Printed from https://fiscalreceipts.com/program/2676/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Strategic Platform Support Equip
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
Insufficient trajectory data for sparkline (only FY24 available).
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 |
|---|---|---|---|
| Actuals | $4.82M | $6.27M | $6.43M |
| Enacted | – | $6.27M | $6.44M |
| Request | – | – | $6.44M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $6.44M for FY2024; the PB2026 book reports $6.43M actually spent — $4.00K below the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Strategic Platform Support Equip
Funding in this P-1 line provides Non-Propulsion Electronics equipment that will be installed aboard TRIDENT Class submarines as part of the Obsolete Equipment Replacement (OER) Program. Beginning in FY25, all requirements are aligned under 0950 due to the zero-sum transfer of funds from Budget Line Item 2676 into 0950 by OPNAV. OER Program is the replacement of existing hardware/software that, though functional, has become operationally obsolete, is no longer in production or supportable with spare parts, or has a high failure rate making them no longer cost effective to maintain. OER hardware/software changes are expected to provide significant cost savings via reduced maintenance costs and use Commercial-Off-The-Shelf (COTS) technology wherever possible as long as all technical requirements are met. This funding line includes performance of the required fully integrated system level testing and certification of changes to the TRIDENT Combat systems prior to installation of the changes on the ship. Integrated testing and certification provides assurance that when the changes are installed in the ship, the TRIDENT Combat system will operate as designed, allowing the ships to maintain their operational schedules and mission capabilities. [P40A / Combat Control System (CCS) Revision Engineering Cert/Test]: This program develops upgrades to legacy systems to maintain required interface connectivity to other Program Acquisition Resource Manager (PARM)- managed subsystems in response to PARMs modernizations, or to address obsolescence, or where mandated requirement changes (example Cyber security) drive changes to hardware or software.
Justification
Justification — Strategic Platform Support Equip
Funds realigned from Budget Line Item 2676 into 0950. Efforts included are the Common Platform Engineering, Combat Control Systems (CCS) Revision Engineering/Certification/Test, and SSBN Legacy CCS Modernization.
Budget Line Items(workbook-cited)
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Navy | N | FY24 Actuals | $6.43M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $90.1M | $6.43M | $0 | $0 | $0 |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →