Printed from https://fiscalreceipts.com/program/353190/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Massive Ordnance Penetrator (MOP)
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $1.25M
- FY26
- $6.81M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $15.5M | $1.53M | $1.25M | ||
| Enacted | – | $19.7M | $14.1M | $8.57M | |
| Request | – | – | $14.1M | $8.57M | $6.81M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $14.1M for FY2024; the PB2026 book reports $1.25M actually spent — $12.8M below the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Massive Ordnance Penetrator (MOP)
Massive Ordnance Penetrator (MOP) is a 30,000 lb class precision-guided penetrator designed to defeat hard and deeply buried targets. Funding is for non-recurring engineering, analysis and studies, integration, test, qualification, production readiness and operational readiness of engineering change proposals to resolve safety, reliability or other operational deficiencies, decrease weapon system cost, preserve future production capabilities and capacities, and meet Congressional, National Agency and Defense Department mandates. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. For example through studies, bridge buys, life of type buys, supplier/parts replacement, to include electronic components used commercially and in short supply, energetics, and qualification activities to preserve future production capabilities and capacities. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding for this exhibit is contained in PE 0208030F, project 353190.
Justification
Justification — Massive Ordnance Penetrator (MOP)
FY 2026 funding includes any Diminishing Manufacturing Source and Material Shortages (DMSMS) to include MOP's Actuator Controller Electronic Control Unit (ECU), joint mission computer, SABR-Y (GPS receiver), Inertial Measurement Unit (IMU) power supply card, Fuze Interface Electronics (FIE) Box Assembly, Electromagnetic Interface (EMI) Filer Box Assembly, and procurement of MOP assets for warheads, guidance kits, fuzes, and associated support equipment.
Budget Line Items(workbook-cited)
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement of Ammunition, Air Force | F | FY24 Actuals | $1.25M |
| Procurement of Ammunition, Air Force | F | FY25 Enacted | $8.57M |
| Procurement of Ammunition, Air Force | F | FY26 Disc. Request | $6.81M |
| Procurement of Ammunition, Air Force | F | FY26 Total | $6.81M |
Budget Details(R-2/P-40 facts)
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $1.25M | $8.57M | $6.81M | $6.81M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →