Skip to content
Fiscal Receipts

MK-48 Torpedo

NavyProcurementReconciledBLI3117
Watch this program

Published budget signals for this program, with links to receipts.

Updates appear after a data refresh and publication. No fixed update schedule is available.

Paste the RSS address into a feed reader. No Fiscal Receipts account is required.

RSSAtom

What it is
MK-48 Torpedo (3117) is a Navy procurement line funded in the Weapons Procurement, Navy account.
What changed
-$83.7M FY25→26 P-1 TOA · PB2026
Who gets it
SCIENCE APPLICATIONS INTERNATIONAL leads 2 contractor families sharing $1.59B in high-confidence matched awards.

Budget figures

FY24 Actuals
$296.3MP-1 TOA · PB2026
FY25 Enacted
$352.0MP-1 TOA · PB2026
FY26 Request
$268.3MP-1 TOA · PB2026
97.4% reconciliation

$7.08M discretionary + $261.2M one-time reconciliation. Discretionary change vs FY2025 enacted: -98.0%.

FY25→26 Change
-$83.7MP-1 TOA · PB2026

Two official figures, one label— reconciled below

Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →

FY26 Request · $268.3M TOA − $7.08M J-book line = 261.2M (268.3 − 7.1 = 261.2) — $261.2M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement

Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $296.3MFY25: $352.0MFY26: $268.3MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$296.3M
FY25$352.0M
FY26$268.3M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$131.0M$151.1M$296.3M
Enacted–$151.1M$308.5M$352.0M
Request––$308.5M$333.1M$268.3M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $308.5M for FY2024; the PB2026 book reported $296.3M as actual total obligation authority — $12.2M below the request. 296.35 − 308.50 = -12.15 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — MK-48 Torpedo

The MK 48 Heavyweight Torpedo is the U.S. Navy's submarine launched Anti-Submarine Warfare (ASW) and primary Anti-Surface Warfare (ASuW) weapon. The Heavyweight Torpedo provides the submarine force with an effective weapon against threat submarines and surface combatants to assist in achieving Sea Control and neutralizing or destroying threats to high value vessels. Torpedoes are the only proven weapon system that provides Navy control from the seabed to sea surface. Heavyweight AUR procurement is required to increase Warshot inventory to address increased Naval Munitions Requirement Process (NMRP) requirements gap. [P5 / G5001 - MK 48 MOD 7 Hardware]: Funding under this cost code supports the award and execution of two competitive contracts for procurement of the MK 48 MOD 7 Torpedo Guidance and Control & Warhead Electronic Systems (WES) Sections, and Afterbody Tail Cone & Fuel Tank Sections. Items in this Cost Code include: - Engineering Services / Engineering Change Proposals (ECPs) funds (1) studies (2) plans (3) design changes, and (4) implementation of design changes by the contractor(s), primarily due to obsolescence that occurs during the contract performance. - Non-recurring Engineering (NRE) funding to resolve production issues including obsolescence. NRE funds (1) base contract year technology refresh due to obsolescence issues (2) production of Proof of Manufacturing (POM) units (3) first article testing (4) tooling (5) test equipment (6) procurement of technical data package updates, and (7) start-up costs for production contractors. - Installation funding for government installation and integration of MK 48 MOD 7 Guidance and Control and Afterbody Tail Cone Sections assembled into an All-Up Round (AUR). Installation costs match procurement delivery timelines. - Diminishing Manufacturing Sources (DMS) funds are provided to address obsolescence issues in the Guidance and Control (G&C)/WES and Afterbody/Tail Cone/Fuel Tank sections during the production cycle. The contractors will be required to procure and deliver DMS material for these obsolete components. [P5 / G5002 - MK 48 TI-1 Hardware]: Funding under this cost code supports the award and execution of two contracts for procurement of a new MK 48 MOD 8 Torpedo Guidance and Control & Warhead Electronic Systems (WES) Section, and Afterbody Tail Cone and Fuel Tank Sections. MOD 8 supplies a new Guidance and Control (G&C) section including new Sonar Assembly (higher density array, transmitter, receiver), Guidance and Control Box (GCB), Tuning Box, and an Ethernet device switch. In addition, the MOD 8 will also feature a new Warhead Electronics System (WES) to support improved fuzing and the Improved Post Launch Communications System (IPLCS), which will replace the existing copper guidance wire with fiber optics. Improvements are needed in the presence of advanced countermeasures, shallow water, low Doppler targets, Very Shallow Water (VSW), and to improve fuzing and Anti-Surface Warfare (ASuW) performance. The MOD 8 G&C Section allows full fleet introduction of the APB 6 and to meet requirements of the MK 48 Improvements CDD (857-97-12). Other Items in this Cost Code include: - Engineering services / Engineering Change Proposals (ECPs) funds (1)studies, (2)plans, (3)design changes, and (4)implementation of design changes by the contractor(s), primarily due to obsolescence that occurs during the contract performance. - Non-recurring Engineering (NRE) funding to resolve production issues including obsolescence. NRE funds (1) base contract year technology refresh due to obsolescence issues (2) production of Proof of Manufacturing (POM) units (3) first article testing (4) tooling (5) test equipment (6) procurement of technical data package updates, and (7) start-up costs for production contractors. - Installation funding for Government installation and integration of new MK 48 MOD 8 G&C and Afterbody Tail Cone Sections procured in prior years assembled into an MK 48 MOD 8 All-Up Round (AUR) Torpedo. Installation costs match procurement delivery timelines. - Diminishing Manufacturing Sources (DMS) funding provided to address obsolescence issues in the Mod 8 G&C and Afterbody/Tail Cone/Fuel Tank sections during the production cycle. The contractors will be required to procure and deliver DMS material for these obsolete components. [P5 / G5004 - Torpedo Other Procurement Investment]: Funding under this cost code provides for additional Warhead electronics Warhead Electronics System (WES, Exploder, Sources and Sensors, and Cables) and Fuel Tanks in FY 2021 to FY 2027 utilizing a new FY 2021 competitive MK 48 MOD 7 G&C and (WES) contract in order to replace the Warshot Fuel Tanks and Warhead Sections in the war reserve which were used by the MK 48 MOD 7 Torpedo Program from FY 2016 to FY 2020 to assemble an All-Up Round Torpedo. [P5 / G5003 - Support and Ancillary Equipment]: Funding under this cost code provides procurement and maintenance of support, technology refresh of test equipment at Naval Undersea Warfare Centers (NUWC) Keyport (KPT) and Newport (NPT), and the contractor facility for assembly, testing and integration. [P5 / G5830 - Production Engineering]: Funding under this cost code provides for production tasks performed by NUWC NPT and KPT and includes review of contractor generated Engineering Change Proposals (ECPs), review and resolution of contractor failures and proposed corrective action, configuration management activities, contractor monitoring, risk analysis, technical problem resolution, software engineering, safety, integrated logistics support, environmental engineering, information systems, test equipment, software maintenance and updates, and refurbishment of notable test equipment to provide to the contractors. Funding maintains production specification in accordance with production processes, provides subject matter experts to support root cause analysis of failed contractor hardware, and monitors contractor defect and reduction processes to ensure deficiencies are effectively addressed. Funding is also provided for program office acquisition support. [P5 / G5840 - Quality Assurance]: Funding under this cost code provides for quality assurance (QA) tasks performed by NUWC Keyport (KPT) and Newport (NPT) including: QA review of the contractor and subcontractor data, review of documentation indicating conformity to product performance requirements, and review of objective quality evidence. [P5 / G5860 - Acceptance T&E]: Funding under this cost code provides for integration and production acceptance testing of prime contractor hardware sections in an MK 48 MOD 7 All-Up Round (AUR) Torpedo.

Justification

Justification — MK-48 Torpedo

FY 2026 Program changes: The FY 2026 request for MK-48 Torpedo includes $7,081 thousand of discretionary and $261,240 thousand of mandatory (reconciliation) for a total of $268,321 thousand. The mandatory funds cover the requirement for the FY2026 MK 48 MOD 7 G&C/WUK (63) for $135,550 thousand, Afterbody/Fuel Tanks Section (63) for $77,094 thousand, Engineering Services for $9,393 thousand, 22 Installs for $5,980 thousand, Diminishing Manufacturing Sources for $156 thousand, War Reserve for $14,767 thousand, Production Engineering for $7,708 thousand, Quality Assurance $2,292 thousand, Acceptance Test & Evaluation $6,303 thousand and Support and Ancillary Equipment $1,996 thousand. Further information for this reconciliation request is provided in Section 20004 (Munitions & Supply Chain) of the Reconciliation Exhibit. 1.1.1) MOD 7 Guidance & Control (G&C) Section - FY 2026 includes $0 discretionary funding plus reconciliation funding for 63 G&C kits for $135,550K. FY2026 MK48 Mod 7 G&C / WUK Contract Option Step Ladder unit prices have not been negotiated to date, but unit prices are currently projected to increase by 5% per year from FY2025 G&C/WUK Section unit price of $2,043K Qty 79 to FY2026 G&C/WUK Section unit price of $2,152K Qty 63 to account for subsequent workforce costs higher than general inflation. Also, many of the materials like electronic and explosive components used in the G&C / WUK Section due to world-wide supply chain disruption have increased unit prices above increase above general inflation. 1.1.2) Afterbody/Tail Cone - FY 2026 includes $0 discretionary funding plus reconciliation funding for 63 Afterbody/Tail Cones for $77,094K. FY 2026 MK48 ABTC / FT Option Step Ladder unit prices are based on negotiated Priced Contract Option 4 Step Ladder unit prices. FY2025 MK48 ABTC / FT Section unit price of $1,122K Qty 85 to FY2026 ABTC / FT Section unit price of $1,224K Qty 63 due to higher stepladder price which accounts for the 9.0% Unit Price increase from FY 2025 to FY 2026. 1.1.3) Contractor Engineering Services / ECPs - FY 2026 includes $0 discretionary funding plus reconciliation funding for Contractor Engineering Services for $9,394K. 1.1.4) Installation - FY 2026 includes $6,987K discretionary funding for 51 installs plus reconciliation funding for 22 installs for $5,980K. 1.1.5) Diminishing Manufacturing Sources - FY 2026 includes $94K discretionary funding plus reconciliation funding for $156K for Diminishing Manufacturing Sources. 1.2.2) SUB Industrial Factory Equipment & Facility Improvements - Decreased funding to $0M in FY 2026. FY2025 $6,100K was a one-time increase for test equipment to address throughput of increased procurement and install quantities in outyears. 3.1.1) Warhead Electronics - FY 2026 includes $0K discretionary funding plus reconciliation funding for 19 Warhead Electronics for $11,622K. 3.1.2) Fuel Tank War Reserve - FY 2026 includes $0K discretionary funding plus reconciliation funding for 14 War Reserve Fuel Tanks for $3,145K. 4.1) Support and Ancillary Equipment- FY 2026 includes $0K discretionary funding plus reconciliation funding for Support and Ancillary Equipment for $1,996K. 5.1) Production Engineering (In-House & Ctr) - FY 2026 includes $0K discretionary funding plus reconciliation funding for Production Engineering for $7,708K. 6.1) Quality Assurance - FY 2026 includes $0K discretionary funding plus reconciliation funding for Quality Assurance for $2,292K. 7.1) Acceptance T&E - FY 2026 includes $0K discretionary funding plus reconciliation funding for Acceptance T&E for $6,303K.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Weapons Procurement, NavyNFY24 Actuals$296.3M
Weapons Procurement, NavyNFY25 Enacted$352.0M
Weapons Procurement, NavyNFY26 Disc. Request$7.08M
Weapons Procurement, NavyNFY26 Reconciliation$261.2M
Weapons Procurement, NavyNFY26 Total$268.3M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$978.0M$296.3M$352.0M$7.08M$7.08M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the N appropriation, program element 3117 (MK-48 Torpedo), its 4 largest high-confidence awards, the 2 recipient families behind them, and the 3 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the N appropriation, program element 3117 (MK-48 Torpedo), its 4 largest high-confidence awards, the 2 recipient families behind them, and the 3 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSNProcurement appropriation3117268.3M FY26N0002423C6411LOCKHEED MARTIN CORPORATION729.6MN0002422C6419SCIENCE APPLICATIONS INTERN…623.3MN0002416C6425SCIENCE APPLICATIONS INTERN…219.4MN0002416C6425SCIENCE APPLICATIONS INTERN…29.9MLockheed Martin CorpScience Applications Inte…VA-11NY-22IN-09

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
VA-11$830.0M
NY-22$728.5M
IN-09$29.9M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
LOCKHEED MARTIN CORPORATIONN0002423C6411high
SCIENCE APPLICATIONS INTERNATIONAL CORPORATIONN0002416C6425high
SCIENCE APPLICATIONS INTERNATIONAL CORPORATIONN0002422C6419high

Contractor concentration

HHI Indexⓘ
5040
Highly Concentrated
2023 Merger Guidelines bands
Top Contractor
SCIENCE APPLICATIONS INTERNATIONAL
Contractor Families
2
Program Obligationsⓘ
$1.59B

High-confidence award links only, pooled across ingested years. The index uses positive obligations; program obligations are net of deobligations. The figures over every published link, including medium-confidence ones, are in the downloadable warehouse, not on this page — why.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not MK-48 Torpedo. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.