Skip to content
Fiscal Receipts

Armored Multi Purpose Vehicle (AMPV)

ArmyProcurementReconciledBLI2944G80819
Watch this program

Published budget signals for this program, with links to receipts.

Updates appear after a data refresh and publication. No fixed update schedule is available.

Paste the RSS address into a feed reader. No Fiscal Receipts account is required.

RSSAtom

What it is
Armored Multi Purpose Vehicle (AMPV) (2944G80819) is an Army procurement line funded in the Procurement of Weapons and Tracked Combat Vehicles, Army account.
What changed
+$173.2M FY25→26 P-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 7 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$592.1MP-1 TOA · PB2026
FY25 Enacted
$381.5MP-1 TOA · PB2026
FY26 Request
$554.7MP-1 TOA · PB2026
FY25→26 Change
+$173.2MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $592.1MFY25: $381.5MFY26: $554.7MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$592.1M
FY25$381.5M
FY26$554.7M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$950.4M$1.24B$592.1M
Enacted–$380.7M$554.8M$381.5M
Request––$554.8M$515.3M$554.7M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $554.8M for FY2024; the PB2026 book reported $592.1M as actual total obligation authority — $37.3M above the request. 592.1 − 554.8 = 37.3 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Armored Multi Purpose Vehicle (AMPV)

The Armored Multi-Purpose Vehicle (AMPV) is the materiel solution for replacement of the Army's Armored Personnel Carrier (M113) Family of Vehicles (FoV) within the Armored Brigade Combat Team (ABCT). This line is directly aligned to the Army Next Generation Combat Vehicle Modernization Priority. The AMPV mitigates current and future capability gaps in force protection, mobility, reliability, and interoperability across the Spectrum of Conflict. The AMPV replaces the five mission roles currently performed by the M113 Family of Vehicles by transferring the current M113 Mission Equipment Packages (MEP) to a new Military Vehicle Derivative (MVD) platform as well as procure AMPVs to fulfill and support various Army capabilities and requirements. In total, the AMPV Family of Vehicles accounts for approximately 30% of the Armored Brigade Combat Team's tracked fleet and consists of the following five variants: 1. Mission Command (CD) Variant: This platform enables effective mission command planning and execution for both the Tactical Operations Center (TOC) and Tactical Command Vehicle (TAC) versions of the Mission Command Variant. It will host current Battle Command Systems, future replacements, and upgrades of hardware and software. 2. Medical Treatment (MT) Variant: This platform provides a protected surgical environment, with adequate lighting and accessible medical equipment. It provides a capability for immediate medical care for one patient by a medical crew of four. 3. Medical Evacuation (ME) Variant: This platform conducts ambulance type activities and provides casualty evacuation for up to four litter (tactical stretcher) or six ambulatory patients, with a crew of three medical attendants. 4. General Purpose (GP) Variant: This platform operates throughout the battle space by conducting re-supply, maintenance, casualty evacuation, and other tasks within the formation. 5. Mortar Carrier (MC) Variant: This platform provides immediate responsive fire support to conduct fast-paced offensive operations.

Justification

Justification — Armored Multi Purpose Vehicle (AMPV)

FY 2026 procurement dollars in the amount of $554.678 million procures 86 Armored Multi-Purpose Vehicles (AMPVs) to include the purchase of government furnished material, government furnished equipment, kits, and field modification hardware. Accordingly, FY 2026 procurement covers government engineering, logistics, testing, and program management efforts supporting improvements to meet performance and user requested system enhancements. In addition, the funding provides obsolescence management to enable uninterrupted production, fleet modifications and retrofits to implement system enhancements that affect vehicle configurations and previously procured hardware. AMPV will mitigate current and future capability gaps in force protection, survivability, lethality, mobility, reliability, and interoperability across the Spectrum of Conflict. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Army Acquisition Objective (AAO): 2897 vehicles

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY24 Actuals$592.1M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY25 Enacted$381.5M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY26 Disc. Request$554.7M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY26 Total$554.7M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$3.29B$592.1M$381.5M$554.7M$554.7M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the A appropriation, program element 2944G80819 (Armored Multi Purpose Vehicle (AMPV)), its 4 largest high-confidence awards, the 3 recipient families behind them, and the 3 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the A appropriation, program element 2944G80819 (Armored Multi Purpose Vehicle (AMPV)), its 4 largest high-confidence awards, the 3 recipient families behind them, and the 3 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSAProcurement appropriation2944G80819554.7M FY26W56HZV23C0024BAE SYSTEMS LAND & ARMAMENT…2.48BW56HZV20C0124RENK AMERICA LLC872.8MW56HZV20C0124RENK AMERICA LLC39.9MW56HZV20C0124L3 TECHNOLOGIES, INC.26.4MBAE Systems PLCRENK AMERICA LLCL3 TECHNOLOGIES, INC.PA-10MI-02MI-08

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
PA-10$2.48B
MI-02$862.7M
MI-08$39.9M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
BAE SYSTEMS LAND & ARMAMENTS L.P.W56HZV23C0024high
RENK AMERICA LLCW56HZV20C0124high
BAE SYSTEMS LAND AND ARMAMENTS L.P.W56HZV15CA001medium
BAE SYSTEMS LAND AND ARMAMENTS L.P.W56HZV21F0276medium
BAE SYSTEMS LAND AND ARMAMENTS L.P.W56HZV21F0378medium
BAE SYSTEMS LAND AND ARMAMENTS L.P.W56HZV22F0007medium
BAE SYSTEMS LAND AND ARMAMENTS L.P.W56HZV22F0023medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

23 mentions from the Senate LDA disclosure database.

BAE SYSTEMS INCArmored|Multi|Purpose|Vehicle2026matched 2+ title words

National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…

BAE SYSTEMS INCArmored|Multi|Purpose|Vehicle2026matched 2+ title words

National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…

Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…

BAE SYSTEMS INCArmored|Multi|Purpose|Vehicle2025matched 2+ title words

Department of Defense Appropriations Act, 2026 (HR 4016/S 2572); provisions regarding R&D - Navy, Air Force, Space…

BAE SYSTEMS INCArmored|Multi|Purpose|Vehicle2025matched 2+ title words

Full-Year Continuing Appropriations and Extensions Act, 2025 (PL 119-4); provisions regarding R&D - Army, Navy/USMC…

Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…

Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…

Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…

Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…

Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…

BAE SYSTEMS INCArmored|Multi|Purpose|Vehicle2024matched 2+ title words

Department of Defense Appropriations Act of 2025 (HR 8774/S 4921); provisions regarding R&D-Army, Navy/USMC, Air…

BAE SYSTEMS INCArmored|Multi|Purpose|Vehicle2024matched 2+ title words

Department of Defense Appropriations Act of 2025 (HR 8774/S 4921); provisions regarding R&D-Army, Navy/USMC, Air…

BAE SYSTEMS INCArmored|Multi|Purpose|Vehicle2024matched 2+ title words

Department of Defense Appropriations Act of 2024 (HR 4365/S 2587; PL 118-47) and Further Consolidated Appropriations…

BAE SYSTEMS INCArmored|Multi|Purpose|Vehicle2024matched 2+ title words

Department of Defense Appropriations Act of 2025 (HR 8774/S XXXX); provisions regarding R&D-Army, Navy/USMC, Air…

PHILLIPS 66Multi|Vehicle2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

PHILLIPS 66Multi|Vehicle2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

PHILLIPS 66Multi|Vehicle2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

PHILLIPS 66Multi|Vehicle2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…

Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…

Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…

Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…

Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Armored Multi Purpose Vehicle (AMPV). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.