High Perf Computing Mod Pgm (HPCMP)

ArmyProcurementReconciledBLI3005B66501
Watch this program

Published budget signals for this program, with links to receipts.

Updates appear after a data refresh and publication. No fixed update schedule is available.

Paste the RSS address into a feed reader. No Fiscal Receipts account is required.

RSSAtom

What it is
High Perf Computing Mod Pgm (HPCMP) (3005B66501) is an Army procurement line funded in the Other Procurement, Army account.
What changed
-$1.62M FY25→26 P-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 1 linked award record is listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$76.1MP-1 TOA · PB2026
FY25 Enacted
$76.3MP-1 TOA · PB2026
FY26 Request
$74.7MP-1 TOA · PB2026
FY25→26 Change
-$1.62MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $76.1MFY25: $76.3MFY26: $74.7MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$76.1M
FY25$76.3M
FY26$74.7M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$69.9M$88.7M$76.1M
Enacted–$88.7M$76.1M$76.3M
Request––$76.1M$76.3M$74.7M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — High Perf Computing Mod Pgm (HPCMP)

The Department of Defense (DoD) High Performance Computing (HPC) Modernization Program, managed by the Army, supports the needs of all services for technological superiority and military dominance on the battlefield by providing advanced computational services to U.S. weapons system scientists and engineers. By exploiting continuous advances in high performance computing technology, the Defense Research, Development, Test and Evaluation (RDT&E), and acquisition engineering community is able to resolve critical scientific and engineering problems quickly and with more precision. The results of these efforts align to DoD National Defense Strategy priorities, such as hypersonics, directed energy, autonomy, and artificial intelligence, and feed directly into the acquisition process by improving weapons system designs through an increased understanding of materials, aerodynamics, chemistry, fuels, acoustics, signal image recognition, electromagnetics, and other areas of basic and applied research as well as enabling advanced test and evaluation environments that allow synthetic scene generation, automatic control systems and virtual test environments. As such, HPC has been identified as a key enabling technology essential to achieving the objectives of the DoD's Science and Technology (S&T), Test and Evaluation (T&E), and acquisition communities. The program deploys compute-intensive and data-intensive systems to provide world-class HPC capabilities to the DoD-wide user community. The HPC Modernization program provides focused modernization efforts crafted to ensure DoD's S&T and T&E communities are supported with current generation supercomputing capabilities. The HPC modernization program resulted from congressional language that recognized supercomputing as a national strategic asset and directed the DoD to focus on supercomputing modernization at laboratories and test centers to keep its forces and military systems on the leading technological edge.

Justification

Justification — High Perf Computing Mod Pgm (HPCMP)

FY 2026 Base procurement dollars in the amount of $74.708 million supports the following efforts: FY 2026 Base procurement dollars in the amount of $70.708 million supports the following efforts: (3) HPC systems at three (3) DoD Supercomputing Resource Center (DRSC) locations with the cost per location dependent on the system architecture. FY 2026 Base procurement dollars in the amount of $4.000 million supports two (2) DoD HPC Project Investments (DHPIs) for Army, Navy, Air Force, or Agency initiatives or two (2) exploratory HPC systems. DHPIs require unique specifications or computing classification that cannot be addressed with shared, allocated HPC systems. Exploratory HPC systems investigate new use cases and workloads beyond traditional modeling and simulation, such as big data, artificial intelligence, tactical computing at the edge.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$76.1M
Other Procurement, ArmyAFY25 Enacted$76.3M
Other Procurement, ArmyAFY26 Disc. Request$74.7M
Other Procurement, ArmyAFY26 Total$74.7M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$701.2M$76.1M$76.3M$74.7M$74.7M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the A appropriation, program element 3005B66501 (High Perf Computing Mod Pgm (HPCMP)), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the A appropriation, program element 3005B66501 (High Perf Computing Mod Pgm (HPCMP)), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSAProcurement appropriation3005B6650174.7M FY26W912DY18F0038HPE GOVERNMENT, LLC29.2MHPE GOVERNMENT, LLCOH-10

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
OH-10$29.1M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
HPE GOVERNMENT, LLCW912DY18F0038high

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not High Perf Computing Mod Pgm (HPCMP). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.