What it is
EMI Control Instrumentation (2970) is a Navy procurement line funded in the Other Procurement, Navy account.
What changed
-$394.0K FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$4.28MP-1 TOA · PB2026
FY25 Enacted
$4.08MP-1 TOA · PB2026
FY26 Request
$3.69MP-1 TOA · PB2026
FY25→26 Change
-$394.0KP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $4.28MFY25: $4.08MFY26: $3.69MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$4.28M
FY25$4.08M
FY26$3.69M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$3.92M$4.22M$4.28M
Enacted–$4.22M$4.28M$4.08M
Request––$4.28M$4.08M$3.69M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $4.28M for FY2024; the PB2026 book reported $4.28M as actual total obligation authority — $3.00K below the request. 4.3 − 4.3 = -0.0 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — EMI Control Instrumentation

The EMI Control Instrumentation Program is supported by OPNAV N2N6, OPNAV N95, OPNAV N96, OPNAV N97 and OPNAV N98. The EMI Control Instrumentation Program provides Cradle to Grave Systems Engineering for Mission Assurance by implementing Electromagnetic Compatibility (EMC) hardware solutions, Spectrum Management (SM) software solutions, and by procuring specialized test equipment used in the characterization/ quantification of EMI problems aboard US Navy platforms. This ensures equipment, systems, and platforms meet their Operational Mission Requirements and goals within their intended operational Electromagnetic (EM) environment. MA004 - EMI (HARDWARE) FIXES: Procurement and installation of Electromagnetic Interference (EMI) Hardware Solutions (i.e. Fixes) will achieve Electromagnetic Compatibility (EMC) among and between shipboard electronic/electric systems and/or equipment. This will be accomplished by determining the optimal EMI fix hardware, evaluating the effectiveness of the EMI solution, then procuring and installing the required hardware for mitigation verification. The fixes may include various types of radio frequency (RF) filters, limiters, Transient Protection Devices (TPD), blankers, radar absorbing material (RAM) and shielding methods. MA004 - EMI (Hardware) Fixes is supported by OPNAV N95, OPNAV N96, OPNAV N97 and OPNAV N98. MA104 - EMI (SOFTWARE) FIXES: Procurement and installation of EMI Software Fixes for platform/strike group/Area of Operation. These specific spectrum procedures (software application capabilities) and frequency management techniques (software modules) will be used to eliminate and reduce EMI when hardware solutions are unacceptable. Funds will also be used to support procurement of models and other capabilities, including ILS for software tools/utilities/applications that correct/mitigate operational EMI. MA104 - EMI (Software) Fixes are supported by OPNAV N95, OPNAV N96, OPNAV N97 and OPNAV N98. MA204 - EMI CONTROL INSTRUMENTATION: EMI Control Instrumentation will procure specialized test equipment used in the characterization and quantification of EMI problems aboard US Navy platforms. Instrumentation will be procured for use in identifying the sources of EMI and determining the extent of EMI so that effective corrective measures can be applied. The instrumentation procured will include automated and special EMI test equipment (e.g., for spectrum analysis, mapping field intensities, etc.). EMI Control Instrumentation can include both hardware and software products that will enhance or streamline data collection efforts, including the ability to provide remote access capability. MA204 - EMI CONTROL INSTRUMENTATION are supported by OPNAV N2N6.

Justification

Justification — EMI Control Instrumentation

Funding decrease of $394K from PB25 to PB26 applied to EMI Hardware (MA004), Software Fixes (MA104) procurements and EMI Control Instrumentation. The FY 2026 request was reduced by $.396 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." MA004 (EMI HDW Fixes) OPN Funds are used to procure and install (P/I) EMI Fixes on deploying ships and submarines. The number of EMI Fixes procured (MA004 Hardware Fixes) are dependent on the number of ships/submarines in the Fleet and when they deploy. MA104 (EMI SFW Fixes) procures and installs SFW Fixes to mitigate electromagnetic interference (EMI). This effort retains responsibility for the procurement of models and frequency management techniques that are encompassed by other Navy tools (e.g., Real-Time Spectrum Operations). MA204 (EMI Control Instrumentation) procures and installs specialized test equipment for HW and SW products in collecting data to provide corrective measures.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, NavyNFY24 Actuals$4.28M
Other Procurement, NavyNFY25 Enacted$4.08M
Other Procurement, NavyNFY26 Disc. Request$3.69M
Other Procurement, NavyNFY26 Total$3.69M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$66.2M$4.28M$4.08M$3.69M$3.69M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not EMI Control Instrumentation. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.