Printed from https://fiscalreceipts.com/program/3181GZ1500/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Sniper Rifles Modifications
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
Insufficient trajectory data for sparkline (only FY26 available).
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $80.0K | $143.0K | – | ||
| Enacted | – | $0 | – | – | |
| Request | – | – | $0 | – | $19.0K |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Sniper Rifles Modifications
BLI 3181GZ1500 / Sniper Rifles Modifications is a new start in FY 2026. The Sniper Rifles Modifications program supports the Army Modernization priorities (Build a More Lethal Force) through enhancement of Joint Lethality in contested environments by minimizing and eliminating erosion of close combat capability relative to peer competitors in complex terrain as outlined in the National Defense Strategy (NDS). The program conducts investigative engineering studies, procure modifications or conversions of sniper weapons and related system components to include gages/gage kits, Advanced Sniper Accessory Kit (ASAK) items, M151 Spotting Scope System, Tactical Tripod Kit (TTK) components, sniper optics, laser range finders, and ballistic compensating systems. Initial buys of items to support or meet operational needs and lighten sniper load. It includes the procurement of rifle scope optics, spotting scopes, an accompanying Accessory Interface Mounting kit (AIM), Improved Sniper Tripod, improved capabilities including an enhanced common reticle pattern and special tool kit. This program also provides improved ancillary equipment such as intelligent rails, ballistic chronographs, Ballistic Weather Meter (BWM), Sniper Scope Covert Cap, Weapon Tripod Cradle, Sniper Data Board, improved Sniper Buttstock, Sniper Tool Kit, Sniper Accessory Mount, improved Upper Receiver Groups and/or recalibered barrels, fire controls, enhanced suppressors, other components, and support costs. The current Army fleet of sniper weapons, consisting of the M110 Semi-Automatic Sniper System (SASS), the M2010 Enhanced Sniper Rifle (ESR), the M107 Semi-Automatic Long Range Sniper Rifle (LRSR), the MK22 Precision Sniper Rifle (PSR) and the M110A1 Squad Designated Marksman Rifle (SDMR), require continuous upgrades to the weapon, components, and/or ancillary equipment. Sniper upgrades seek to enhance sniper mission capability, effectiveness, and survivability by overmatching continuously evolving threats and extending the sniper's influence through emerging technologies in perfecting ballistics with exacting hardware and precise calculations, reducing sniper team burden through decreased weight and enhanced ergonomics, portability, signature reduction, faster more precise target reconnaissance, surveillance, and target acquisition (RSTA) and precision aiming with automated ballistic prediction systems. Upgrades also support sniper/spotter mission collaboration with information sharing of targets and better situational awareness.
Justification
Justification — Sniper Rifles Modifications
FY 2026 base procurement dollars in the amount of $0.019 million supports Sniper accessories, modifications, and conversions. In accordance with Section 1815 of the FY 2008 National Defense Act, (P.L.110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY26 Disc. Request | $19.0K |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY26 Total | $19.0K |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY26 Base | FY26 Request |
|---|---|---|---|
| Program Element | $51.4M | $19.0K | $19.0K |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Sniper Rifles Modifications. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · W115
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O114
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O113
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
Procurement of Weapons and Tracked Combat Vehicles · www.asafm.army.mil
PDF page 205