What it is
CAD/PAD, All Types (2420E61000) is an Army procurement line funded in the Procurement of Ammunition, Army account.
What changed
+$5.97M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$6.56MP-1 TOA · PB2026
FY25 Enacted
$6.57MP-1 TOA · PB2026
FY26 Request
$12.5MP-1 TOA · PB2026
FY25→26 Change
+$5.97MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $6.56MFY25: $6.57MFY26: $12.5MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$6.56M
FY25$6.57M
FY26$12.5M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$4.60M$7.64M$6.56M
Enacted–$7.64M$6.56M$6.57M
Request––$6.56M$6.57M$12.5M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — CAD/PAD, All Types

This budget line is for safety critical Cartridge Actuated Devices (CAD) and Propellant Actuated Devices (PAD), which are used on rotary winged Army aircraft. CAD/PADs support aircraft escape, fire suppression, and jettison systems. Items are subject to shelf and service life restrictions and, therefore, require replacement at specified intervals. CAD/PAD devices are procured in accordance with their shelf/service life and are made up of, but not limited to: MS81-87 Shielded Det Cord; MS94-97 Canopy Egress Assembly; MS91-92 Flexible Det Cord; MT06/DWEA Initiator Cartridge; SP02/03 Det Cord Assembly; WB53/MT20/TY60 Fire Bottle Cartridge; MD66/JM92 Stores Release Cartridge; MJ20 Thruster Assembly and Cartridge; MJ20 Inert Thruster without Cartridge; MJ21 Impulse Cartridge; MU02 Hoist Cutter Cartridge; MU34 Hoist Refire Kit; M514 Hoist Cutter Cartridge; DWGS Cable Cutter Assembly; JM96 Chinook Impulse Cartridge; MD65 Initiator Cartridge - Air Volcano stores release. CAD/PAD Procurements are awarded by the Navy Contracting Center in Mechanicsburg, PA and the Naval Surface Warfare Center (NSWC) in Indian Head.

Justification

Justification — CAD/PAD, All Types

The FY 2026 Budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with Department of Defense Instruction 3000.04 (Munitions Requirements Process) and Army Regulation 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of Defense (OSD) approved Combatant Commander Operational Plans, Homeland Defense, and other OSD-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), these items are necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2026 Total Base procurement dollars of $12.543 million will be used for procurement of various CAD/PADs that need replacement due to limited shelf life and/or install life. The FY 2026 program is required to assure availability of replacement items when needed or for mandatory "time-change" procedures for already installed devices to avoid grounding aircraft or rendering aircraft partially mission capable. This funding is required to support fleet requirements that take into account the aircraft inventory, maintenance cycle, shelf/install life, procurement lead-times, and expenditures. Due the variability of these factors, actual CAD/PAD end items and the quantities procured may vary. FY 2025 to FY 2026 funding increase is due to increase in cost for linear CADs used on the AH-64 Apache, which require 100% Neutron Radiography (N-Ray) inspection. General Electric (GE) Hitachi which was the source of 70% of N-Ray capacity closed their facility. The source for 30% of the N-Ray capacity is limited and cannot go beyond their current rate. The cost of the only remaining source, which acquired the closed GE Hitachi facility, far exceeds the original GE Hitachi cost. Unavoidable use of this supplier due to capacity constraints has increased the units' costs of all linear CADs in the DoD. The CAD/PAD commercial industrial base has a limited amount of capable producers. There are Tri-Service efforts to develop additional sources to increase competition and expand production capacity for these items. These efforts will alleviate cost and schedule risk to the program.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Procurement of Ammunition, ArmyAFY24 Actuals$6.56M
Procurement of Ammunition, ArmyAFY25 Enacted$6.57M
Procurement of Ammunition, ArmyAFY26 Disc. Request$12.5M
Procurement of Ammunition, ArmyAFY26 Total$12.5M

Exhibit P-1R

AccountOrgTypeAmount
Procurement of Ammunition, ArmyAFY24 Actuals$1.25M
Procurement of Ammunition, ArmyAFY25 Enacted$1.25M
Procurement of Ammunition, ArmyAFY 2026 request$2.38M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$177.3M$6.56M$6.57M$12.5M$12.5M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not CAD/PAD, All Types. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.