Printed from https://fiscalreceipts.com/program/3043/ — data as of September 1, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Expeditionary Fast Transport (EPF)
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
| Fiscal year | Amount |
|---|---|
| FY24 | $0 |
| FY25 | $0 |
| FY26 | $11.2M |
All series figures: P-40 detail · PB2026
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Expeditionary Fast Transport (EPF)
Future joint forces will be responsive, deployable, agile, versatile, lethal, survivable, and sustainable. The nation will need lift assets that can provide for assured access, decrease predictability and dwell time, and have the capacity to quickly deliver troops and equipment together in a manner that provides for unit integrity. Expeditionary Fast Transport (EPF) (formerly Joint High Speed Vessel) will provide combatant commanders high-speed intra-theater sealift with inherent cargo handling capability and the agility to achieve positional advantage over operational distances. Not limited to major ports, the EPF will be able to operate in austere port environments. EPFs 15 and EPF 16 have modifications to conduct a Role 2 Enhanced (R2E) Medical Transport mission which will include enhanced medical capabilities to support embarked Medical Military Detachment (MILDET) teams while retaining the ability to perform high-speed intra-theater sealift. EMS 1-3 will have modifications to conduct a Role 2 Enhanced (R2E) Medical Transport mission which will include enhanced medical capabilities to support embarked Medical Military Detachment (MILDET).
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget Figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $3.61B | $0 | $0 | $11.2M | $11.2M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 149 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Expeditionary Fast Transport (EPF). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →