other Procurement, Army | A | FY26 Disc. Request | $69.9M |
| Other Procurement, Army | A | FY26 Total | $69.9M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $979.0M | $82.2M | $97.2M | $69.9M | $69.9M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →