Stinger Mods
Budget figures
$428.9M discretionary + $77.0M one-time reconciliation. Discretionary change vs FY2025 enacted: +470.8%.
Two official figures, one label— reconciled below
Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →
FY26 Request · $505.9M TOA − $428.9M J-book line = 77.0M (505.9 − 428.9 = 77.0) — $77.0M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement
Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $55.4M |
| FY25 | $75.1M |
| FY26 | $505.9M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $303.8M | $275.0K | $55.4M | ||
| Enacted | – | $0 | $36.5M | $75.1M | |
| Request | – | – | $36.5M | $75.1M | $505.9M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $36.5M for FY2024; the PB2026 book reported $55.4M as actual total obligation authority — $19.0M above the request. 55.448 − 36.484 = 18.964 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Stinger Mods
The Stinger Block I missile is an advanced, fire-and-forget, short-range, Soldier-portable, shoulder-fired and platform mounted guided missile system that provides the air defense protection for the maneuver force and point defense assets. Stinger's mission is to provide the force with low-altitude air defense against Fixed Wing (FW) and Rotary Wing (RW) Aircraft, Unmanned Aircraft Systems (UAS) and Cruise Missiles (CM). The Stinger missile is deployable from a variety of platforms that includes vehicles, helicopters and UAS. Stinger is part of the Army Transformation Initiative.
Justification
Justification — Stinger Mods
The FY 2026 request for Stinger Mods includes 428,935 thousand of discretionary and 77,000 thousand of mandatory (reconciliation) for a total of 505,935 thousand. The mandatory funds will procure an additional 101 Stinger Block I missiles and 3 Production Verification Flight Test missiles. Further information for this reconciliation request is provided in Section 20003 (Missile Defense) of the Reconciliation Exhibit. The FY 2026 funding of $428.935 Million procures 547 Stinger Block I missiles and 18 Stinger Block I Production Verification Flight Test missiles. Funding also provides for Acceptance Testing, Test Equipment, Engineering Services and Program Management support. Unit price and quantities reflect yearly Foreign Military Sales (FMS) procurement of Stinger missiles. In the event FMS procurements do not occur at this level, the budgeted missile price and quantities may not be achievable. The unit cost on the FY24/FY25 contract is based on bundling with FMS. FY26 will not bundle with FMS partners driving the unit cost increase. In accordance with Section 1815 of the FY08 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Stinger is part of the Army Transformation Initiative.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Missile Procurement, Army | A | FY24 Actuals | $55.4M |
| Missile Procurement, Army | A | FY25 Enacted | $75.1M |
| Missile Procurement, Army | A | FY26 Disc. Request | $428.9M |
| Missile Procurement, Army | A | FY26 Reconciliation | $77.0M |
| Missile Procurement, Army | A | FY26 Total | $505.9M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $851.6M | $55.4M | $75.1M | $428.9M | $428.9M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.
| Recipient | PIID | Confidence |
|---|---|---|
| AIRTRONICS, LLC | W31P4Q22C0076 | medium |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Stinger Mods. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O79
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O76
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O76
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
Missile Procurement Army · www.asafm.army.mil