Skip to content
Fiscal Receipts

Joint Air-to-Ground MSLS (JAGM)

ArmyProcurementReconciledBLI2605C70302
Watch this program

Published budget signals for this program, with links to receipts.

Updates appear after a data refresh and publication. No fixed update schedule is available.

Paste the RSS address into a feed reader. No Fiscal Receipts account is required.

RSSAtom

What it is
Joint Air-to-Ground MSLS (JAGM) (2605C70302) is an Army procurement line funded in the Missile Procurement, Army account.
What changed
+$37.1M FY25→26 P-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 1 linked award record is listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$350.7MP-1 TOA · PB2026
FY25 Enacted
$47.6MP-1 TOA · PB2026
FY26 Request
$84.7MP-1 TOA · PB2026
FY25→26 Change
+$37.1MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $350.7MFY25: $47.6MFY26: $84.7MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$350.7M
FY25$47.6M
FY26$84.7M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$147.2M$216.0M$350.7M
Enacted–$216.0M$303.4M$47.6M
Request––$303.4M$47.6M$84.7M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $303.4M for FY2024; the PB2026 book reported $350.7M as actual total obligation authority — $47.3M above the request. 350.7 − 303.4 = 47.3 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Joint Air-to-Ground MSLS (JAGM)

The AGM-179 Joint Air-to-Ground Missile (JAGM) program is an Army-led, Acquisition Category (ACAT) 1C Major Defense Acquisition Program (MDAP) with joint interest from Navy, Marine Corps, and Air Force. JAGM is the Army's, multi-mode, air-to-ground munition replacing HELLFIRE (HF) and HF Longbow tactical missiles. JAGM is a full-rate production item that addresses five Army Aviation extremely high risk and two high risk capability gaps. JAGM is the only munition that is effective against all target sets listed in the US Army Aviation Lethality Strategy. JAGM is the primary precision munition for attack helicopter operations and the only precision missile in production that is qualified airworthy for Army Aviation attack helicopter operations. JAGM is used for destruction of high-value land and maritime targets, moving or stationary, launches from any platform currently firing HF from a US Army-issued M299 launcher. The JAGM range is 8km, and the manufacturer has demonstrated range capability to 16km, the objective range requirement. 16km would provide missile parity with Apache Helicopter advanced sensors and make Apache crews capable of engaging Army Aviation medium range targets. JAGM's dual-mode seeker utilizes a Millimeter Wave (MMW) radar and Semi-Active Laser (SAL), multi-mode guidance section. The multi-mode capability provides fire-and-forget and precision-point targeting as well as unique, blended modes of each, for improved capability over legacy munitions. The JAGM Captive Air Training Missile (CATM) is an airworthy training missile that consists of a JAGM guidance section that receives crew inputs for target engagement training and to evaluate gunnery requirements without expending live ordinance.

Justification

Justification — Joint Air-to-Ground MSLS (JAGM)

Total FY 2026 procurement dollars in the amount of $84.667 million support the procurement of 178 missiles and 25 Captive Air Training Missiles (CATM). Funding increase from FY 2025 to FY 2026 is due to an increased requirement for JAGM missiles. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and Foreign Military Sales (FMS) to increase procurement of JAGM and address safety, reliability, affordability, producibility and obsolescence. The Air-to-Ground Missile Systems Product Office is the procurement agent for all services. The Army Acquisition Objective is 20,303. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Missile Procurement, ArmyAFY24 Actuals$350.7M
Missile Procurement, ArmyAFY25 Enacted$47.6M
Missile Procurement, ArmyAFY26 Disc. Request$84.7M
Missile Procurement, ArmyAFY26 Total$84.7M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$1.33B$350.7M$47.6M$84.7M$84.7M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the A appropriation, program element 2605C70302 (Joint Air-to-Ground MSLS (JAGM)), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the A appropriation, program element 2605C70302 (Joint Air-to-Ground MSLS (JAGM)), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSAProcurement appropriation2605C7030284.7M FY26W31P4Q15C0102LOCKHEED MARTIN CORPORATION357.5MLockheed Martin CorpFL-10

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
FL-10$356.6M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
LOCKHEED MARTIN CORPORATIONW31P4Q15C0102high

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Joint Air-to-Ground MSLS (JAGM). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.