Skip to content
Fiscal Receipts

Other Major Equipment

DTRAProcurementReconciledBLI30
What it is
Other Major Equipment (30-DTRA) is a DTRA procurement line funded in the Procurement, Defense-Wide account.
What changed
+$3.24M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$12.8MP-1 TOA · PB2026
FY25 Enacted
$8.78MP-1 TOA · PB2026
FY26 Request
$12.0MP-1 TOA · PB2026
FY25→26 Change
+$3.24MP-1 TOA · PB2026

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget Trajectory
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $12.8MFY25: $8.78MFY26: $12.0MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$12.8M
FY25$8.78M
FY26$12.0M

All series figures: P-1 TOA · PB2026

Decade view — P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$7.64M$5.47M$6.44M$12.4M$5.59M$12.5M$9.99M$12.7M$14.3M$12.8M
Enacted$5.47M$6.44M$12.4M$5.59M$11.5M$12.5M$12.7M$14.3M$12.8M$8.78M
Request$6.44M$12.4M$5.59M$11.5M$9.99M$12.7M$14.3M$12.8M$8.78M$12.0M

blank = series not published for this year; – = absent from that edition.

Program lineage

This code is shared by more than one budget line. No predecessor or successor is assigned to this specific account or organization.

Description

Description — OTHER MAJOR EQUIPMENT

The Other Major Equipment Procurement Program supports the following mission requirements: - Enable the Nuclear Arms Control Technology (NACT) program to meet on-going operational responsibilities for the recapitalization of the U.S. International Monitoring System stations in support of the United States and Department of Defense objectives related to implementation, monitoring, and verification for nuclear arms control activities; - Modernize the Defense Stockpile Management System (DSMS). DSMS contains the Defense Integration and Management of Nuclear Data Services (DIAMONDS), an information system providing nuclear weapons stockpile tracking, management, and nuclear weapons reporting necessary to support the DoD Nuclear Weapons Stockpile Database of record and other nuclear weapons sustainment and management applications; - Material Handling Equipment (MHE) to support missions in the United States and overseas. MHE refers to various equipment for handling supplies with greater ease and economy, to include but not limited to forklifts. The equipment is operated on rocky and unpaved terrain, resulting in shortened life cycles and increased maintenance; - Lifecycle replacement of end of life mission IT infrastructure and deployable Joint Expeditionary Kits to maintain 99.9% service availability, maintain network Authorizations to Operate, remediate Defense Intelligence Agency cybersecurity inspection findings, and consolidate/integrate mission networks; and - Joint DoD Radiation Detection System (RDS) to train all service members at the Defense Nuclear Weapons School to operate in a realistic combined joint radiological environment.

Justification

Justification — OTHER MAJOR EQUIPMENT

The FY 2024 budget of $12.787 million resourced the following efforts: - Procure and install one of three remaining next-generation Noble Gas Systems, upgrade one radionuclide particulate system, and upgrade one radionuclide shelter for the Nuclear Arms Control Technology (NACT) program to improve detection capability and strengthen arms control verification regime; - Modernize the core equipment for the Defense Stockpile Management System (DSMS) network infrastructure, replacing end-of-life equipment such as servers, switches, and network encryption devices; - Modernize and increase capacity of the DTRA Integration, Test and Engineering Center (DITEC) capability; - Perform technical refresh of back-end Information Technology infrastructure supporting DTRA's mission critical systems and capabilities; and - Acquire a Joint DoD Radiation Detection System (RDS) to replace legacy radiological detection systems that are used to train service members at Kirtland AFB. The FY 2025 budget of $8.783 will fund the following efforts: - Procure and install one of two remaining next-generation Noble Gas Systems, upgrade one radionuclide particulate system, and upgrade one radionuclide shelter for the Nuclear Arms Control Technology (NACT) program to improve detection capability and strengthen arms control verification regime; - Modernize the Defense Stockpile Management System (DSMS) network infrastructure with advanced network encryption, cyber and Artificial intelligence (AI) capabilities to enhance security and detection capabilities; - Acquisition of 40 components that comprise the overall Joint DoD Radiation Detection System (RDS) to train Service Members at the Defense Nuclear Weapons School on Kirtland AFB to operate in a realistic combined joint radiological environment. This acquisition will replace the current system used by the individual Services for radiological detection; - Perform technical refresh of Joint Expeditionary Kits (JEKs) to remain on schedule for 20% lifecycle replacement, per each year of the Future Years Defense Program (FYDP). This will ensure kits are not at risk of failing in the field due to aging equipment; and - Provide standard life-cycle replacement for Special Purpose Processing Nodes (SPPN) to ensure full functionality of the unclassified and classified Local Area Networks (LANs). The FY 2026 budget of $12.023 million will fund the following efforts: - Procure the last of five next-generation noble-gas systems and recapitalize one radionuclide particulate system for the Nuclear Arms Control Technology (NACT) program to strengthen arms control and improve the U.S. International Monitoring System (IMS); - Modernize the Defense Stockpile Management System (DSMS) network infrastructure with advanced network encryption, cyber and Artificial intelligence (AI) capabilities to enhance security and detection capabilities; - Final procurement of Joint DoD Radiation Detection System (RDS) components to support training of Service Members at the Defense Nuclear Weapons School on Kirtland AFB to operate in a realistic combined joint radiological environment; - Perform conditions-based tech refresh of Joint Expeditionary Kits (JEKs) to retain working kits for use on a contingency basis; refresh mission infrastructure to maintain 99.9% availability on Non-classified Internet Protocol Router Network (NIPRNet), Secret Internet Protocol Router Network (SIPRNet), and Joint Worldwide Intelligence Communication System (JWICS); and - Consolidate DTRA mission networks and invest in Agency-wide Development, Security, and Operations (DevSecOps) platform and containerized infrastructure to host countering weapons of mass destruction (CWMD) technologies at three classification levels.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Procurement, Defense-WideDTRAFY24 Actuals$12.8M
Procurement, Defense-WideDTRAFY25 Enacted$8.78M
Procurement, Defense-WideDTRAFY26 Disc. Request$12.0M
Procurement, Defense-WideDTRAFY26 Total$12.0M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$137.4M$12.8M$8.78M$12.0M$12.0M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

This code is shared by more than one budget line. No lobbying matches are assigned to this specific account or organization.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Other Major Equipment. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.