AProcurementPartial Reconciliation3270GC0050
What it is
Production Base Support (WOCV-WTCV) — a procurement program run by Army.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$115.0M
FY25 Total
FY26 Request
$105.0M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $115.0MFY26: $105.0MFY24FY26
FY24
$115.0M
FY26
$105.0M
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$118.5M$228.2M$115.0M
Enacted$225.2M$115.0M$109.6M
Request$115.0M$135.6M$105.0M

blank = series not published for this year; – = absent from that edition.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description Production Base Support (WOCV-WTCV)

This program provides funding to establish, modernize, expand, or replace Government owned industrial facilities and equipment used in production and production testing of Weapons and Tracked Combat Vehicles (WTCV) and their components. In some exceptional instances, this program also provides funding to establish, rehabilitate, modernize, convert, or expand privately owned plants to support current production and production testing. The program also provides for the preserving, storing, and disposing for facilities and equipment that are either not required for current active production or are not needed by the Army. Production Base Support occurs at the Joint Systems Manufacturing Center (JSMC) in Lima, OH, the Watervliet Arsenal (WVA) in Watervliet, NY, the Joint Manufacturing and Technology Center (JMTC) at Rock Island Arsenal (RIA), IL, Selfridge Air National Guard Base (SANG) located in Harrison Township, MI, and BAE Systems Vehicle Upgrade and Overhaul Center (VUOC) located in Sterling Heights, MI, Anniston, AL, and York, PA. This program also provides funding for the Arsenal 5-Year Plan(s) for maintaining and modernizing the Industrial Base. This program also provides funding to the Army Test and Evaluation Command (ATEC) to establish, modernize, expand, or replace test facilities used in production testing of Weapons and Tracked Combat Vehicles and their components. It sustains Army production test capabilities through upgrade and replacement of instrumentation and equipment that is technologically and/or economically obsolete. Modernization of test instrumentation and equipment provides increased automation and efficiencies, improved data quality and quantity and cost avoidance to Army Program Managers. Programmed funding will be used to upgrade or replace production test instrumentation and equipment at Aberdeen Test Center (ATC), Aberdeen Proving Ground, MD; White Sands Test Center (WSTC), White Sands Missile Range, NM, and Yuma Test Center (YTC), Yuma Proving Ground, AZ.

Justification

Justification Production Base Support (WOCV-WTCV)

FY 2026 Base procurement dollars in the amount of $104.993 million supports Army Production Base Support activities at the Joint Systems Manufacturing Center (JSMC) in Lima, OH; Watervliet Arsenal (WVA) in Watervliet, NY; BAE Systems Vehicle Upgrade and Overhaul Center (VUOC) located in Sterling Heights, MI, Anniston, AL, and York, PA; and the Army Test and Evaluation Command (ATEC). This funding line is shared amongst multiple programs (Project Manager (PM) Abrams, PM Mounted Armored Vehicles (MAV), and ATEC). The significant investment in Joint Systems Manufacturing Center (JSMC), Watervliet Arsenal (WVA), BAE Systems Vehicle Upgrade and Overhaul Center (VUOC), and Army Test and Evaluation Command (ATEC) is due to aging infrastructure and the increased organic industrial base capabilities, the manufacturing of equipment, and facility improvements. The objective is to advance industrial base capabilities to implement risk mitigation strategies that ensure production capacities meet required aggregate demand. The activities of the Army Production Base Support are as follows: Production Base Support activities: - Joint Systems Manufacturing Center (JSMC) - Lima, OH: $70.024 million supports organic industrial base upgrades and improvement at JSMC to optimize Abrams production. Major efforts include replacement of end-of-life equipment and production infrastructure used in the manufacture of Abrams tanks, modernization of equipment and infrastructure used, and upgrade of real property at JSMC. - Watervliet Arsenal (WVA) - Watervliet, NY: $21.014 million supports organic industrial base upgrades and improvements at WVA. Major efforts include the equipment and conversion from hexavalent chromium plating to trivalent chromium plating. - BAE Systems Vehicle Upgrade and Overhaul Center (VUOC) - Sterling Heights, MI; Anniston, AL; York, PA: $10.080 million supports the industrial base by investing into production line automation that supports current/future throughput requirements, maintains weld quality, decreases Hours per Vehicle (HPV), and reduces defects/discontinuities and rework. Army Test and Evaluation Command (ATEC): $3.875 million supports: - Aberdeen Test Center (ATC) continued modernization of fire control instrumentation required to assess weapon system fire control performance on a wide range of test items. Aberdeen Test Center will continue replacing and upgrading weapon, sight, and target scoring high-definition video cameras, recorders, digital video processing systems, fiber optic converters, and telemetry systems. Replacement equipment is scheduled to address obsolescence issues, software compatibility gaps, and deterioration of existing hardware while ensuring test equipment maintains pace with technological advances of test items to preclude lack of test support. Aberdeen Test Center will also procure new instrumentation that will allow Electromagnetic Interference (EMI) testing of current and future military platforms, including autonomous vehicles. - White Sands Test Center (WSTC), Army Test and Evaluation Command (ATEC) will continue to maintain and upgrade existing equipment and instrumentation for the developing and evolving White Sands Missile Range (WSMR) to include directed energy, High-Power Microwave (HPM), Electromagnetic Pulse (EMP) and lightning effects test simulators. These items include sensors, oscilloscopes, fiber optic links, vacuum systems, cryogenic superconducting magnets, waveguides, antennas, cathodes, insulators, and various cabling and subassemblies. These efforts will help the White Sands Test Center meet regulatory, customer, and/or evolving mission requirements. - Yuma Test Center (YTC) will acquire upgrades sensors, sensor positioning equipment, control hardware, signal conditioners, and other data acquisition equipment and software to modernize and improve accuracy and efficiency of ballistics data acquisition.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY24 Actuals$115.0M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY25 Enacted$109.6M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY26 Disc. Request$105.0M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY26 Total$105.0M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$758.3M$115.0M$109.6M$105.0M$105.0M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.