Printed from https://fiscalreceipts.com/program/3016/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Family Anti-Armor Weapon Systems (FOAAWS)
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $32.6M |
| FY25 | $9.52M |
| FY26 | $107.0K |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $20.5M | $33.1M | $32.6M | ||
| Enacted | – | $21.4M | $23.6M | $9.52M | |
| Request | – | – | $23.6M | $9.52M | $107.0K |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $23.6M for FY2024; the PB2026 book reported $32.6M as actual total obligation authority — $8.98M above the request. 32.6 − 23.6 = 9.0 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Family Anti-Armor Weapon Systems (FOAAWS)
Family of Anti-Armor Weapon Systems (FOAAWS) The Family of Anti-Armor Weapon Systems portfolio provides anti-armor, anti-personnel, anti-material, and assault capabilities to Marine Rifle Squads, Combat Engineers, and Reconnaissance Teams to effectively execute both offensive and defensive operations such as Multi-purpose Anti-Armor Weapon System (MAAWS) M3A1, which is a portable, shoulder-fired, line-of-sight, reloadable, 84mm recoilless rifle. The Fire Control System (FCS), which is a precision-mounted optic with integrated Laser Range finder and a ballistic computer to provide precision firing solutions based on ammo type, range, and other key targeting information for MAAWS engagements. The FOAAWS portfolio also includes multiple systems required to support initial training at formal schools, operational training at operational units, and unit-level sustainment support equipment. Training devices include 7.62mm and 20mm Sub-caliber Adapters used for familiarization and operational training for the MAAWS, as well as the M72AS Light Anti-Tank Weapon (LAW) Trainer and the M287 AT4 Practice Launcher.
Justification
Justification — Family Anti-Armor Weapon Systems (FOAAWS)
FY 2026 Base Appropriation Request: $0.107M The FY 2026 request funds the procurement of 2 Fire Control Systems (FCS) as a technical refresh to replace existing FCS13RE Fire Control Systems with an advanced solution that will include integrated night vision and target magnification to enable Marines to more effectively identify and engage enemy targets during day and night operations. The decrease from FY 2025 to FY 2026 reflects a reduction of FCS procurements.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement, Marine Corps | N | FY24 Actuals | $32.6M |
| Procurement, Marine Corps | N | FY25 Enacted | $9.52M |
| Procurement, Marine Corps | N | FY26 Disc. Request | $107.0K |
| Procurement, Marine Corps | N | FY26 Total | $107.0K |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $213.9M | $32.6M | $9.52M | $107.0K | $107.0K |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Family Anti-Armor Weapon Systems (FOAAWS). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O792
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O764
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O807
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.