Printed from https://fiscalreceipts.com/program/2611C72100/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
LONG-RANGE HYPERSONIC WEAPON
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $62.8M
- FY26
- $438.4M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $0 | $249.3M | $62.8M | ||
| Enacted | – | $249.3M | $156.8M | $669.2M | |
| Request | – | – | $156.8M | $744.2M | $438.4M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $156.8M for FY2024; the PB2026 book reports $62.8M actually spent — $94.0M below the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — LONG-RANGE HYPERSONIC WEAPON
This funding supports the fielding of critical enabling technologies and capabilities that address near-term, and mid-term threats and is directly aligned to the Army Long Range Precision Fires modernization priority. Procurement and fielding of the LRHW to defeat Anti Access/Area Denial (A2/AD) capabilities, suppress adversary Long Range Fires, and engage other high payoff/time critical targets. The Army is working collaboratively with the Navy in the development of the LRHW. The LRHW system consists of the All-Up Rounds (AUR) plus Canister (AUR+C) which includes the Common Hypersonic Glide Body (CHGB) with the Navy 34.5-inch booster, the Battery Operations Center (BOC) for command and control (C2), and the Transporter Erector Launcher (TEL). An LRHW Battery contains a basic load of eight AUR+Cs plus a reload of eight, one BOC, four TELs, and other ground equipment including AUR emulators for soldier training purposes. Additionally, the LRHW will use a modified version of an existing C2 network, the Advanced Field Artillery Tactical Data System (AFATDS). The Army is procuring two Batteries of Ground Support Equipment (GSE) and GSE to stand up the Institutional Training Base (ITB) under a Middle Tier of Acquisition Rapid Fielding pathway. This funding line also includes procurement of tactical AUR+Cs and their associated Common Hypersonic Glide Bodies (CHGBs) as Government Furnished Equipment.
Justification
Justification — LONG-RANGE HYPERSONIC WEAPON
The FY 2026 request for Long-Range Hypersonic Weapon includes $353,415 thousand of discretionary and $85,000 thousand of mandatory (reconciliation) for a total of $438,415 thousand. The mandatory funds procure ten reload trailers in FY 2026. Further information for this reconciliation request is provided in Chapter (20004) of the Reconciliation Exhibit. The FY 2026 discretionary (Base) procurement dollars fund the production of three All-Up Round + Canisters (AUR+Cs) and twelve Emulators. The FY 2026 procurement also funds Government Furnished Equipment (GFE), refurbishment of GSE test articles, GSE software maintenance, retrofitting of Battery 1 GSE, Interim Contractor Support (CLS cost element), and Government Program Management, Engineering, and Logistics Support. Funding decrease from FY 2025 to FY 2026 is due to the procurement of five fewer AUR+Cs and no Transporter Erector Launchers (TELs) or Battery Operations Centers (BOCs) being procured in FY 2026.
Budget Line Items(workbook-cited)
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Missile Procurement, Army | A | FY24 Actuals | $62.8M |
| Missile Procurement, Army | A | FY25 Enacted | $669.2M |
| Missile Procurement, Army | A | FY26 Disc. Request | $353.4M |
| Missile Procurement, Army | A | FY26 Reconciliation | $85.0M |
| Missile Procurement, Army | A | FY26 Total | $438.4M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $249.3M | $62.8M | $669.2M | $353.4M | $353.4M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →