Skip to content
Fiscal Receipts

CH-47 Cargo Helicopter Mods (MYP)

ArmyProcurementReconciledBLI3264AA0252
What it is
CH-47 Cargo Helicopter Mods (MYP) (3264AA0252) is an Army procurement line funded in the Aircraft Procurement, Army account.
What changed
-$21.2M FY25→26 P-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 7 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$50.7MP-1 TOA · PB2026
FY25 Enacted
$38.9MP-1 TOA · PB2026
FY26 Request
$17.7MP-1 TOA · PB2026
FY25→26 Change
-$21.2MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $50.7MFY25: $38.9MFY26: $17.7MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$50.7M
FY25$38.9M
FY26$17.7M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$21.9M$49.4M$50.7M
Enacted–$49.9M$20.7M$38.9M
Request––$20.7M$15.8M$17.7M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $20.7M for FY2024; the PB2026 book reported $50.7M as actual total obligation authority — $30.0M above the request. 50.7 − 20.7 = 30.0 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — CH-47 Cargo Helicopter Mods (MYP)

The CH-47F Chinook, the Army's only heavy lift helicopter, is the enduring platform that supports the Transformation in Contact (TiC) and Continuous Transformation objectives. The CH-47F twin-turbine, tandem-rotor, heavy lift transport helicopter is a critical component of the TiC to successfully conduct Multi-Domain Operations (MDO) as part of an integrated joint force. The significant modifications to the CH-47F include: Improving cyber security, communication security (COMSEC), aircraft handling qualities through iterative development, integration, testing and fielding to the Common Avionics Architecture System (CAAS) and the Digital Automatic Flight Control System (DAFCS); integrating and fielding capability to the remaining fleet with Cargo Platform Health Environment (CPHE) and Improved Vibration Control System (IVCS); maintaining currency and certification of fleet Training Aids Devices Simulators and Simulations (TADSS); refreshing avionics software to address cyber security threats and safety improvements; replacing obsolete parts critical for aircraft operation and unavailable hardware and equipment. The modifications support requirements driven by rapid changes in the commercial electronics hardware market, heavy industry market, evolving cyber security threats, military interoperability, and civil airspace navigation. These modifications require software systems updates, testing, integration, training, and logistics support. The funding priorities are developing, testing, and fielding improvements in cyber security, aircraft handling qualities, obsolescence, CPHE, COMSEC, IVCS, Assured Positioning Navigation Timing (APNT), improved multi-core processors, and expansion of the flexibility provided by the CAAS Modular Open Systems Approach (MOSA) to maintain capability as well as insert new capabilities.

Justification

Justification — CH-47 Cargo Helicopter Mods (MYP)

FY 2026 procurement dollars in the amount of $17.709 million supports avionics updates and improvements fielded across the fleet. Funding procures critical avionics updates and safety improvements to maintain the CH-47F Avionics and Software systems, insert technologies such as CPHE, IVCS, COMSEC improvements (M code), cyber security improvements, APNT and the future common enterprise cockpit architecture. These will address obsolescence, needed tech insertions and updates, address improvements in aircraft handling qualities, MOSA, and provide integration opportunities for common equipment providers to insert technology improvements thru development, integration, testing, and fielding by way of the CAAS and DAFCS MOSA interfaces. The FY 2026 request was reduced by $0.215 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." In accordance with Section 1815 of the 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the Active and Reserve Components of Armed Forces for homeland and defense missions, domestic emergency responses and providing military support to civil authorities.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, ArmyAFY24 Actuals$50.7M
Aircraft Procurement, ArmyAFY25 Enacted$38.9M
Aircraft Procurement, ArmyAFY26 Disc. Request$17.7M
Aircraft Procurement, ArmyAFY26 Total$17.7M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$11.2B$50.7M$38.9M$17.7M$17.7M

Follow the dollar

No follow-the-dollar view — none of this program's high-confidence awards records a positive obligation at any place of performance (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
THE BOEING COMPANYW58RGZ18D0124high
HONEYWELL INTERNATIONAL INC.W58RGZ14C0021medium
THE BOEING COMPANYW58RGZ13C0002medium
THE BOEING COMPANYW58RGZ13C0114medium
THE BOEING COMPANYW58RGZ17C0059medium
THE BOEING COMPANYW58RGZ18F0050medium
TYONEK AIRCRAFT OVERHAUL, LLCW58RGZ25P0008medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not CH-47 Cargo Helicopter Mods (MYP). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.