Printed from https://fiscalreceipts.com/program/2881R68400/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Grnd Standoff Mine Detectn Sysm (GSTAMIDS)
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
Insufficient trajectory data for sparkline (only FY24 available).
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY24 |
|---|---|
| Actuals | $15.0M |
blank = series not published for this year; – = absent from that edition.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Grnd Standoff Mine Detectn Sysm (GSTAMIDS)
This is an All-Types line covering ground vehicle mounted or towed landmine detection, marking and neutralization systems. This Program Element contributes to Area Access (A2) to support unified land operations and improve soldier survivability. This line is used to procure Improvise Explosive Devices (IED) and landmine detection, interrogation, neutralization, protection, Area Access, route clearance and area clearance capabilities. Procurement of improved detection, interrogation, neutralization and protection capabilities for mine, IED and Explosive Hazard threats are needed as technology becomes available. This exhibit contains the following programs: Explosive Hazard Pre-Detonation (EHP) EHP provides the capability of a Roller System (on the Medium Mine Protected Vehicles (MMPV) Type II), Debris Blower (on the Buffalo Mine Protected Clearance Vehicle), and Wire Neutralization (on the Husky based Vehicle Mounted Mine Detection system). EHP enhances route clearance capabilities while on the move to detect (by encounter), neutralize and survive against a full spectrum of explosive hazard landmines, IEDs, Explosively Formed Penetrator, unexploded ordnance, battlefield munitions and trigger their mechanisms while conducting route clearance operations. The Army Acquisition Objective (AAO) for the Roller System is 144, the Debris Blower is 105, and the Wire Neutralization System (WNS) is 96. Mine Clearing Vehicle (MCV) The M1271 Mine Clearing Vehicle is a medium, commercially available, blast protected, mechanical flail. The MCV is a manually controlled, self powered vehicle with an adjustable depth flail head designed to clear large areas of anti-tank and anti-personnel land mines. The AAO for MCV is 41. Route Clearance Virtual Clearance Training Suite (VCTS) The VCTS provides soldiers at 14 sites the capability for virtual training on Route Clearance vehicles, EHP, and MCV systems. Vehicle Optics Sensor System (VOSS) VOSS provides a telescoping, gyro-stabilized, high resolution, triple sensor (day camera, Image Intensify Night Vision Sensor and an Infrared Sensor) surveillance system to optically detect from standoff distances, explosive hazards (Improvised Explosive Device (IEDs) and landmines), and their trigger sources. VOSS is mounted on MMPV located within Route Clearance Platoons and Explosive Ordinance. Disposal (EOD) Companies. PM Ground Sensors is pursuing an acquisition approach which harvests Quick Reaction Capability (QRC) procured systems for refresh into the Program of Record (POR). The refresh effort will be conducted at Tobyhanna Army Depot.
Justification
Justification — Grnd Standoff Mine Detectn Sysm (GSTAMIDS)
There are no FY 2026 Base Procurement funding requirements for this program.
Budget Line Items(workbook-cited)
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Army | A | FY24 Actuals | $15.0M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals |
|---|---|---|
| Program Element | $2.11B | $15.0M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →