Skip to content
Fiscal Receipts

Anti-Armor Missile-Javelin

NavyProcurementReconciledBLI3011
What it is
Anti-Armor Missile-Javelin (3011) is a Navy procurement line funded in the Procurement, Marine Corps account.
What changed
-$20.7M FY25→26 P-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 1 linked award record is listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$672.6MP-1 TOA · PB2026
FY25 Enacted
$53.3MP-1 TOA · PB2026
FY26 Request
$32.6MP-1 TOA · PB2026
FY25→26 Change
-$20.7MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $672.6MFY25: $53.3MFY26: $32.6MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$672.6M
FY25$53.3M
FY26$32.6M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$207.3M$257.9M$672.6M
Enacted–$16.7M$54.9M$53.3M
Request––$54.9M$61.6M$32.6M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $54.9M for FY2024; the PB2026 book reported $672.6M as actual total obligation authority — $617.7M above the request. 672.6 − 54.9 = 617.7 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Anti-Armor Missile-Javelin

The Javelin Missile provides the United States Marine Corps (USMC) with a man-portable, fire-and-forget, medium-range, anti-armor missile with enhanced situational awareness and direct-fire effects. It is capable of defeating armored vehicles, fortifications, and soft targets in a full spectrum operations. The Javelin Missile has a high kill rate against a variety of targets at extended ranges, under adverse environments, weather conditions, day/night operations, battlefield obscurants, and multiple counter-measure conditions. The system's soft launch feature permits firing from a fighting position or from an enclosure, and the modular design allows for evolution of both software and hardware upgrades to meet changing threats and requirements. The system consists of a reusable Lightweight Command Launch Unit (CLU) with a built-in-test, along with a modular missile encased in a disposable launch tube assembly, and training devices for tactical and classroom exercises. Javelin's fire-and-forget technology allows the gunner to fire without the need to track targets while providing enhanced lethality through the use of a tandem warhead that is able to defeat all current armor threats. This system is effective against both stationary and moving targets and provides defensive capability against attacking/hovering helicopters. The performance improvements in the current production of Javelin Block I missiles include an increased probability of hit and or kill at 2500m, improved warhead lethality, and reduced time of flight. The U.S. Army Program Executive Office Missiles and Space (PEO MS) Tactical Aviation & Ground Munitions (TAGM) Javelin Product Office is the lead for this joint program with the USMC.

Justification

Justification — Anti-Armor Missile-Javelin

FY 2026 Baseline Appropriation Request: $32.576M ($32.165M Active; $0.411M Reserve) The decrease of $20.675M from FY 2025 to FY 2026 is due to the missile contract award delay. Ukraine Presidential Drawdown Authority has provided an influx of funding to support the increased volume of missiles being placed on contract, the current delivery time is 72-84 months from contract award. To increase volume of missiles deliveries, the federal government is providing non-recurring engineering (NRE) funding to support the expansion of facilities. FY 2026 funding will support Engineering Support in Production and logistical support of the Javelin Missile system, to include program management support, configuration management, First Article Acceptance Testing, Lot Acceptance Testing, and support for items currently in production, and/or postproduction delivery. Additionally, this funding addresses any changes to Form, Fit, and Function in design, assuring this ammunition is of the highest quality, and deals with any manufacturing concerns during these processes. FY 2026 funding will also support the procurement of Lightweight Command Launch Units (LWCLU), LWCLU Trainers, and Battery Coolant Units (BCU), and Initial Issue Provisioning Packages. The legacy Block I Command Launch Unit (CLU) is approaching technical and logistical obsolescence and can no longer be procured or sustained. LWCLU is needed to achieve the extended maximum range provided by the newer Javelin missiles, enabling the USMC to maintain a tactical advantage against enemy armor and provide effective sustainment.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Procurement, Marine CorpsNFY24 Actuals$672.6M
Procurement, Marine CorpsNFY25 Enacted$53.3M
Procurement, Marine CorpsNFY26 Disc. Request$32.6M
Procurement, Marine CorpsNFY26 Total$32.6M

Exhibit P-1R

AccountOrgTypeAmount
Procurement, Marine CorpsNFY24 Actuals$390.0K
Procurement, Marine CorpsNFY25 Enacted$400.0K
Procurement, Marine CorpsNFY 2026 request$411.0K

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$833.8M$672.6M$53.3M$32.6M$32.6M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
RAYTHEON/LOCKHEED MARTIN JAVELIN JVW31P4Q13C0129medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

3 mentions from the Senate LDA disclosure database.

RTX CORPORATION AND AFFILIATESArmor|Missile2025matched 2+ title words

Issues associated with Congressional notifications of proposed foreign military and direct commercial sales. Issues…

RTX CORPORATION AND AFFILIATESArmor|Missile2025matched 2+ title words

Issues associated with Congressional notifications of proposed foreign military and direct commercial sales. Issues…

RTX CORPORATION AND AFFILIATESArmor|Missile2025matched 2+ title words

Issues associated with Congressional notifications of proposed foreign military and direct commercial sales. Issues…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Anti-Armor Missile-Javelin. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.