What it is
Expeditionary Fast Transport (EPF) (3043) is a Navy procurement line in the FY2026 budget request.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No single contractor is published as this line's leader. 3 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$0J-book detail · PB2026
FY25 Enacted
$0J-book detail · PB2026
FY26 Request
$11.2MJ-book detail · PB2026
FY25→26 Change
No comparison: endpoints unavailable or on different bases

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget Trajectory
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $0FY25: $0FY26: $11.2MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$0
FY25$0
FY26$11.2M

All series figures: J-book detail · PB2026

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Expeditionary Fast Transport (EPF)

Future joint forces will be responsive, deployable, agile, versatile, lethal, survivable, and sustainable. The nation will need lift assets that can provide for assured access, decrease predictability and dwell time, and have the capacity to quickly deliver troops and equipment together in a manner that provides for unit integrity. Expeditionary Fast Transport (EPF) (formerly Joint High Speed Vessel) will provide combatant commanders high-speed intra-theater sealift with inherent cargo handling capability and the agility to achieve positional advantage over operational distances. Not limited to major ports, the EPF will be able to operate in austere port environments. EPFs 15 and EPF 16 have modifications to conduct a Role 2 Enhanced (R2E) Medical Transport mission which will include enhanced medical capabilities to support embarked Medical Military Detachment (MILDET) teams while retaining the ability to perform high-speed intra-theater sealift. EMS 1-3 will have modifications to conduct a Role 2 Enhanced (R2E) Medical Transport mission which will include enhanced medical capabilities to support embarked Medical Military Detachment (MILDET).

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$3.61B$0$0$11.2M$11.2M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the N appropriation, program element 3043 (Expeditionary Fast Transport (EPF)), its 2 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the N appropriation, program element 3043 (Expeditionary Fast Transport (EPF)), its 2 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSNProcurement appropriation3043Expeditionary Fast Transport …N0002419C2227AUSTAL USA, LLC1.25BN0002416C2217AUSTAL USA, LLC23.4MAustal LimitedAL-02

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
AL-02$1.27B

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
AUSTAL USA, LLCN0002416C2217high
AUSTAL USA, LLCN0002419C2227high
KOAM ENGINEERING SYSTEMS, INC.N6600117F0562medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Expeditionary Fast Transport (EPF). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Detailed budget justification